[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-110826-en":3,"doc-seo-110826-105":29,"detail-sidebar-cat-0-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},110826,962075114765,"Quinn","https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd",8,"Research & Report","Overview of Status of Implementation of Ongoing Management Action Plans - Prepared in Response to Inspection Panel Investigation Reports","This document provides an overview of the status of implementing management’s action plans prepared in response to Inspection Panel investigation reports. It summarizes the latest progress and the next reporting deadlines for multiple case projects across different countries, and highlights completion status where applicable. It also details specific activity areas, including water loss monitoring and alternative water source planning, along with resettlement and livelihood restoration actions, tracking outstanding items and ongoing supervisory work.","Public Disclosure Authorized Public Disclosure Authorized  \nJuly 27, 2021  \nOverview of Status of Implementation of Ongoing Management Action Plans  \nPrepared in Response to Inspection Panel Investigation Reports  \n\n| \\# | PROJECT | LATEST PROGRESS REPORT1 | NEXT PROGRESS REPORT DUE |\n| --- | --- | --- | --- |\n| 1 | Albania – Integrated Coastal Zone Management and CleanUp Project\u003Cbr>(IPN Case \\#47) | 4th progress report, January 2012 | Final Note upon completion of\u003Cbr>all court proceedings in Albania (no predictable timeline) |\n| 2 | India – Vishnugad Pipalkoti Hydro Electric Project (IPN Case \\#81) | 6th progress report, February 2021 | 7th progress report, February 2022 |\n| 3 | Democratic Republic of Congo – Second Additional Financing for the High-Priority Roads Reopening and Maintenance Project (ProRoutes) (IPN Case \\#120) | 3rd and final progress report, January 2021 | N/A |\n| 4 | Uganda – Water Management and Development Project & Private Power Generation (Bujagali) Project | 2nd progress report, July 2021 | 3rd progress report, July 2022 |\n| 5 | Brazil – Teresina Enhancing Municipal Governance and Quality of Life Project Additional Financing | N/A | 1st progress report December 2021 |\n\n1 Reporting intervals may vary according to the Board’s specific request at the time of Action Plan approval.  \n1. Albania – Integrated Coastal Zone Management and Clean-Up Project  \nFourth Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#46596-AL) on the Albania Integrated Coastal Zone Management and Clean-up Project (IDA Credit No. 4083-ALB), January 13, 2012.  \nAll actions of the Management Action Plan are completed with the exception of the continuing implementation of the independently monitored judicial review. The fourth progress report provided details on actions related to the review. It also recorded the completion of the Social Vulnerability Assessment and actions related to communication with civil society and the business community, and the implementation progress of the restructured Project to date.  \nThis was the last Progress Report that Management submitted concerning implementation of the actions of the Management Action Plan. However, along with its monitoring of the progress on Project activities, the Bank will continue to monitor the progress of the case-by-case judicial review by utilizing a team of independent observers. Upon completion of the District Court and Court of Appeals processes, Management will issue a final report to the Board of Executive Directors concerning the outcomes of the cases.  \n2. India-Vishnugad Pipalkoti Hydro Electric Project  \nSixth Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#89109-IN) on the India Vishnugad Pipalkoti Hydro Electric Project (Loan No. 8078-IN), February XX, 2021.  \nDETAILED STATUS OF ACTIVITIES IN THE MAP  \n\n| MANAGEMENT ACTION | STATUS OF MANAGEMENT ACTION |\n| --- | --- |\n| Water Loss and Alternative Water Sources:\u003Cbr>THDC conducts regular monitoring surveys ofthe 66 water sources, using both videography and flow measurement. Ifa water source dries up, THDC will design a replacement, in coordination with the affected villages, based on options including the following: (i) new gravity-fed water supply systems;\u003Cbr>(ii) reservoirs or cisterns for village bulk supply, filled either by diverting flow from a nearby stream, by pumping water from another source or by water trucks; or (iii) rechanneling the water source.\u003Cbr>Management will monitor the evolution of the water sources, and, ifa water source dries up, assess the proposed replacement option, and supervise the implementation of works. The team will include water and sanitation specialists. | This action has been completed.\u003Cbr>THDC continues videography and flow measurement, to monitor water sources on a six-monthly basis, and maintainsa state of readiness to develo","cbCaij7QFrKF0tFb","https://ap.wps.com/l/cbCaij7QFrKF0tFb","pdf",508695,1,22,"English","en",105,"# Project Implementation Overview\n## Country and Project Status Summary\n## Detailed Status of Activities (Management Actions)\n## Water Loss and Alternative Water Sources\n## Resettlement and Livelihood Restoration","[{\"question\":\"What is the purpose of the document?\",\"answer\":\"It summarizes the status of implementing ongoing management action plans prepared in response to Inspection Panel investigation reports, including progress milestones and upcoming reporting requirements.\"},{\"question\":\"Which projects are covered in the status overview?\",\"answer\":\"The document covers multiple country projects, including Albania, India, the Democratic Republic of Congo, Uganda, and Brazil, each with a latest progress update and a next progress report due date.\"},{\"question\":\"What key activity areas are detailed for India’s project implementation?\",\"answer\":\"The document provides detailed status for water loss and alternative water sources, including monitoring and replacement options, and for resettlement and livelihood restoration, including outstanding actions and engagement with affected families.\"}]",1784487271,55,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":27},"overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports","",{"@graph":35,"@context":84},[36,53,67],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports/110826/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What is the purpose of the document?","Question",{"text":74,"@type":75},"It summarizes the status of implementing ongoing management action plans prepared in response to Inspection Panel investigation reports, including progress milestones and upcoming reporting requirements.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"Which projects are covered in the status overview?",{"text":79,"@type":75},"The document covers multiple country projects, including Albania, India, the Democratic Republic of Congo, Uganda, and Brazil, each with a latest progress update and a next progress report due date.",{"name":81,"@type":72,"acceptedAnswer":82},"What key activity areas are detailed for India’s project implementation?",{"text":83,"@type":75},"The document provides detailed status for water loss and alternative water sources, including monitoring and replacement options, and for resettlement and livelihood restoration, including outstanding actions and engagement with affected families.","https://schema.org",{"og:url":51,"og:type":86,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,96,100,104,109,114,119,122,127,130,134],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":93,"show_sort_weight":94,"slug":95},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":97,"show_sort_weight":98,"slug":99},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":101,"show_sort_weight":102,"slug":103},"Exam",70,"exam",{"id":105,"doc_module":4,"doc_module_name":45,"category_name":106,"show_sort_weight":107,"slug":108},5,"Comic",60,"comic",{"id":110,"doc_module":4,"doc_module_name":45,"category_name":111,"show_sort_weight":112,"slug":113},6,"Technology",50,"technology",{"id":115,"doc_module":4,"doc_module_name":45,"category_name":116,"show_sort_weight":117,"slug":118},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":120,"slug":121},30,"research-report",{"id":123,"doc_module":4,"doc_module_name":45,"category_name":124,"show_sort_weight":125,"slug":126},9,"Religion & Spirituality",20,"religion-spirituality",{"id":125,"doc_module":4,"doc_module_name":45,"category_name":128,"show_sort_weight":125,"slug":129},"World Cup","world-cup",{"id":131,"doc_module":4,"doc_module_name":45,"category_name":132,"show_sort_weight":131,"slug":133},10,"Lifestyle","lifestyle",{"id":135,"doc_module":4,"doc_module_name":45,"category_name":136,"show_sort_weight":105,"slug":137},19,"General","general"]