[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-109659-en":3,"doc-seo-109659-105":31,"detail-sidebar-cat-0-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":28,"seo_description":14,"update_tm":29,"read_time":30},109659,13056703019404,"Miles","https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",8,"Research & Report","Overview of Status of Implementation of Ongoing Management Action Plans - Prepared in Response to Inspection Panel Investigation Reports","December 21, 2020 overview detailing the status of implementation of ongoing management action plans prepared in response to Inspection Panel investigation reports. The document summarizes latest progress and next reporting deadlines across multiple country projects, including Albania, India, the Democratic Republic of Congo, Uganda, and Brazil. It describes completed actions, ongoing monitoring steps such as judicial review case-by-case processes, and detailed activity status aligned to specific panel findings, including mitigation measures, resettlement and livelihood restoration progress, and operational readiness updates.","Public Disclosure Authorized Public Disclosure Authorized  \nDecember 21, 2020  \nOverview of Status of Implementation of Ongoing Management Action Plans  \nPrepared in Response to Inspection Panel Investigation Reports  \n\n| \\# | PROJECT | LATEST PROGRESS REPORT 1 | NEXT PROGRESS REPORT DUE |\n| --- | --- | --- | --- |\n| 1 | Albania – Integrated Coastal Zone Management and CleanUp Project\u003Cbr>(IPN Case \\#47) | 4th progress report, January 2012 | Final Note upon completion of\u003Cbr>all court proceedings in Albania (no predictable timeline) |\n| 2 | India – Vishnugad Pipalkoti Hydro Electric Project (IPN Case \\#81) | 5th progress report, February 2020 | 6th progress report, February 2021 |\n| 3 | Democratic Republic of Congo – Second Additional Financing for the High-Priority Roads Reopening and Maintenance Project (ProRoutes) (IPN Case \\#120) | 2nd progress report, March 2020 | 3rd progress report, April 2021 |\n| 4 | Uganda – Water Management and Development Project & Private Power Generation (Bujagali) Project | 1st progress report, July 2020 | 2nd progress report, July 2021 |\n| 5 | Brazil – Teresina Enhancing Municipal Governance and Quality of Life Project Additional Financing | N/A | 1st progress report December 2021 |\n\n1 Reporting intervals may vary according to the Board’s specific request at the time of Action Plan approval.  \n1. Albania – Integrated Coastal Zone Management and Clean-Up Project  \nFourth Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#46596-AL) on the Albania Integrated Coastal Zone Management and Clean-up Project (IDA Credit No. 4083-ALB), January 13, 2012.  \nAll actions of the Management Action Plan are completed with the exception of the continuing implementation of the independently monitored judicial review. The fourth progress report provided details on actions related to the review. It also recorded the completion of the Social Vulnerability Assessment and actions related to communication with civil society and the business community, and the implementation progress of the restructured Project to date.  \nThis was the last Progress Report that Management submitted concerning implementation of the actions of the Management Action Plan. However, along with its monitoring of the progress on Project activities, the Bank will continue to monitor the progress of the case-by-case judicial review by utilizing a team of independent observers. Upon completion of the District Court and Court of Appeals processes, Management will issue a final report to the Board of Executive Directors concerning the outcomes of the cases.  \n2. India-Vishnugad Pipalkoti Hydro Electric Project  \nFifth Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#89109-IN) on the India Vishnugad Pipalkoti Hydro Electric Project (Loan No. 8078-IN), February 7, 2020.  \nDETAILED STATUS OF ACTIVITIES IN THE MAP  \n\n| PANEL FINDING | STATUS OF MANAGEMENT ACTION |\n| --- | --- |\n| 1. Water loss and alternative water sources:\u003Cbr>The Panel found that Management complied with OP/BP 4.01 by undertaking the baseline studies to document village water sources along the tunnel alignment routes and ensuring that THDC committed to provide alternative water sources in the event that an existing source was lost. However, the Panel found that the Bank did not identify detailed and adequate mitigation measures that could be operationalized if a water source were lost, in non-compliance with OP/BP 4.01. | Completed.\u003Cbr>Mitigation measures have been operationalized, with baseline studies to document water sources of all villages along the tunnel alignment routes, and a detailed report documenting alternative or additional water sources being completed in September 2014. THDC continues videography and flow measurement, to monitor water sources on a six-monthly basis, and maintains a state of readiness to develop alternative ","cbCainlKNfnWkIn3","https://ap.wps.com/l/cbCainlKNfnWkIn3","pdf",567938,3,1,28,"English","en",105,"# Overview\n## Albania – Integrated Coastal Zone Management and Clean-Up Project\n## India – Vishnugad Pipalkoti Hydro Electric Project\n## Detailed Status of Activities in the MAP\n## Next Progress Report Deadlines","[{\"question\":\"What is the purpose of these management action plans overview?\",\"answer\":\"It provides a status update on implementation of ongoing management action plans prepared in response to Inspection Panel investigation reports across multiple projects.\"},{\"question\":\"What does the document report for Albania’s project actions?\",\"answer\":\"It states that all management action plan actions are completed except for continued implementation of independently monitored judicial review, with a final board report planned after court processes conclude.\"},{\"question\":\"How does the document track activity status for India’s project?\",\"answer\":\"It lists panel findings alongside the management action status, covering items such as water loss mitigation measures and resettlement and livelihood restoration progress.\"}]","Overview of Status of Implementation of Ongoing Management Action Plans - Prepared in Response to Inspection Panel Investigation Reports | PDF",1784481775,71,{"code":4,"msg":32,"data":33},"ok",{"site_id":25,"language":24,"slug":34,"title":13,"keywords":35,"description":14,"schema_data":36,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":29},"overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports","",{"@graph":37,"@context":86},[38,54,69],{"@type":39,"itemListElement":40},"BreadcrumbList",[41,45,49,51],{"item":42,"name":43,"@type":44,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":46,"name":47,"@type":44,"position":48},"https://docshare.wps.com/document/","Document",2,{"item":50,"name":12,"@type":44,"position":20},"https://docshare.wps.com/document/research-report/",{"item":52,"name":13,"@type":44,"position":53},"https://docshare.wps.com/document/overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports/109659/",4,{"url":52,"name":13,"@type":55,"author":56,"headline":13,"publisher":58,"fileFormat":61,"inLanguage":24,"description":14,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":42,"name":59,"@type":60},"DocShare","Organization","application/pdf","2026-07-30","2026-07-19",true,{"@type":66,"interactionType":67,"userInteractionCount":20},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What is the purpose of these management action plans overview?","Question",{"text":76,"@type":77},"It provides a status update on implementation of ongoing management action plans prepared in response to Inspection Panel investigation reports across multiple projects.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"What does the document report for Albania’s project actions?",{"text":81,"@type":77},"It states that all management action plan actions are completed except for continued implementation of independently monitored judicial review, with a final board report planned after court processes conclude.",{"name":83,"@type":74,"acceptedAnswer":84},"How does the document track activity status for India’s project?",{"text":85,"@type":77},"It lists panel findings alongside the management action status, covering items such as water loss mitigation measures and resettlement and livelihood restoration progress.","https://schema.org",{"og:url":52,"og:type":88,"og:title":13,"og:site_name":59,"og:description":14},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":93},[94,98,102,106,111,116,121,124,129,132,136],{"id":21,"doc_module":4,"doc_module_name":47,"category_name":95,"show_sort_weight":96,"slug":97},"Story & Novel",90,"story-novel",{"id":48,"doc_module":4,"doc_module_name":47,"category_name":99,"show_sort_weight":100,"slug":101},"Literature",80,"literature",{"id":53,"doc_module":4,"doc_module_name":47,"category_name":103,"show_sort_weight":104,"slug":105},"Exam",70,"exam",{"id":107,"doc_module":4,"doc_module_name":47,"category_name":108,"show_sort_weight":109,"slug":110},5,"Comic",60,"comic",{"id":112,"doc_module":4,"doc_module_name":47,"category_name":113,"show_sort_weight":114,"slug":115},6,"Technology",50,"technology",{"id":117,"doc_module":4,"doc_module_name":47,"category_name":118,"show_sort_weight":119,"slug":120},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":47,"category_name":12,"show_sort_weight":122,"slug":123},30,"research-report",{"id":125,"doc_module":4,"doc_module_name":47,"category_name":126,"show_sort_weight":127,"slug":128},9,"Religion & Spirituality",20,"religion-spirituality",{"id":127,"doc_module":4,"doc_module_name":47,"category_name":130,"show_sort_weight":127,"slug":131},"World Cup","world-cup",{"id":133,"doc_module":4,"doc_module_name":47,"category_name":134,"show_sort_weight":133,"slug":135},10,"Lifestyle","lifestyle",{"id":137,"doc_module":4,"doc_module_name":47,"category_name":138,"show_sort_weight":107,"slug":139},19,"General","general"]