[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-673211-105":59,"doc-detail-673211-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","overhead-crane-and-hoist-inspection-checklist-frequent-and-periodic-requirements","Overhead Crane and Hoist Inspection Checklist - Frequent and Periodic Requirements","","Overhead cranes and hoists require inspection before use, following WAC 296-24-23519. This checklist provides frequent (monthly) inspection items, periodic inspection requirements for equipment idle beyond set intervals, and wire rope/chain inspection guidance. Operators or designated persons conduct pre-operation checks and must address deficiencies before operation. Completed inspection logs are signed, dated, and retained for one year, with periodic work performed by qualified personnel.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/overhead-crane-and-hoist-inspection-checklist-frequent-and-periodic-requirements/673211/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/overhead-crane-and-hoist-inspection-checklist-frequent-and-periodic-requirements/673211.png","ImageObject",300,407,{"name":92,"@type":93},"Stanley","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-11-02",true,{"@type":101,"interactionType":102,"userInteractionCount":8},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"Who must perform the inspection and when is it required?","Question",{"text":111,"@type":112},"The operator or another designated person performs the inspection before crane/hoist use. Pre-operation inspection must be completed using the frequent checklist items.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"How do inspection requirements change if the crane/hoist is idle?",{"text":116,"@type":112},"Idle for 1 to 6 months requires a documented frequent inspection before use, while idle for more than 6 months requires a documented periodic inspection before use.",{"name":118,"@type":109,"acceptedAnswer":119},"What happens if deficiencies are found during inspection?",{"text":120,"@type":112},"Deficiencies identified during pre-operation inspection must be corrected before use. Any overhead crane/hoist with deficiencies identified during an inspection must be tagged out of service, repaired, or corrected before use.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},673211,1793624824,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":128,"read_time":142},2336477405376,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Overhead Crane and Hoist Inspection Checklist\nPer the regulation \u0013 HYPERLINK \"https://apps.leg.wa.gov/wac/default.aspx?cite=296-24-23519\" \u0014WAC 296-24-23519\u0015, overhead cranes and hoists must be inspected before use. Inspection procedures for overhead cranes are divided into two general classifications, based on the interval at which inspection should be performed: frequent and periodic.\nThis Overhead Cranes/Hoists Inspection Checklist contains frequent inspection requirements, periodic inspection requirements, and wire rope/chain inspection information for overhead cranes and hoists.\nComplete a pre-operation inspection using the frequent checklist items on the inspection checklist prior to crane/hoist use.\nThe operator or other designated person conducts the inspection.\nCranes/Hoists in regular use must have a documented inspection checklist at least monthly using the frequent inspection.\nCranes/Hoists idle for 1 to 6 months must have a documented frequent inspection before use.\nCranes/Hoists idle for more than 6 months must have a documented periodic inspection before use (refer to instructions below).\nDeficiencies identified during the pre-operation inspection must be addressed before use.\nInspectors must sign and date the inspection log or checklist to confirm completion.\nInspectors must keep a record of all frequent and periodic inspections for one year.\nPeriodic inspections must be completed by qualified personnel. Overhead cranes and hoists in regular use must have a periodic inspection at least annually. Refer to the \u0013 HYPERLINK \"https://www.ehs.washington.edu/workplace/shop-and-maker-space-safety/cranes-hoists-and-rigging-safety\" \u0014Cranes, Hoists and Rigging Safety webpage\u0015 on the EH&S website for more information on periodic inspections and a list of Seattle area crane inspection firms with qualified personnel.\nAny overhead cranes/hoists with deficiencies identified during an inspection must be tagged “out of service,” repaired, or corrected before use. All active cranes should have regular preventive maintenance performed in accordance with the manufacturer’s recommendations.\n\u000f\nOverhead Crane and Hoist Inspection Checklist\nType of crane: \u0013 FORMTEXT \u0014     \u0015________________________________________\tCrane capacity (tons): \u0013 FORMTEXT \u0014     \u0015_________\nLocation: \u0013 FORMTEXT \u0014     \u0015____________________________________________\tHoist capacity (tons): \u0013 FORMTEXT \u0014     \u0015_________\nItem\nInspection Frequency:\n* = required\nPart of Crane/Hoist to be Inspected\nInspect for:\nEquipment Condition:\nFrequent (once per month)\nPeriodic (more than 6 months)\nOK\nFaulty\nN/A\n1\n*\n*\nControls and operating mechanisms (includes pendant)\nImproper adjustments, excessive wear, and unusual noises; ensure all controls function properly and each performs as marked.\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n2\n*\n*\nLines, Tanks, Valves, and Other Parts in Air or Hydraulic Systems\nDeterioration or leakage\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n3\n*\n*\nHooks\nDeterioration or cracks; hooks must be thrown away immediately if:\na) Throat opening is more than 15% in excess of normal throat opening or;\nb) Hook tip is more than 10° twist from the plane of the unbent hook.\nc) safety latch\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n4\n*\n*\nChains and End Connections\nExcessive wear, twist, stretch or distortion of links beyond manufacturer’s specs\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n5\n*\n*\nSafety Devices, Belt-Chain Gear Guards\nImproperly adjusted, missing, or broken\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n6\n*\n*\nOutriggers\nLocking devices and general condition foundation and cribbing\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n7\n*\n*\nFire Extinguisher (readily accessible)\nMissing or discharged\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n\u0013 FORMCHECKBOX \u0014\u0015\n8\n*\n*\nPre-operational test; upper limit switch operating properly\nVerify proper operation of the upper limit and lower limit devices under no-load conditions.","cbCaivOPDjyABLXI","https://ap.wps.com/l/cbCaivOPDjyABLXI","docx",70801,"English","# Frequent inspection requirements\n## Pre-operation and operator responsibility\n## Monthly inspection items (controls, hooks, chains, safety devices)\n# Periodic inspection requirements\n## Idle-time rules and qualified personnel\n## Documentation, tagging out of service, and maintenance\n# Wire rope/chain inspection checklist\n## Reduction in diameter, broken wires, flat spots, distortion","[{\"question\":\"Who must perform the inspection and when is it required?\",\"answer\":\"The operator or another designated person performs the inspection before crane/hoist use. Pre-operation inspection must be completed using the frequent checklist items.\"},{\"question\":\"How do inspection requirements change if the crane/hoist is idle?\",\"answer\":\"Idle for 1 to 6 months requires a documented frequent inspection before use, while idle for more than 6 months requires a documented periodic inspection before use.\"},{\"question\":\"What happens if deficiencies are found during inspection?\",\"answer\":\"Deficiencies identified during pre-operation inspection must be corrected before use. Any overhead crane/hoist with deficiencies identified during an inspection must be tagged out of service, repaired, or corrected before use.\"}]","Overhead Crane and Hoist Inspection Checklist - Frequent and Periodic Requirements | DOCX",13]