[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-665078-105":59,"doc-detail-665078-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","original-building-drawings-electrical-door-schedule-basement-second-floor","Original-Building-Drawings - Electrical Door Schedule - Basement & Second Floor","","Electrical door schedule and outlet plan details for a building, covering basement and second-floor conditions. Includes labeled device types such as lighting and electrical outlets, referenced switchboard connections, and tabulated door/equipment entries with sizes, remarks, and types. Notes cover installation positioning rules, layout conventions, and exceptions for specific wall and fixture finishes. The drawing set also includes general specification blocks, material key references, and annotated wiring or connectivity guidance across corridors, halls, and related areas.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/original-building-drawings-electrical-door-schedule-basement-second-floor/665078/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/original-building-drawings-electrical-door-schedule-basement-second-floor/665078.png","ImageObject",300,407,{"name":92,"@type":93},"Jiven","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What sections are included in the electrical schedule drawings?","Question",{"text":112,"@type":113},"The document contains a basement door schedule and a “Second Floor, Door Schedule,” along with related plans and notes for electrical outlets and fixtures.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What kind of information appears in the schedule tables?",{"text":117,"@type":113},"Each table entry lists a number, size, remarks, and type, providing structured references for doors and associated electrical components.",{"name":119,"@type":110,"acceptedAnswer":120},"Are there installation or layout rules mentioned?",{"text":121,"@type":113},"Yes. The notes specify how items should be arranged on the plan, including references for positioning and exceptions for certain finishes or wall types.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},665078,1793288420,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},1099513958607,"https://ap-avatar.wpscdn.com/avatar/100002390cf8733938c?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778829742770036399","SuB·BASEMENT DoO.ScHEDULE·  \n2s  \n\n|  | S1ZE   |  | TrPE   |\n| --- | --- | --- | --- |\n|  | 5,?o.   |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  | 3-c“·Ge16”   | S7OCK CD2-8PANEL   |  |\n|  |  |  |  |\n|  | 1防   |  |  |\n|  |  |  |  |\n\nmv EhHWE已F点1H  \nps…0racHEFoH  \n3  \n156:103s'6\"B9!10\"35okgUBDEGLNp ELEC EmDUT To PoLr I25'五FRCNs%.e1EOwde Ll64T2二*  \n4nD FDH.DL三  \nc369  \nDETAL 0F工RC.HTG MAHTE.ENCESEESFEET 86.10.  \n13r  \n□370  \nnlIA岗三42.1s  \n国      网愿m al8alLFZ2圆团37/  \n3q:z发  \n只6  \n368图陋图围图图46I8eWEE二  \nrccTE,SEWEE上1NE恶TPITCH AT LEAST WTo亡c   反Crzsarr一T0SESE HLISH Wirn Bn三ELIOE LINE.5EESDECS5“CL.7EA14CSMC B  w直L1  \n2:6  \n护  \nnwAepa  \nEALRATH况，DBXL—NOLE;AEEAE ALONG FNT OF BLDG.  DAI8 TETO.FOUEDAYION DEAIE2alo”33.o”26936'42e'-933-c206~+  \n'  \n15.5!10”李  \npL  \nFSE SCE A²E TB CAEEIEBSUB-BASEMENT PLANSCALe-%t'o  \n\n| DATE   | N.C.COLIEGEFOD.NEGEOE3  \u003Cbr>ADMINISTDATION BLDG.   |\n| --- | --- |\n| 26   |  |\n| 2EV13ED   |  |\n| |-G-26   | E                 D¹真  \u003Cbr>5CALE施”F0   |\n| 12-G-Z.6□   |  |\n| 1·22.29   |  |\n|  |  |\n|  | A7  \u003Cbr>OD   INc..  \u003Cbr>JeB.147 Acc,3460S新王T   |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\nAppeoVED      ENGINE三D  \n a.C.haal AzCHITEcT  \n\n|  |  |  | NO.   | S1ZE   |  | 2.EMAR.K   | TYPE   |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | OL   | 50°·7-0·8%   |  | GL.+TE.(22W14G)   |  |\n|  |  |  | 02   | 5-0'·7-0”1%”   |  | G1+T尼.(2 SWI5)   | B   |\n|  |  |  | 03   | 5-0”\u003C70°1%   |  | GL.-TE..(25WIT   | B   |\n|  |  |  | 04   | 3-2”,T-0°x994“   |  | TR..   | A   |\n|  |  |  | 0S   | -8\"·7:0·馨   |  | G4.T9..   |  |\n|  |  |  | ce   | 8-2·7-0*x1%”   |  | T.   | A   |\n|  |  |  | 07   | 88“×7*1%   |  | T色.   | A   |\n|  |  |  | 06   | 3:2*×701%“   |  | T见.   | A   |\n|  |  |  | Cy   | 2-6”·70·1%   |  |  | 王   |\n| 7-3”  \u003Cbr>心·Go0ee o   |  |  | 010   | 32”×70·14   |  | GLT4了2   |  |\n|  |  |  | CH   | 5c”*70x1%   |  | GL.+TP.(22WISG)   | β   |\n|  |  |  | O12   | 50·7:0·1%   |  | GL+TE.(ZSWrsG)   | B   |\n|  |  |  | O13   | 5:0·7的、2%   |  | GL.+7B、(Z8N?NGJ   |  |\n|  |  |  | C4   | 32”·70'x1%   |  | TD..   | A   |\n|  |  |  | C15   | 32·7a'。1%   |  | TR.   | A   |\n|  |  |  | 06   | 3-2”·TD\"14   |  | 十起   | 真   |\n|  |  |  | OI7   | 98\".701%   |  | T吧，   | A   |\n|  |  |  | C%E   | z·7:02*14   |  |  | E   |\n|  |  |  | C19   | 3:2·70”x 1%   |  | T愿，   | A   |\n|  |  |  | 020   | 4'4°.7.0\"·1送   |  | -5EE DETAiL   | G   |\n|  |  |  | 自21   | 4-4”170·18   |  | LINED所4 A39ESTo5   | G   |\n|  |  |  | 022   | 2-2×T014   |  |  | G   |\n|  | wzM-  \u003Cbr>二   |  |  |  |  |  |  |\n|  | 7  \u003Cbr>C如要系   | 67  \u003Cbr>61  \u003Cbr>9.s\"   |  |  |  |  |  |\n\nlt  \n人  \nBASEMENT DO0P SCHEDULE15s-ie”0.T0b.r'  \n8z6gc'\"32-10\"T.5\"9'2\"-z\"7'3-9!6”g'6\"i1-s°1o'g克”10i's6\"9-6“↓7%7'39°2z\"十一1  \n山  \nh.c.1L5R  \nM.zche2.ow re  \n'  \n良.  \n115904T=548中r5941SWITCHew209Ww20Yw凸55CU灰E GL一C凹IEM15eYL AB.CGLECT U卫，ERoMPHYS[C 5LAB.lo4rs\"seALE.LayeuT FOE.FIXTU  5-E 2scALE LArOuCELG FUgEpANP PUT1由T  \n-6  \n5T-82呢  \n50AR.D见·  \n\"2;6  \nFT1次工5志0TLET.{co%btowzodw202wfeTDRE5 Mot IMetuDE0呐TH doMTRAC120WDyanwaw(kmFi三TURes HòT wCLUDEp IW TH15\u003CQMTCT5年 二OZ02中色cLoSETMcoLo WETEk pue⑥丝二5本民nR[0 inwCORRIDO卫20w口26loz03  \n\"2:6  \n0=p九叫自  \n2:6  \n83  \n52;年  \nw  \n0l α(w  \nCo2,RIDO卫  \n⑧  \nEITANCEHALL  \nzk⁰6acase a2ENT2ANC里.ALi.7E·dn nee·T.e7zveowPAS三·04tenwl0HEJNG FT片见009.8-45+2ca78-45◎地只sk云De下DRAPo.5TCFFICE·oreDPAINlOoD BAFF斤co战aD12DL5DW1.LEG玩STODE·S24-e”426-29'g\"xeeanCH EMISTPYSTDZES60wonDA2K,20OMMEN's LockED.MMNsTOILETPBYSIC5STOEPSle7H2001002ucw陋Tug al3058TAT  \n6  \n\"二;6  \n,2-6  \n\"=;6  \n3o  \nCd  \n016  \n617  \n5:0  \nfRRsR|5c,2.VENT凤5R.R9B-3中Sre   5ALE PL&N CF9                                   LBUTTr y0UNDATIarπSTA阳T·88eNS-MERE··NOTE5canc REYECHIMNEY TO BE见AGRED OVERFROMLaCAYION 3HCWN ON PLAN TO P05ITIONLIMSTOWE5H0wN BY DQTTED UINES.5TAPT见ACKING66ABOVL TLC0元.MA30MRY T BE 305PEHIDEDFEM FLOOR,GONSTEICTCN ABOWE Wru笼RODS,BI6K  \nKEY TO MATERIALS  \n9B-27  \nALL RADATORz TH5 FLDO TQ 8把3IGHMITW·4E'1EG8·EXCEPT·A5 NOTED   THOLL画w TILERADS MEKE勤·98·AREWALL-TVPE\"Ts9²e9z'7'440292g2\",4信8'6”19-4”B'-n442,gz'ge40吃7492\"9'2'73\"ALLDMENSION n r519 PLAN E","cbCaighQed7G32N5","https://ap.wps.com/l/cbCaighQed7G32N5","pdf",35346134,44,"English","# Basement Door Schedule\n## Key notes and materials\n# Second Floor, Door Schedule\n## Symbol legend and outlet types","[{\"question\":\"What sections are included in the electrical schedule drawings?\",\"answer\":\"The document contains a basement door schedule and a “Second Floor, Door Schedule,” along with related plans and notes for electrical outlets and fixtures.\"},{\"question\":\"What kind of information appears in the schedule tables?\",\"answer\":\"Each table entry lists a number, size, remarks, and type, providing structured references for doors and associated electrical components.\"},{\"question\":\"Are there installation or layout rules mentioned?\",\"answer\":\"Yes. The notes specify how items should be arranged on the plan, including references for positioning and exceptions for certain finishes or wall types.\"}]","Original-Building-Drawings - Electrical Door Schedule - Basement & Second Floor | PDF",111]