[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-646289-105":59,"doc-detail-646289-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","operator-manual-amw-b-series-installation-start-up-procedure-water-connection-electrical-connection","OPERATOR MANUAL - AMW B-SERIES - INSTALLATION START UP PROCEDURE - WATER CONNECTION - ELECTRICAL CONNECTION","","Operator manual for AMW B-SERIES installation and startup, detailing NSF requirements for water hook-up and safe plumbing practices. Includes guidance for connecting a 1/4” pressurized water line, purging debris, confirming minimum and maximum water pressure, and handling single-head operation without pressurized supply. Covers electrical connections via a rear-to-terminal block wiring method, dual-voltage switch settings, and startup timing with fill delays and readiness indicators, plus power requirement specifications and controller adjustments.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/operator-manual-amw-b-series-installation-start-up-procedure-water-connection-electrical-connection/646289/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/operator-manual-amw-b-series-installation-start-up-procedure-water-connection-electrical-connection/646289.png","ImageObject",300,407,{"name":92,"@type":93},"Jordan Avery","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-27","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What NSF requirements apply to the water connection for the machine?","Question",{"text":112,"@type":113},"Use a quick disconnect water connection or enough coiled tubing to move the machine for cleaning underneath. Install an approved backflow prevention device such as a double check valve between the machine and the water supply.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What are the minimum and maximum water pressure limits to the machine?",{"text":117,"@type":113},"Minimum water pressure is 30 psi, and maximum water pressure is 80 psi.",{"name":119,"@type":110,"acceptedAnswer":120},"How should electrical wiring be connected for the brewer?",{"text":121,"@type":113},"Remove the front panel, connect the electrical service through the rear of the machine to the terminal block inside the front panel labeled L1, N, and L2, then reinstall the front panel and turn on the electrical service.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},646289,1793123271,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":36},1099523882367,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","OPERATOR MANUAL  \nAMW B-SERIES  \nINSTALLATION  \nSTART UP PROCEDURE  \nWATER CONNECTION  \nThe National Sanitation Foundation requires the following for an NSF approved water hook-up:  \n• A quick disconnect water connection or enough coiled tubing so that the machine can be moved for cleaning underneath.  \n• An approved backflow prevention device, such as a double check valve to be installed between the machine and water supply.  \nA 1/4” male flare adapter is provided. Installation to a water filter system is recommended to prevent lime and scale build-up in the machine.  \n• Water pipe connections and fixtures directly connected to portable water supply shall be sized, installed and maintained in accordance with federal, state and local codes.  \n• Flush the water line to purge any debris from the supply line.  \nConnect a 1/4” pressurized water line to the 1/4” male connection (on rear of brewer) and turn the water supply on.  \na) Minimum water pressure to the machine: 30 psi  \nb) Maximum water pressure to the machine: 80 psi  \nNOTE: Single head machines may be used without a pressurized water supply. (See Pour-Over Mode section)  \nELECTRICAL CONNECTION  \nNOTE: Wiring connections should be performed by a qualified technician.(Refer to serial tag to verify model number of your machine)  \n• Remove front panel.  \n• Connect electrical service through rear of machine to terminal block (inside front panel) marked L1, N, and L2 . (See Figures A and B)  \n• On dual volt units, flip voltage switch (inside front panel next to terminal block) to 120V for 120 Volt service or 240V for 120/208, or  \n120/240 Volt service. (See Figures A, B and table below)  \n• Re-install front panel.  \n• Turn on (plug-in) electrical service to brewer.  \n• Water tank will fill after a 7-second delay. The machine will make a hissing sound when this occurs. On single head models, allow  \nL1 N L2  \nFor 120V, 15A or 20A Service  \n(2 Wire + Ground)  \nON DUAL VOLT UNITS,  FLIP SWITCH TO “120V”   \nCONNECT NEUTRAL (N) TO MIDDLE  \n CONNECT HOT (L1) TO LEFT SIDE   CONNECT GROUND TO SCREW   \nFigure A  \nFor 120/208-240V, 20A Service  \n(3 Wire + Ground)  \nFigure B  \napproximately 1.5 minutes for the brewer to fill. On two head models, allow approximately five minutes for the brewer to fill.  \nNOTE: If water supply is inadequate or not connected, display will read “P-O” after 4 minutes of fill time (Refer to Pour-Over Mode section) . If Fill Cycle times out and display reads “P-O” before tank is full, turn unit OFF then ON again to reset and continue filling.  \n• The tank will begin heating slightly before machine fills.  \n• Turn brewer on by pressing ON/OFF switch in front of machine. (Light will illuminate)  \n• The brewer settings can be adjusted through the front touch pad. (Refer to Adjustments section)  \n• The water will be hot and the brewer will be ready to brew when “READY” light illuminates.  \n• Set Brew volume. (Refer to Setting Brew Volume section)  \nPOWER REQUIREMENTS: (Refer to serial tag for voltage to be supplied.)  \n\n| Applied Volts | Models | Watts | Amps | NEMA Plug | Cord AWG | Connections |\n| --- | --- | --- | --- | --- | --- | --- |\n| 120 | B-3, B-3WL, B-3WR | 1800 | 15 | 5-15P, 5-20P for CUL | 3X14 | Hot to L1\u003Cbr>Neutral to N\u003Cbr>Ground to ground screw |\n|  | B-SAP, B-ID | 1780 | 14.9 |  |  |  |\n| 120/208 | B-3, B-3WL, B-3WR | 2920 | 14.1 | L14-20P | 4X12 | Hot to L1\u003Cbr>Neutral to N\u003Cbr>Hot to L2\u003Cbr>Ground to ground screw |\n|  | B-SAP, B-ID, B-DAP, B-DGP | 2620 | 12.6 |  |  |  |\n|  | B-6 | 5110 | 24.6 | L14-30P | 4X10 |  |\n|  | B-DAP, B-DGP (30A) | 4510 | 21.7 |  |  |  |\n| 120/240 | B-3, B-3WL, B-3WR | 3800 | 15.9 | L14-20P | 4X12 | Hot to L1\u003Cbr>Neutral to N\u003Cbr>Hot to L2\u003Cbr>Ground to ground screw |\n|  | B-SAP, B-ID, B-DAP, B-DGP | 3500 | 14.6 |  |  |  |\n|  | B-6 | 6600 | 27.5 | L14-30P | 4X10 |  |\n|  | B-DAP, B-DGP (30A) | 6000 | 25 |  |  |  |\n\n Page 2 B-SERIES  \nFACTORY SETTINGS (for each dispense head)  \n• Tank temperature is set at 200 degrees F.  \n• Brew","cbCaifJNbUGajkVi","https://ap.wps.com/l/cbCaifJNbUGajkVi","pdf",965078,16,"English","# Installation\n## Water Connection\n## Electrical Connection\n## Power Requirements\n## Factory Settings\n## Adjustments","[{\"question\":\"What NSF requirements apply to the water connection for the machine?\",\"answer\":\"Use a quick disconnect water connection or enough coiled tubing to move the machine for cleaning underneath. Install an approved backflow prevention device such as a double check valve between the machine and the water supply.\"},{\"question\":\"What are the minimum and maximum water pressure limits to the machine?\",\"answer\":\"Minimum water pressure is 30 psi, and maximum water pressure is 80 psi.\"},{\"question\":\"How should electrical wiring be connected for the brewer?\",\"answer\":\"Remove the front panel, connect the electrical service through the rear of the machine to the terminal block inside the front panel labeled L1, N, and L2, then reinstall the front panel and turn on the electrical service.\"}]","OPERATOR MANUAL - AMW B-SERIES - INSTALLATION START UP PROCEDURE - WATER CONNECTION - ELECTRICAL CONNECTION | PDF",1792755486]