[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650453-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-650453-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","ofp-standard-details-housing-v116","OFP Standard Details - Housing - v1.16","","OFP Standard Details: Housing (v1.16) presents a structured set of construction detailing references for housing projects. It covers ground, mid, and top floor base connections, wall interactions and junctions, openings and window/door components, and roof top and ceiling connection arrangements. The booklet also includes eaves and truss-related details, plus miscellaneous and follow-on trade items such as cavity barriers, gas and electricity services, boiler flues, and drilling/notching of joists and studs.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/ofp-standard-details-housing-v116/650453/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/ofp-standard-details-housing-v116/650453.png","ImageObject",300,407,{"name":42,"@type":43},"Ezra","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What scope of housing construction details does the booklet provide?","Question",{"text":63,"@type":64},"It provides structured reference details across ground, mid, and top floor connections, wall interactions and junctions, openings, and roof/ceiling connection configurations.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which areas are covered under floor connection drawings?",{"text":68,"@type":64},"The document lists ground floor base connections, mid floor connections, and top floor connections, including specific wall-slab and wall-joist combinations.",{"name":70,"@type":61,"acceptedAnswer":71},"Does the booklet include items for follow-on trades and services?",{"text":72,"@type":64},"Yes. It lists follow-on trade details such as cavity barrier locations, gas application installation, electricity meter box, boiler flue, and instructions for drilling/notching joists and studs.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},650453,1793016297,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},1099514068035,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Standard Details: Housing (v1 .16)  \nStandard Details  \nbooklet for housing  \nIssue v1 .16  \n 2  OFP Standard Details: Housing (v1 .16)  \nGround floor base connections  \nA-01 External wall-Ground floor slab  \nA-02 External wall-Ground floor slab with screed  \nA-03 Internal load bearing wall-Ground floor slab  \nA-04 Internal load bearing wall-Ground floor slab with screed  \nA-05 Party wall-Ground floor Slab  \nA-06 Party wall (stepped) -Ground floor slab  \nA-07 Party wall-Ground floor slab with screed  \nA-08 Internal non-load bearing wall-Ground floor slab  \nA-09 Internal non-load bearing wall-Ground floor slab with screed  \nA-10 Steel column down to structural floor level  \nA-11 Steel column down to top of foundation level  \nA-12 Raised soleplate detail-Ground floor slab  \nMid floor connections  \nB-01 External wall-Mid floor open web joists parallel  \nB-02 External wall-Mid floor open web joists perpendicular  \nB-03 Internal load bearing wall-Mid floor open web joists parallel  \nB-04 Internal load bearing wall-Mid floor open web joists perpendicular  \nB-05 Party wall-Mid floor open web joists  \nB-06 Party wall (stepped) -Mid floor open web joists  \nB-07 Internal non-load bearing wall-Mid floor open web joists parallel  \nB-08 Internal non-load bearing wall-Mid floor open web joists perpendicular  \nTop floor  \nC-01  \nC-02  \nC-03  \nC-03a  \nC-04  \nC-05  \nC-06  \nC-07  \nC-08  \nC-09  \nceiling connections  \nEaves-Standard pitched truss  \nEaves-Standard pitched cantilever truss Eaves-Raised tie truss-Seat cut  \nEaves-Raised tie truss-Birdsmouth Top floor ceiling-Gable spandrel  \nTop floor ceiling-Load bearing wall-Trusses over Top floor ceiling-Party wall-Trusses over  \nTop floor ceiling-Party wall (stepped) -Trusses over Top floor ceiling-Non-load bearing wall-Trusses parallel  \nTop floor ceiling-Non-load bearing wall-Trusses perpendicular  \nRoof top connections  \nD-01 External wall-Verge overhang  \nD-02 External wall-Clipped verge  \nD-03 Roof top-Party wall-Trusses parallel  \nD-04 Roof top-Party wall-Trusses perpendicular  \nD-05 Roof top-Party wall-Ridge  \nD-06 Roof top-Exposed party wall (stepped)  \n[ofptimberframe.com](ofptimberframe.com)  \nI  \nT: 01304 613298  \nI  \nE: [info@ofptimberframe.com](info@ofptimberframe.com)  \n3  OFP Standard Details: Housing (v1 .16)  \nWall interactions and junctions  \nE-01  \nE-02  \nE-03  \nE-03a  \nE-04  \nE-05  \nE-06  \nE-07  \nE-08  \nE-09  \nE-10  \nE-11  \nE-12  \nE-13  \nE-14  \nE-15  \nE-16  \nE-17  \nE-18  \nE-19  \nE-20  \nOpenings  \nF-01  \nF-02  \nF-03  \nF-04  \nF-05  \nF-06  \nF-07  \nExternal wall-External corner  \nExternal wall-Internal corner  \nExternal wall-Party wall connection  \nExternal wall-Party wall connection-Option 2  \nExternal wall-Party wall at internal corner  \nExternal wall-Internal load bearing wall-T-Junction  \nExternal wall-Internal load bearing wall at internal corner External wall-Internal non-load bearing wall-T-Junction  \nExternal wall-Internal non-load bearing wall at external corner External wall-Expansion joint  \nParty wall-X junction  \nParty wall-T junction  \nParty wall-Corner  \nParty wall-Internal load bearing wall-T-junction Party wall-Internal non-load bearing wall-T-junction Internal load bearing wall-Corner  \nInternal load bearing wall-T-junction  \nInternal load bearing wall-Internal non-load bearing wall at corner  \nInternal load bearing wall-Internal non-load bearing wall-T-junction Internal non-load bearing wall-Corner  \nInternal non-load bearing wall-T-junction  \nWindow/door jamb Window/door head Window cill  \nBay window steel corner post  \nSplayed Bay window steel corner post Bay window steel corner post section Juliet Balcony to Timber Frame fixing option  \nMiscellaneous details  \nG-01 Stairwell cover details-parallel and perpendicular  \nG-02 Wall tie locations  \nG-03 Steel purlin and top-hat truss detail  \nG-04 Loose rafter restraint detail  \nG-05 Spandrel panel plasterboard detail  \nG-06 Longitudinal bracing detail  \nG-07 Diagonal bracing detail  \nG-08 Loose rafter inset OSB s","cbCaia8hyEms6omh","https://ap.wps.com/l/cbCaia8hyEms6omh","pdf",2366111,100,"English","# Ground floor base connections\n## Mid floor connections\n## Top floor\n# Roof top connections\n## Wall interactions and junctions\n## Openings\n# Miscellaneous details\n## Follow on trade's details","[{\"question\":\"What scope of housing construction details does the booklet provide?\",\"answer\":\"It provides structured reference details across ground, mid, and top floor connections, wall interactions and junctions, openings, and roof/ceiling connection configurations.\"},{\"question\":\"Which areas are covered under floor connection drawings?\",\"answer\":\"The document lists ground floor base connections, mid floor connections, and top floor connections, including specific wall-slab and wall-joist combinations.\"},{\"question\":\"Does the booklet include items for follow-on trades and services?\",\"answer\":\"Yes. It lists follow-on trade details such as cavity barrier locations, gas application installation, electricity meter box, boiler flue, and instructions for drilling/notching joists and studs.\"}]","OFP Standard Details - Housing - v1.16 | PDF",1792828488,252]