[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-389217-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-389217-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","offshore-drilling-contractors-ordered-offshore-rig-newbuildings-2001-overview-of-deliveries-orders-and-costs","Offshore Drilling Contractors Ordered Offshore Rig Newbuildings - 2001 - Overview of Deliveries, Orders, and Costs","","Offshore Drilling Contractors took delivery of ten offshore drilling rigs in 2001, while nine more were ordered for delivery later, mostly on speculation when commodity prices were high. Deliveries covered jackups, semisubmersibles, and drillships, with many units designed for specific water-depth ranges and regions such as the Caspian Sea. Construction costs varied widely, from about $80 million for a jackup to roughly $490 million for large units, alongside lower-cost deck-level semis. A reference table tracks owner, rig name, design depth, order year, shipyard, contract notes, and delivery dates.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/offshore-drilling-contractors-ordered-offshore-rig-newbuildings-2001-overview-of-deliveries-orders-and-costs/389217/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/offshore-drilling-contractors-ordered-offshore-rig-newbuildings-2001-overview-of-deliveries-orders-and-costs/389217.png","ImageObject",300,407,{"name":42,"@type":43},"Franzy","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-19","2026-09-25",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"How many offshore drilling rigs were delivered and ordered around 2001?","Question",{"text":63,"@type":64},"Ten rigs were delivered during 2001. Nine additional rigs were ordered in the same period, mostly speculatively in the first half of the previous year when commodity prices were high.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which rig types were delivered and how many were ordered for delivery through 2004?",{"text":68,"@type":64},"Deliveries included two jackups, seven semisubmersibles, and one drillship. Another 20 rigs were listed as being in shipyards for delivery through 2004.",{"name":70,"@type":61,"acceptedAnswer":71},"What factors explain the variation in offshore rig construction costs?",{"text":72,"@type":64},"Costs varied substantially by rig type and design specifications, especially water depth capability. Examples range from about $80 million for a smaller jackup to about $250 million for larger deepwater jackups, while some semisubmersibles approached roughly $465–$490 million.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},389217,1791147315,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":55,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":30,"preview_page_count":22,"preview_urls":144},2336478945519,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Contractors ordering offshore rigs on speculation  \nOFFSHORE DRILLING CONTRACTORS took delivery of ten offshore drilling rigs during 2001. During the same time nine additional rigs were ordered, all but one of them ordered speculatively during the first half of last year when commodity prices were high. By rig type, two jackups, seven semisubmersibles and one drillship were delivered last year. Another 20 are in the shipyards for delivery through 2004.  \nFive jackup rigs were ordered last year, all on speculation, including one each by Atwood Oceanics, Maersk Drilling and Rowan Drilling, and two by GlobalSantaFe. Construction of Rowan Drilling’s Tarzan Class rig was approved in 2001 and construction is expected to begin this summer.  \nAll but one of the jackups ordered last year are the deeper water units rated for 350 ft or greater. The GlobalSantaFe  \nunits are rated for 400 ft of water while the Maersk jackup is rated to work in up to 492 ft of water. Rowan’s Gorilla VIII is rated for 550 ft of water. Atwood Oceanics’ rig is designed for 350 ft of water. Rowan’s Scooter Yeargin is designed to work in up to 250 ft of water.  \nFour semisubmersibles were ordered last year, including one each by Maersk Drilling and National Iranian Oil Company (NIOC) and two by GlobalSantaFe. The latter two units were ordered on speculation the same time the company ordered its two new jackups. The Maersk rig, rated to drill in up to 3,300 ft of water, is destined for the Caspian Sea against a three-year contract with Exxon. The NIOC semisubmersible will also work in the Caspian.  \nNo drillships were ordered during 2001.  \nThere is a wide range of construction costs for the rigs. Of the 11 jackups  \npresently under construction, the costs range from a low of $80 million for the Scooter Yeargin being built at the company’s LeTourneau yard in Vicksburg, Miss. , to $250 million for Maersk Drilling’s large units rated for drilling in nearly 500 ft of water under construction in Korea.  \nExcept for two semisubmersibles built to deck level only for around $40 million each, the least expensive units are Pride International’s two semis delivered last year at a cost $180 million each. Two semis have construction costs that approach a half billion dollars each. Ocean Rig’s Leiv Eriksson and Erik Raude units cost the contractor approximately $465 million and $490 million, respectively. Both were ordered on speculation in 1996 and 1997. Ocean Rig also owned the two semis built to deck level. These units were recently purchased by Noble Drilling Corporation. n  \nOffshore rig newbuildings-2001 and future  \nOwner Rig Name Design Water  \nDepth ft  \nOrder Year  \nShipyard Contract /Comments Cost  \n$MM  \nDeliv. Date  \nJack-ups Atwood Chiles Offshore  \nChiles Offshore ENSCO FELS/ENSCO Gazflot Maersk Drilling  \nMaersk Drilling Rowan  \nRowan  \nRowan  \nSanta Fe Intl  \nSanta Fe Intl  \nSemis Pride  \nPride  \nMaersk Drilling  \n􀂆 Moss Arctic NIOC Ocean Rig Ocean Rig  \n􀂆 Ocean Rig  \n􀂆 Ocean Rig R&B Falcon Santa Fe Intl Santa Fe Intl Stena Drilling Trans Sedco Trans Sedco Drillships Trans Sedco  \n􀂆 baredeck  \nAtwood Beacon Chiles Discovery Chiles Galileo ENSCO 101  \nENSCO 102  \nArcticheskaya Maersk tbn  \nMaersk tbn  \nRowan Gorilla VII  \nRowan Gorilla VIII Scooter Yeargain Santa Fe Rig 182  \nSanta Fe Rig 183  \nPride Brazil  \nPride Carlos Walter Maersk tbn  \nMoss Sirius Khazar  \nLeiv Eiriksson Eirik Raude Bingo 9000-3  \nBingo 9000-4  \nDeepwater Horizon Santa Fe Rig 184  \nSanta Fe Rig 185 Stena Don Sedco Express Cajun Express  \nDiscoverer Deep Seas  \nKFELS Mod V B  \nKFELS Mod V B  \nKFELS Mod V B  \nKFELS Mod V  \nKFELS Mod VCKB Coral CJ70-150-MC  \nCJ70-150-MC LeT Super Gorilla Super Gorilla XL Tarzan  \nF&G JU 2000  \nF&G JU 2000  \nAmethyst  \nAmethyst DSS-20-CAS-MCS50  \nGVA 4000 M Bingo 9000  \nBingo 9000  \nBingo 9000  \nBingo 9000  \nR&B/Ishikawajima F&G ExD  \nF&G ExD CS30  \nExpress 2000  \nExpress 2000  \nAframax/Sonat  \n350  \n350  \n350  \n350  \n350  \n98  \n492  \n492  \n408  \n550  \n250 ","cbCaio8x5UaOFug0","https://ap.wps.com/l/cbCaio8x5UaOFug0","pdf",87388,"English","# Offshore rig deliveries and speculative ordering in 2001\n## Rig types, designs, and water-depth ratings\n## Construction costs and notable contracts\n## Offshore rig newbuildings table (2001 and future)","[{\"question\":\"How many offshore drilling rigs were delivered and ordered around 2001?\",\"answer\":\"Ten rigs were delivered during 2001. Nine additional rigs were ordered in the same period, mostly speculatively in the first half of the previous year when commodity prices were high.\"},{\"question\":\"Which rig types were delivered and how many were ordered for delivery through 2004?\",\"answer\":\"Deliveries included two jackups, seven semisubmersibles, and one drillship. Another 20 rigs were listed as being in shipyards for delivery through 2004.\"},{\"question\":\"What factors explain the variation in offshore rig construction costs?\",\"answer\":\"Costs varied substantially by rig type and design specifications, especially water depth capability. Examples range from about $80 million for a smaller jackup to about $250 million for larger deepwater jackups, while some semisubmersibles approached roughly $465–$490 million.\"}]","Offshore Drilling Contractors Ordered Offshore Rig Newbuildings - 2001 - Overview of Deliveries, Orders, and Costs | PDF",1790317258,[145],{"page_no":22,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/38b8e949c5429d763aa791303a2ba32b.webp",983,1290]