[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-199431-105":59,"doc-detail-199431-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","oet-plan-for-evaluation-of-tvws-database-systems-for-operation","OET Plan for Evaluation of TVWS Database Systems for Operation","","OET evaluates TVWS database systems for phased approval by assessing five performance elements: establishing and maintaining required protected and registration-related database capabilities, producing accurate channel availability lists, enabling authorized-device contact while limiting interactions to authorized TVWS devices, implementing security controls for database-device communications and preventing unauthorized data input or alteration, and providing protocols for data exchange across multiple database instances. The plan specifies interim processes, required documentation, testing methods, and verification of timely corrective actions and public inspection readiness.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/oet-plan-for-evaluation-of-tvws-database-systems-for-operation/199431/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/oet-plan-for-evaluation-of-tvws-database-systems-for-operation/199431.png","ImageObject",300,407,{"name":92,"@type":93},"Xiajie","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-09-18","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What five performance elements does OET evaluate for TVWS database systems?","Question",{"text":112,"@type":113},"OET evaluates: (A) database capability to maintain required protected and registration processes, (B) ability to produce correct channel availability lists, (C) contact capability with authorized TVWS devices only, (D) security systems protecting communications and unauthorized data changes, and (E) protocols for exchanging data across required site types and multiple databases.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does OET handle database capability development for FCC data base requirements in the interim?",{"text":117,"@type":113},"OET states that required FCC database capabilities may take additional months, so administrators may use a temporary registration process that mirrors licensed wireless microphone registration during 45-day trials.",{"name":119,"@type":110,"acceptedAnswer":120},"When will a TVWS database system be granted operational authority?",{"text":121,"@type":113},"Operational authority is not granted until OET tests the system with an actual device; an interim demonstration using a virtual device is allowed only if an actual designed device is not available.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},199431,1788505963,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},8814010472675,"https://avatar.qwps.com/avatar/WGlhamll","OET Plan for  \nEvaluation of TVWS Database Systems for Operation  \nOET’s evaluation of a database system examines 5 elements of performance as described below. Satisfactory showings for the individual elements of performance provide the basis for our phased approval of a database system.  \nA. Ability to 1) establish and maintain a database that contains the information required by the rules as required under Section 15.715(a), 2) acquire information from the Commission’s databases and to synchronize with the Commission’s databases at least once a week as required under Section 15.715(b), 3) establish processes for registering facilities entitled to protection but not included in the Commission’s databases, including MVPD receive sites and temporary Broadcast Auxiliary Service links as required under Section 15.715(c) and Section 15.712(c), and 4) establish processes for registering facilities where Part 74 low power auxiliary devices (licensed and unlicensed wireless microphones) are used on a regular basis as required under Section 15.715(d) . For this evaluation, we need access to the database system’s records for protected services and its facilities for registering facilities entitles to protection but not included in the Commission’s databases.  \nWe are continuing our work to develop the process and FCC data base capabilities for registration and approval of venues where unlicensed wireless microphones are used. However, setting up the required FCC data base capabilities is likely to take several additional months to complete. In the interim, we are allowing database administrators to use a temporary registration process that mirrors their registration process for licensed wireless microphones in their 45 day trials.  \nWe have developed a web-based procedure for fee-free update of the receive channel(s) for low power TV stations. This will relieve database administrators of responsibility for registering receive sites of low power TV, TV translator and Class A TV stations. That webapp has not been made “live” yet, but should be soon. Relatedly, we are still working on the waiver requests for receive sites beyond 80 kilometers from broadcast station contours. Neither of these issues will delay our approval of a database because the white spaces databases rely on CDBS and any changes to receive site input channel or additional protected sites will be reflected in CDBS.  \nB. Ability to correctly produce channel availability lists  \nWe will test database systems for their ability to produce correct lists of available channels. These tests include protected facilities extracted from the FCC databases, sites protected in the rules, and sites registered by the database systems. For this testing, we need a means to access the database to specify coordinates and obtain lists of the channels available at those coordinates.  \nC. Ability to perform contacts with authorized TVWS devices, including validating that a device is authorized and limiting contacts to only authorized devices  \nWe intend to examine this function through an actual device that is designed to contact the database for lists of available channels. In cases where a device is not available, the database administrator will be allowed to demonstrate the system’s performance on an interim basis through use of a virtual device. However, the database system will not be granted operational  \nauthority until we test the system with an actual device (the final check of the database can occur concurrent with our examination of a device for certification) .  \nD. Security systems for a) protecting communications and interactions between the database and devices and b) protecting the database unauthorized data input or alteration of stored data.  \nDatabase administrators must provide information to allow us to validate that the database’s systems are compliant with the security procedures in Sections 15.711(f)(4), 15.713(j)(1) and 15.715(f) of the rules. We will conduct a paper ","cbCaieeaYBd0ookP","https://ap.wps.com/l/cbCaieeaYBd0ookP","pdf",11027,"English","# OET performance elements for phased approval\n## Database capability for required records and synchronization\n## Producing correct channel availability lists\n## Authorized device contact and validation\n## Security systems for communications and data protection\n## Protocols and procedures for exchange of data across sites","[{\"question\":\"What five performance elements does OET evaluate for TVWS database systems?\",\"answer\":\"OET evaluates: (A) database capability to maintain required protected and registration processes, (B) ability to produce correct channel availability lists, (C) contact capability with authorized TVWS devices only, (D) security systems protecting communications and unauthorized data changes, and (E) protocols for exchanging data across required site types and multiple databases.\"},{\"question\":\"How does OET handle database capability development for FCC data base requirements in the interim?\",\"answer\":\"OET states that required FCC database capabilities may take additional months, so administrators may use a temporary registration process that mirrors licensed wireless microphone registration during 45-day trials.\"},{\"question\":\"When will a TVWS database system be granted operational authority?\",\"answer\":\"Operational authority is not granted until OET tests the system with an actual device; an interim demonstration using a virtual device is allowed only if an actual designed device is not available.\"}]","OET Plan for Evaluation of TVWS Database Systems for Operation | PDF"]