[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650660-105":59,"doc-detail-650660-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","nrm-2-detailed-measurement-for-building-works-2nd-edition-october-2021","NRM 2 - Detailed measurement for building works - 2nd edition - October 2021","","NRM 2 provides detailed measurement guidance for building works under the UK framework, presenting a structured approach aligned with the RIBA Plan of Work 2020 and related gateway processes. It covers the definition, purpose, types, preparation, and composition of bills of quantities, including information requirements, codification, and cost management and control. The guidance then sets out rules of measurement for building works, using tables and specifying measurement rules across work sections and parts.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/nrm-2-detailed-measurement-for-building-works-2nd-edition-october-2021/650660/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/nrm-2-detailed-measurement-for-building-works-2nd-edition-october-2021/650660.png","ImageObject",300,407,{"name":92,"@type":93},"Putri","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does NRM 2 focus on for building projects?","Question",{"text":112,"@type":113},"NRM 2 focuses on detailed measurement for building works, including how to define and prepare bills of quantities and how to apply measurement rules.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How is NRM 2 aligned with project planning processes?",{"text":117,"@type":113},"It describes measurement in context with the RIBA Plan of Work 2020 and the OGC Gateway Process, and includes an effective date for its use.",{"name":119,"@type":110,"acceptedAnswer":120},"What topics are covered under detailed measurement?",{"text":121,"@type":113},"The document covers the definition and purpose of bills of quantities, benefits and types, preparation and composition, information requirements, codification, cost management/control, and analysis and storage of cost data.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650660,1792836316,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962085571259,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","RICS GUIDANCE NOTE  \nNew  \nrules of  \nmeasurement  \nDetailed measurement for building works  \n2nd edition UK October 2021  \nii  \nNRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS  \nRICS guidance note, UK  \n2nd edition, October 2021  \nEffective from 1 December 2021  \nStages from the RIBA Plan of Work 2020, copyright Royal Institute of British Architects, are reproduced here with the permission of the RIBA.  \nPublished by the Royal Institution of Chartered Surveyors (RICS)  \nParliament Square London  \nSW1P 3AD  \n[www.rics.org](www.rics.org)  \nNo responsibility for loss or damage caused to any person acting or refraining from action as a result of the material included in this publication can be accepted by the authors or RICS.  \nISBN 978 1 78321 425 9  \n© Royal Institution of Chartered Surveyors (RICS) October 2021. Copyright in all or part of this publication rests with RICS. Save where and to the extent expressly permitted within this document, no part of this work may be reproduced or used in any form or by any means including graphic, electronic, or mechanical, including photocopying, recording, taping or web distribution, without the written permission of RICS or in line with the rules of an existing licence.  \nThis document contains public sector information published by the Health and Safety Executive and licensed under the Open Government Licence v3.0 .  \nTypeset using Typefi  \niii  \nAcknowledgements  \nAuthor  \nAlan Northen (Northen Surveying Services)  \nCo-author  \nDavid Benge (Gleeds)  \nWorking group  \nChair: Steven Thompson (RICS)  \nAndy Green (Atkins)  \nDave Monswhite (Turner & Townsend)  \nGuy Beaumont (Turner & Townsend)  \nIan Aldous (Arcadis)  \nKatie Lyson (WSP)  \nSteve Brunning (Rapid 5D)  \nAaron Wright (BCIS)  \nPaul Burrows (BCIS)  \nStandards delivery project managers  \nSarah Crouch and Simon Hall  \nEditors  \nSam Birch, Jo FitzLeverton, Megan Reed and Jess Rogers  \nRICS and the NRM authors would like to acknowledge the efforts of the original steering group, chaired by Stuart Earl: Ed Badke, Alan Cripps, David Benge, John Davidson, Andy Green, Joe Martin, Sean Smylie and Roy Stratton.  \nRICS is grateful for the early work undertaken on this edition of NRM 2 by John Davidson, and his continuing work in dealing with NRM 2 queries from end users up until the end of 2019.  \nNRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS  \niv  \nContents  \nAcknowledgements 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 ii Introduction to N RM 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 1  \nRICS professional standards and guidance 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 2  \nRICS guidance notes ............................................................................................................... 2  \nIntroduction 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 4  \nICMS: Global Consistency in Presenting Construction Life Cycle Costs and Carbon Emissions ......................................................................................................................... 4  \nGlossary 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 6  \n1 General 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 13  \n1.1 Introduction .................................................................................................................. 13  \n1.2 Measurement in context with the RIBA Plan of Work and OGC Gateway Process......................................................................................................................................... 13  \n1.3 Purpose .......................................................................................................................... 15  \n1.5 Effective date","cbCaireoAwHxgGAZ","https://ap.wps.com/l/cbCaireoAwHxgGAZ","pdf",2723516,355,"English","# Acknowledgements\n# Introduction to NRM\n## RICS professional standards and guidance\n## Introduction\n## ICMS: Global Consistency in Presenting Construction Life Cycle Costs and Carbon Emissions\n## Glossary\n# 1 General\n## Introduction\n## Measurement in context with the RIBA Plan of Work and OGC Gateway Process\n## Purpose\n## Effective date\n# 2 Detailed measurement of building works\n## Definition and purpose of a bill of quantities\n## Benefits of a bill of quantities\n## Types of bills of quantities\n## Preparation of bills of quantities\n## Composition of bills of quantities\n## Other considerations\n## Information requirements for measurement\n## Codification of a bill of quantities\n## Cost management/control\n## Analysis, collection and storage of cost data\n# 3 Rules of measurement for building works\n## Using the tables\n## Measurement rules for building works\n## Work section 1: Preliminaries","[{\"question\":\"What does NRM 2 focus on for building projects?\",\"answer\":\"NRM 2 focuses on detailed measurement for building works, including how to define and prepare bills of quantities and how to apply measurement rules.\"},{\"question\":\"How is NRM 2 aligned with project planning processes?\",\"answer\":\"It describes measurement in context with the RIBA Plan of Work 2020 and the OGC Gateway Process, and includes an effective date for its use.\"},{\"question\":\"What topics are covered under detailed measurement?\",\"answer\":\"The document covers the definition and purpose of bills of quantities, benefits and types, preparation and composition, information requirements, codification, cost management/control, and analysis and storage of cost data.\"}]","NRM 2 - Detailed measurement for building works - 2nd edition - October 2021 | PDF",895]