[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-183483-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-183483-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","npdes-permit-nm0030759-resubmittal-of-completion-of-corrective-action-for-twelve-site-monitoring-areas","NPDES Permit NM0030759 - Resubmittal of Completion of Corrective Action for Twelve Site Monitoring Areas","","Resubmittal letter addressing an administrative error in prior submissions for twelve Site Monitoring Areas (SMA) under NPDES Permit No. NM0030759. The original SMA completion packages lacked signed certification statements, while the corrective action content remained unchanged. The document instructs recipients to replace the original certified-mail packages submitted on November 29, 2012 and March 7, 2013 with the attached replacement packages. Table 1 lists each associated SMA number, site number, watershed, priority, and original submittal date, along with recipient contact and distribution details.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/npdes-permit-nm0030759-resubmittal-of-completion-of-corrective-action-for-twelve-site-monitoring-areas/183483/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/npdes-permit-nm0030759-resubmittal-of-completion-of-corrective-action-for-twelve-site-monitoring-areas/183483.png","ImageObject",300,407,{"name":42,"@type":43},"Đào","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-09-02",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of this resubmittal letter?","Question",{"text":63,"@type":64},"It notifies recipients that replacement completion packages are being submitted because the original SMA packages lacked signed certification statements due to an administrative error.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What changed between the original and replacement submissions?",{"text":68,"@type":64},"Only the inclusion of signed certification statements changed; the corrective action content itself did not change.",{"name":70,"@type":61,"acceptedAnswer":71},"Which dates are associated with the original submissions that must be replaced?",{"text":72,"@type":64},"The original certified-mail submissions were sent on November 29, 2012 and March 7, 2013, and must be replaced with the attached packages.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},183483,1790659159,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":30,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":112,"preview_page_count":4},1374402968488,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Los Alamos Field Office,MS A316Environmental Projects OfficeLos Alamos,New Mexico 87544(505)667-4255/FAX(505)606-2132  \nDate:AUG 2.12013  \nRefer To:EP2013-0182  \n08-21-13A10:20 RCVD  \nPaulette Johnsey,Chief  \nCompliance Assurance and Enforcement Division(6EN)U.S.Environmental Protection Agency,Region 61445 Ross Avenue,Suite 1200Dallas,TX 75202-2733  \nSubject:NPDES Permit No.NM0030759-Resubmittal of Completion of Corrective Actionfor Twelve Site Monitoring Areas  \nDear Ms.Johnsey:  \nThe attached completion of corrective action packages for 12 site monitoring areas(SMA)previously submitted are attached with signed certification statements.Because of an inadvertentadministrative error,the original submissions of the SMA packages lacked signed certificationstatements.The content of the original packages did not change.  \nThe submittal packages are listed in Table 1,along with a column showing the original submittaldate.Please replace the original submittal packages,sent by certified mail on November 29,2012,and March 7,2013,with the attached packages.  \nA link to this certified document can be accessed at the following website:http://www.Janl.gov/community-environment/environmental-stewardship/protection/compliance/individual-permit-stormwater/index.php.  \nIf you have any questions,please contact Steve Veenis at (505)667-0013(veenis@lanl.gov)or  \nDavid Rhodes at (505)665-5325(david.rhodes@nnsa.doe.gov).  \nSincerely,  \nSincerely,  \n# 二5火L\n\nDavid S.Rhodes,Supervisory Federal Project DirectorEnvironmental Projects OfficeLos Alamos Field Office  \nDavid McInrpy,Program DirectorEnvironmental Programs-Corrective ActionsLos Alamos National Laboratory  \nTable 1  \n# Replacement Packages for Sites with Certification of Completion of Corrective ActionIssued in November 2012 and March 2013\n\n\n| Associated  \u003Cbr>SMA Number   | Site Number   | Watershed   | Site Priority   | Original  \u003Cbr>Submittal  \u003Cbr>Date   |\n| --- | --- | --- | --- | --- |\n| A-SMA-2.7   | 39-002(c)   | Ancho   | Moderate   | 11/29/2012   |\n| CDB-SMA-1   | C-46-001   | Mortandad   | Moderate   | 11/29/2012   |\n| CDV-SMA-1.4   | 16-030(c)   | Water/Canon de  \u003Cbr>Valle   | Moderate   | 11/29/2012   |\n| LA-SMA-1.1   | 43-001(b2)   | Los Alamos/Pueblo   | Moderate   | 11/29/2012   |\n| LA-SMA-2.3   | 01-001(b)   | Los Alamos/Pueblo   | Moderate   | 11/29/2012   |\n| LA-SMA-5.02   | 01-003(e)   | Los Alamos/Pueblo   | High   | 11/29/2012   |\n| LA-SMA-5.91   | 21-023〔c〕   | Los Alamos/Pueblo   | Moderate   | 11/29/2012   |\n| M-SMA-4   | 48-007(a)  \u003Cbr>48-007(d)  \u003Cbr>48-010   | Mortandad   | Moderate   | 11/29/2012   |\n| R-SMA-0.5   | C-00-020   | Los Alamos/Pueblo   | Moderate   | 11/29/2012   |\n| S-SMA-2   | 03-056(c)   | Sandia   | High   | 11/29/2012   |\n| ACID-SMA-2   | 45-001  \u003Cbr>45-002  \u003Cbr>45-004   | Los Alamos/Pueblo   | Moderate   | 3/7/2013   |\n| LA-SMA-5.33   | 32-004   | Los Alamos/Pueblo   | Moderate   | 3/7/2013   |\n\nDM/DR/SV/JW:sm  \nEnclosure:One hard copy with electronic files-Replacement Packages for the Completion ofCorrective Action for 12 SMAs(LA-UR number listed for each SMA)  \nCy:  (w/enc.)  \nBruce Yurdin,NMED-SWQB,1190 St.Francis Dr.,Santa Fe,NM 87505(hard &e-copy)Erin Trujillo,NMED-SWQB(electronic copy)Jeff Walterscheid,EP-CAP(electronic copy)Public Reading Room (hard copy)RPF(electronic copy)  \nCy:(Letter and CD and/or DVD)  \nLaurie King,EPA Region 6,Dallas,TXSteve Yanicak,NMED-DOE-OB,MS M894epccat @lanl.gov  \nCy:  \n(w/o enc.)  \nDiana McDonald,USEPA Region 6(6EN)(date-stamped letter emailed)Brent Larsen,USEPA Region 6(6WQ)(date-stamped letter emailed)Richard Powell,NMED SWQB(date-stamped letter emailed)Tom Skibitski,NMED-DOE-OB(date-stamped letter emailed)lasomailbox@nnsa.doe.gov  \nAnnette Russell,DOE-NA-00-LA(date-stamped letter emailed)David Rhodes,DOE-NA-00-LA(date-stamped letter emailed)Peter Maggiore,DOE-NA-00-LA(date-stamped letter emailed)Michael Brandt,ADESHQ(date-stamped letter emailed)Tori George,EP-REG (date-stamped letter emailed)Steve Veenis,EP-CA","cbCaigi37SkR7yTJ","https://ap.wps.com/l/cbCaigi37SkR7yTJ","pdf",120690,"English","# Replacement Packages for Sites with Certification of Completion of Corrective Action\n## Table 1 - Replacement Packages for Sites with Certification of Completion of Corrective Action","[{\"question\":\"What is the purpose of this resubmittal letter?\",\"answer\":\"It notifies recipients that replacement completion packages are being submitted because the original SMA packages lacked signed certification statements due to an administrative error.\"},{\"question\":\"What changed between the original and replacement submissions?\",\"answer\":\"Only the inclusion of signed certification statements changed; the corrective action content itself did not change.\"},{\"question\":\"Which dates are associated with the original submissions that must be replaced?\",\"answer\":\"The original certified-mail submissions were sent on November 29, 2012 and March 7, 2013, and must be replaced with the attached packages.\"}]","NPDES Permit NM0030759 - Resubmittal of Completion of Corrective Action for Twelve Site Monitoring Areas | PDF",1788352861]