[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662782-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662782-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","not-binding-operating-and-assembly-instruction-progressive-cavity-pump-safety-installation-commissioning-maintenance","Not Binding Operating and Assembly Instruction Progressive Cavity Pump - Safety, Installation, Commissioning, Maintenance","","Operating and assembly instruction for a progressive cavity pump covering safety and protective measures, designated use, and foreseeable misuse. Provides machine description including mode of action and pumping principle, followed by technical data, transport and intermediate storage, and disposal guidance. Details assembly and installation steps such as mounting tools, space requirements, power supply, and pipeline setup. Includes commissioning and de-commissioning procedures, inspection and lubrication, troubleshooting and rectification, dismantling and reassembly, and spare parts ordering templates.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/not-binding-operating-and-assembly-instruction-progressive-cavity-pump-safety-installation-commissioning-maintenance/662782/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/not-binding-operating-and-assembly-instruction-progressive-cavity-pump-safety-installation-commissioning-maintenance/662782.png","ImageObject",300,407,{"name":42,"@type":43},"notyourbestiee","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What does the instruction cover for the progressive cavity pump?","Question",{"text":62,"@type":63},"It covers safety, machine description, technical data, transport and disposal, assembly and installation, commissioning and de-commissioning, maintenance, troubleshooting, and dismantling/reassembly.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What safety topics are addressed in the safety section?",{"text":67,"@type":63},"The document explains notes on the instructions, safety-related information, designated use and foreseeable misuse, warning note structures, personnel qualification, protective equipment, and safety/protective devices.",{"name":69,"@type":60,"acceptedAnswer":70},"Which steps are included before and during commissioning?",{"text":71,"@type":63},"It includes measures before commissioning such as checking pipelines, verifying protective devices, establishing electrical/hydraulic connections, and checking direction of rotation, followed by initial commissioning and guidance to avoid dry running.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662782,1793222434,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":107,"slug":108},7,40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":106,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},962094243716,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Not Binding Operating and Assembly Instruction Progressive Cavity Pump  \nThis operating and assembly instruction is only for general information.  \nType  \nBN 52-6LS up to 130-6LS  \nIssue 24.02.2020  \nIndex  \n1 Safety . .. ................................................................................................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1  \n1.1 Notes on these instructions  \n1.2 Safety-related Information  \n1.3 Designated use  \n1.4 Foreseeable misuse  \n1.5 Structure of warning notes  \n1.5.1 Warning levels  \n1.5.2 Warning symbols  \n1.6 Qualification of the personnel  \n1.7 Tasks, notes for the owners, operators and technicians  \n1.8 Personal protective equipment  \n1.9 Safety and protective devices  \n2 Description of the machine . .. ................................................................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9  \n2.1 General description  \n2.2 Mode of action and pumping principle of the machine  \n2.3 Constructive design  \n3 Technical Data ........................................................................................................................................................................................................................................................................ 11  \n4 Transport, Intermediate storage, Disposal ................................................................................................................................................................................... 13  \n4.1 Safety  \n4.2 Transport  \n4.2.1 Dimensions, weight and centre of gravity  \n4.2.2 Symbol  \n4.2.3 Lashing points (AP) for lifting devices  \n4.2.4 Unpacking the machine  \n4.3 Temporary storage/corrosion protection  \n4.4 Disposal  \n5 Assembly / Installation . .. ....................................................................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15  \n5.1 Mounting tools / lifting gear  \n5.2 Space requirement  \n5.3 Assembly of the complete mounted machine  \n5.4 Power supply of the machine  \n5.5 Pipelines  \n6 Commissioning / De-Commissioning .................................................................................................................................................................................................... 17  \n6.1 Commissioning report ............................................................................................................ 17  \nIndex  \n6.2 Measures before commissioning. ........................................................................................... 19  \n6.2. 1 Checking pipelines  \n6.2.2 Protective devices on the pump  \n6.2.3 Electrical / hydraulic connections  \n6.2.4 Direction of rotation check  \n6.2.5 Additional devices-optional  \n6.3 Initial commissioning/repeated commissioning  \n6.3. 1 Avoiding dry running of the pump  \n6.3.2 Pressure in the suction and pressure connection  \n6.4 De-commissioning  \n6.4. 1 Switching off the pump  \n6.4.2 Emptying the pump  \n6.4.3 Dismantling the pump  \n6.4.4 Preservation/storage of the pump  \n7 Maintenance . .. ....................................................................................................................................... . . . . . . . . . . . . . . . . . . . . ","cbCaidx8VLGO92Xb","https://ap.wps.com/l/cbCaidx8VLGO92Xb","pdf",4264903,83,"English","# Safety\n## Notes on these instructions\n## Safety-related information\n## Designated use\n## Foreseeable misuse\n## Structure of warning notes\n## Qualification of the personnel\n## Tasks and safety for owners, operators and technicians\n## Personal protective equipment\n## Safety and protective devices\n# Description of the machine\n## General description\n## Mode of action and pumping principle\n## Constructive design\n# Technical Data\n# Transport, Intermediate storage, Disposal\n## Safety\n## Transport\n## Temporary storage/corrosion protection\n## Disposal\n# Assembly / Installation\n## Mounting tools / lifting gear\n## Space requirement\n## Assembly of the complete mounted machine\n## Power supply of the machine\n## Pipelines\n# Commissioning / De-Commissioning\n## Commissioning report\n## Measures before commissioning\n## Initial commissioning/repeated commissioning\n## De-commissioning\n# Maintenance\n## Preventative measures\n## Lubrication\n## Inspection\n# Malfunctions, causes, rectification\n# Dismantling / Reassembly\n## Dismantling\n## Reassembly\n## Mechanical seal\n## Safety\n## Application conditions and material version\n# Spare parts\n## Order template for spare parts\n# Special tools\n# Associated documents","[{\"question\":\"What does the instruction cover for the progressive cavity pump?\",\"answer\":\"It covers safety, machine description, technical data, transport and disposal, assembly and installation, commissioning and de-commissioning, maintenance, troubleshooting, and dismantling/reassembly.\"},{\"question\":\"What safety topics are addressed in the safety section?\",\"answer\":\"The document explains notes on the instructions, safety-related information, designated use and foreseeable misuse, warning note structures, personnel qualification, protective equipment, and safety/protective devices.\"},{\"question\":\"Which steps are included before and during commissioning?\",\"answer\":\"It includes measures before commissioning such as checking pipelines, verifying protective devices, establishing electrical/hydraulic connections, and checking direction of rotation, followed by initial commissioning and guidance to avoid dry running.\"}]","Not Binding Operating and Assembly Instruction Progressive Cavity Pump - Safety, Installation, Commissioning, Maintenance | PDF",209]