[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-656619-105":59,"doc-detail-656619-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","nfc-building-8-hvac-replacement-bid-set-october-25-2024","NFC Building 8 - HVAC Replacement - Bid Set October 25, 2024","","Bid set drawings and HVAC-related specification sheets for NFC Building 8 HVAC replacement at North Florida College in Madison, Florida. Contents include sheet index and reflected ceiling plans for new work and demolition, abbreviations, HVAC legends and schedules, and general notes describing removal of existing ceilings while protecting ceiling-mounted devices. The set also lists coordination requirements with mechanical HVAC VRF cassette sizing and provides typical fixture references and legend symbols for existing-to-remain versus new work.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/nfc-building-8-hvac-replacement-bid-set-october-25-2024/656619/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/nfc-building-8-hvac-replacement-bid-set-october-25-2024/656619.png","ImageObject",300,407,{"name":92,"@type":93},"Tirek","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-02","2026-10-25",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the project scope described in the sheets?","Question",{"text":112,"@type":113},"The drawings cover NFC Building 8 HVAC replacement, including reflected ceiling plan work for new construction and demolition coordination.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the reflected ceiling plan specify about existing ceilings and devices?",{"text":117,"@type":113},"Existing ceilings are to be removed entirely, while ceiling-mounted elements remain in the rooms connected to their systems, and are supported during construction; damaged devices or fixtures are the contractor’s responsibility.",{"name":119,"@type":110,"acceptedAnswer":120},"Which coordination item is explicitly required with mechanical work?",{"text":121,"@type":113},"Coordinate with mechanical for the exact size of the HVAC VRF cassette actually provided.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},656619,1793014320,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":52,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},5909896572756,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| PROJECT No.NFC-04-2024   |\n| --- |\n| NFC BUILDING 8 HVAC REPLACEMENT   |\n| NORTH FLORIDA COLLEGE   |\n| MADISON,FLORIDA   |\n| NBP ENGINEERS,INC.  \u003Cbr>N B P  \u003Cbr>CONSULTANTS  \u003Cbr>316 CORPORATE PARKWAY MACON,GEORGIA  \u003Cbr>E N G IN E E R S  \u003Cbr>Www.nbpengineers.com  \u003Cbr>478-745-1691   |\n|  |\n| PROJECT  CONSULTANTS   |\n| SHEET NO.  \u003Cbr>TITLE  \u003Cbr>REFLECTED CEILING PLAN -NEW WORK  \u003Cbr>A201  \u003Cbr>ABBREVIATIONS,LEGENDS &SCHEDULES -HVAC  \u003Cbr>M001  \u003Cbr>BUILDING 8-FLOOR PLAN -DEMOLITION -HVAC  \u003Cbr>M101   |\n|  |\n| BUILDING 8-FLOOR PLAN -NEW WORK -HVAC  \u003Cbr>M201  \u003Cbr>INDEX OF  \u003Cbr>BUILDING 8-EXISTING HEATING &CHILLED WATER FLOW DIAGRAMS-HVAC  \u003Cbr>M401   |\n| LEGEND AND SCHEDULES-ELECTRICAL  \u003Cbr>E001  \u003Cbr>DRAWINGS  \u003Cbr>BUILDING 8-FLOOR PLAN -DEMOLITION -ELECTRICAL  \u003Cbr>E101  \u003Cbr>BUILDING 8-FLOOR PLAN-NEW WORK -ELECTRICAL  \u003Cbr>E201  \u003Cbr>RISER DIAGRAMS AND DETAILS-ELECTRICAL  \u003Cbr>E401  \u003Cbr>BID SET OCTOBER 25,2024   |\n|  |\n\nEXISTING LICHT FIXTURE,TYP.  \nCLASSRO0M  \n002  \n⑤  \n⑤  \n⑤  \n⑤  \n⑤  \n⑪  \n⑪  \n⑪  \n⑪  \nVRC-I  \nVRC-2  \nSHADED  \n⑤  \n⑪  \n⑤  \n⑤  \n⑪  \n⑤  \n⑤  \nAREA  \nNIC  \n⑤  \n⑪  \n⑤  \n⑪  \n⑤  \n⑤  \n⑤  \nVRC-5  \nVRC-6  \n⑪  \n⑪  \n②  \n②  \n②  \n⑪  \n⑪  \n⑤  \n⑤  \n⑤  \n⑤  \nD08  \nCONTRACTOR SHALL SALVACE AND PROTECT EXISTING WHOLEUNDAMAGED CEILING TILES AND TURN OVER TO THE OWNER.  \n4  \n8  \n\n|  | NBP  \u003Cbr>ENGINEER S  \u003Cbr>NBP Engineers,Inc.  \u003Cbr>CONSULTANTS  \u003Cbr>316 CORPORATE PARKWAY  \u003Cbr>MACON,GEORGIA 31210  \u003Cbr>478-745-1691  \u003Cbr>www.nbpengineers.com   |  |  |\n| --- | --- | --- | --- |\n|  | THIS DRAWING IS THE PROPERTY OF THE  \u003Cbr>ENGINEER AND MAY NOT BE REPRODUCED  \u003Cbr>OR USED IN WHOLE OR IN PART  \u003Cbr>WITHOUT HIS WRITTEN PERMISSION.IT IS  \u003Cbr>TO BE USED FOR THE PROJECT  \u003Cbr>SPECIFICALLY IDENTIFIED HEREIN AND TO  \u003Cbr>BE RETURNED UPON REQUEST.   |  |  |\n|  | SEAL   |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  | No.   | REVISIONS/SUBMISSIONS   | DATE   |\n|  | NORTHFLORIDA COLLEGE  \u003Cbr>PROJECTNo.NFC-04-2024  \u003Cbr>MADISON,FLORIDA  \u003Cbr>NF BUI7旦ING8HVAC REPLACEMENT  \u003Cbr>PROJECT TTLE:   |  |  |\n|  | SHEET_TITLE:  \u003Cbr>REFLECTED  \u003Cbr>CEILING PLAN-  \u003Cbr>NEW WORK   |  |  |\n|  | DESIGNED:  \u003Cbr>SHD   |  |  |\n|  | DRAWN:  \u003Cbr>BCO   |  |  |\n|  | CHECKED:  \u003Cbr>SHD   |  |  |\n|  | DATE:  \u003Cbr>10.25.2024   |  |  |\n|  | PROJECT NUMBER:  \u003Cbr>24045   |  |  |\n|  | SCALE:  \u003Cbr>AS SHOWN   |  |  |\n|  | FILE PATH:  \u003Cbr>P\\24045\\24045a201dgn   |  |  |\n|  | SHEET NUMBER:  \u003Cbr>A201   |  |  |\n\nEXISTING SPEAKER,TYP.  \nEXISTING I.T.DEVICE,TYP.  \nEXISTING SMOKE  \nSLOPE TO WINDOWS,MATCH EXISTING.TYPICAL  \nDETECTOR,TYP.  \nCLASSROOM  \nCLASSROOM  \n004  \n003  \n⑤  \n⑤  \n⑪  \n⑪  \nVRC-4  \n⑤  \n⑪  \n⑪  \n⑤  \n⑤  \n⑪  \nVRC-3  \nIT  \n⑪  \n⑤  \n016  \nDCU-1  \nBC-3  \nDAC-1  \nMECH  \nACC-I  \n018  \nDOAS-  \nYRHR-1  \nYRHR-1  \nBC-1  \nBC-2  \n⑪  \n⑤  \nVRC-7  \n⑪  \nVRC-9  \nVRC-8  \nVRC-I0  \n⑪  \n⑤  \nVRC-I  \nLIGHT FIXTURE,TYP.一  \nGENERAL NOTES          :(THIS SHEET ONLY)  \nA  \nREMOVE THE EXISTING CEILINGS IN THEIR ENTIRETY.EXISTING CEILINGMOUNTED ELEMENTS SHALL REMAIN IN THE ROOMS,AND SHALL REMAINCONNECTED TO THEIR SYSTEMS.SUPPORT THE CEILING ELEMENTS (LIGHTFIXTURES,SPEAKERS,I.T.EQUIPMENT,FIRE ALARM DEVICES)FROM THE0VERHEAD STRUCTURE DURING CONSTRUCTION.THE CONTRACTOR SHALLBE RESPONSIBLE FOR ANY DAMAGED DEVICES OR LIGHT FIXTURES.  \n⑧THE LOCATION OF CEILING MOUNTED ELEMENTS VARY SLIGHTLY AMONG  \nTHE DIFFERENT CLASSROOMS.THE CONTRACTOR SHALL FIELD VERIFY ALI  \nCEILING ELEMENTS BEFORE RELEASING CEILING MATERIALS,AND BEFORE  \nBEGINNING WORK.  \nCCOORDINATE WITH MECHANICAL FOR EXACT SIZE OF THE HVAC VRF  \nCASSETTE ACTUALLY PROVIDED.  \n\n| LINE LEGEND   |  |\n| --- | --- |\n|  | EXISTING T0 REMAIN   |\n|  | NEW WORK   |\n\nBID SET  \n\n| BP  \u003Cbr>E N GINE ER S  \u003Cbr>NBP Engineers,Inc.  \u003Cbr>CONSULTANTS  \u003Cbr>316 CORPORATE PARKWAY  \u003Cbr>MACON,GEORGIA 31210  \u003Cbr>478-745-1691  \u003Cbr>www.nbpengineers.com   |  |  |\n| --- | --- | --- |\n| THIS DRAWING IS THE PROPERTY OF TH  \u003Cbr>ENGINEER AND MAY NOT BE REPRODUCE  \u003Cbr>OR USED IN WHOLE OR IN PART  \u003Cbr>WITHOUT HIS WRITTEN PERMISSION.T IS  \u003Cbr>TO BE USED FOR THE PROJECT  \u003Cbr>SPECIFI","cbCainNrbBjnrlLO","https://ap.wps.com/l/cbCainNrbBjnrlLO","pdf",3303561,"English","# Sheet Index and Titles\n## Reflected Ceiling Plan - New Work\n## Abbreviations, Legends & Schedules - HVAC\n## General Notes (This Sheet Only)\n## HVAC Legend Symbols","[{\"question\":\"What is the project scope described in the sheets?\",\"answer\":\"The drawings cover NFC Building 8 HVAC replacement, including reflected ceiling plan work for new construction and demolition coordination.\"},{\"question\":\"What does the reflected ceiling plan specify about existing ceilings and devices?\",\"answer\":\"Existing ceilings are to be removed entirely, while ceiling-mounted elements remain in the rooms connected to their systems, and are supported during construction; damaged devices or fixtures are the contractor’s responsibility.\"},{\"question\":\"Which coordination item is explicitly required with mechanical work?\",\"answer\":\"Coordinate with mechanical for the exact size of the HVAC VRF cassette actually provided.\"}]","NFC Building 8 - HVAC Replacement - Bid Set October 25, 2024 | PDF",1792969660,25]