[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649819-105":59,"doc-detail-649819-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","nbims-us-v3-section-555-mep-spatial-coordination-requirements-for-construction-installation-models-and-deliverables","NBIMS-US V3 - Section 5.5.5 - MEP Spatial Coordination Requirements for Construction Installation Models and Deliverables","","National BIM Standard-United States Version 3 outlines requirements for Mechanical, Electrical, Plumbing, and Fire Protection (MEP) spatial coordination at the construction installation level using 3D and BIM technologies. It guides construction firms and individuals in preparing installation-level coordination models and deliverables, defining scope boundaries that exclude design coordination between designers and installers. The document supports traditional design-bid-build delivery with applicability to design-assist and design-build, emphasizing team structure, roles, accountability, technical and IT considerations, and coordination workflows.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/nbims-us-v3-section-555-mep-spatial-coordination-requirements-for-construction-installation-models-and-deliverables/649819/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/nbims-us-v3-section-555-mep-spatial-coordination-requirements-for-construction-installation-models-and-deliverables/649819.png","ImageObject",300,407,{"name":92,"@type":93},"MrHarris58","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24",true,{"@type":101,"interactionType":102,"userInteractionCount":8},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What is the document’s scope for MEP spatial coordination?","Question",{"text":111,"@type":112},"It provides guidance for installation-level spatial coordination using 3D and BIM for mechanical, electrical, plumbing, and fire protection systems. It does not cover design coordination or interfaces between designers and installing contractors.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"Who is the intended audience for these MEP coordination requirements?",{"text":116,"@type":112},"Construction companies and individuals involved in 3D MEP spatial coordination, including installation contractors and tradespeople.",{"name":118,"@type":109,"acceptedAnswer":119},"How does the document define team roles and responsibilities?",{"text":120,"@type":112},"It focuses on team structure, defining roles and responsibilities, accountability, and how technical and IT considerations support coordination. It also provides decision guidance when determining “who should do what” based on risk and expected gain.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649819,1792876663,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":52,"language":138,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":139,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":142,"read_time":143},687212988360,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","National BIM Standard-United States® Version 3  \n5 Practice Documents  \n5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination  \nRequirements for Construction Installation Models and Deliverables – Revised May 2012  \nCONTENTS  \n5.5.1 Scope..................................................................................................................................................2  \n5.5.2 Normative references .........................................................................................................................3  \n5.5.3 Terms, definitions, symbols, units and abbreviated terms .................................................................3  \n5.5.4 Mechanical, Electrical, Plumbing, and Fire Protection Systems Spatial Coordination Requirements for Construction Installation Models and Deliverables, November 2009 ...........................................3  \n5.5.4.1 Minimum qualifications – MEP spatial coordination team .................................................................4  \n5.5.4.2 Project coordination manager – general contractor’s representative................................................4  \n5.5.4.3 MEP spatial coordinator – MEP lead subcontractor..........................................................................4  \n5.5.4.4 Project coordination schedule ...........................................................................................................5  \n5.5.4.5 Coordination set-up and participation................................................................................................5  \n5.5.4.6 Human resource requirement............................................................................................................5  \n5.5.4.7 File transfer and collaboration workspace .........................................................................................5  \n5.5.4.8 File format, compatibility, and completeness.....................................................................................5  \n5.5.4.9 Coordination meetings.......................................................................................................................6  \n[5.5.4.10](5.5.4.10) MEP spatial coordination.................................................................................................................6  \n[5.5.4.11](5.5.4.11) Submittal and coordination sign-off drawings..................................................................................6  \n[5.5.4.12](5.5.4.12) Record and as-built deliverables .....................................................................................................7  \n[5.5.4.13](5.5.4.13) Hardware and software requirements .............................................................................................7  \n5.5.5 Bibliography ........................................................................................................................................7  \nAnnex A .........................................................................................................................................................8  \nNational BIM Standard – United States® Version 3  \n©2015 National Institute of Building Sciences buildingSMART alliance® . All rights reserved.  \n5.5.1 Scope  \nThe recent widespread adoption of Building Information Modeling (BIM) and 3D modeling in the construction industry has necessitated the development of a well-defined, organized, consistent, and repeatable framework for installation level spatial coordination of mechanical, electrical, plumbing, and fire protection systems (MEP) .  \nThis document, Mechanical, Electrical, Plumbing, and Fire Protection Systems Spatial Coordination Requirements for Construction Installation Models and Deliverables, will provide guidance to construction companies and individuals involved in 3D MEP spatial coordination of systems and components for fabrication and installation. It does not delve into design ","cbCaif2T47ScW8ZV","https://ap.wps.com/l/cbCaif2T47ScW8ZV","pdf",146897,"English","# 5.5.1 Scope\n# 5.5.2 Normative references\n# 5.5.3 Terms, definitions, symbols, units and abbreviated terms\n# 5.5.4 Mechanical, Electrical, Plumbing, and Fire Protection Systems Spatial Coordination Requirements for Construction Installation Models and Deliverables\n## 5.5.4.1 Minimum qualifications – MEP spatial coordination team\n## 5.5.4.2 Project coordination manager – general contractor’s representative\n## 5.5.4.3 MEP spatial coordinator – MEP lead subcontractor\n## 5.5.4.4 Project coordination schedule\n## 5.5.4.5 Coordination set-up and participation\n## 5.5.4.6 Human resource requirement\n## 5.5.4.7 File transfer and collaboration workspace\n## 5.5.4.8 File format, compatibility, and completeness\n## 5.5.4.9 Coordination meetings\n## 5.5.4.10 MEP spatial coordination\n## 5.5.4.11 Submittal and coordination sign-off drawings\n## 5.5.4.12 Record and as-built deliverables\n## 5.5.4.13 Hardware and software requirements\n# 5.5.5 Bibliography\n# Annex A","[{\"question\":\"What is the document’s scope for MEP spatial coordination?\",\"answer\":\"It provides guidance for installation-level spatial coordination using 3D and BIM for mechanical, electrical, plumbing, and fire protection systems. It does not cover design coordination or interfaces between designers and installing contractors.\"},{\"question\":\"Who is the intended audience for these MEP coordination requirements?\",\"answer\":\"Construction companies and individuals involved in 3D MEP spatial coordination, including installation contractors and tradespeople.\"},{\"question\":\"How does the document define team roles and responsibilities?\",\"answer\":\"It focuses on team structure, defining roles and responsibilities, accountability, and how technical and IT considerations support coordination. It also provides decision guidance when determining “who should do what” based on risk and expected gain.\"}]","NBIMS-US V3 - Section 5.5.5 - MEP Spatial Coordination Requirements for Construction Installation Models and Deliverables | PDF",1792808553,25]