[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-180118-105":59,"doc-detail-180118-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","national-cookstove-poa-baseline-and-implementation-plan","National Cookstove PoA - Baseline and Implementation Plan","","Baseline information and project implementation parameters are provided for a cookstove PoA in Gujarat, defining baseline woody biomass use, default baseline consumption, stove efficiency, and operational assumptions. The plan includes start year 2014, adoption rate, operational life of 5 years, fallout rate, installation schedules by year, and cost structure for implementers, end users, subsidies, management, employees, and maintenance. Carbon transaction costs and CER economics are summarized, along with annual and lifetime emission reduction estimates and financial feasibility using NPV and breakeven CER price.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/national-cookstove-poa-baseline-and-implementation-plan/180118/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/national-cookstove-poa-baseline-and-implementation-plan/180118.png","ImageObject",300,407,{"name":92,"@type":93},"Lute","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-18","2026-09-02",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",12,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What baseline fuel and baseline stove efficiency are used in the PoA?","Question",{"text":113,"@type":114},"The baseline fuel is woody biomass. Baseline stove efficiency is set to 10% (default).","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What are the key project implementation timeline and adoption assumptions?",{"text":118,"@type":114},"The implementation start year is 2014, with operational life of 5 years and a 100% adoption rate. The fallout rate is 2%, and the stove efficiency test value is 25.00%.",{"name":120,"@type":111,"acceptedAnswer":121},"How are emission reductions and financial feasibility evaluated?",{"text":122,"@type":114},"Annual emission reductions total 28,604 tCO2/year with a lifetime ER per stove of 5.39 tCO2. Breakeven is assessed using NPV, reported as -51.1 million INR without carbon revenue and -6.8 million INR with carbon revenue, with a breakeven CER price of 4.52 Euro/tCO2.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},180118,1788339480,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":130,"read_time":145,"preview_page_count":4},137454149569,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| Input |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| \u003Cbr>Baseline Information |  |  |  |  |\n| ??\u003Cbr>| Project location  Gujarat  |  |  |  |\n|  | What is the baseline fuel?  Woody biomass  |  |  |  |\n| ? | Baseline fuel consumption Default 2.35 |  | 1.63 | ton/stove/yr |\n| ?  | Baseline Stove Efficiency Default 10% |  | 10% | % |\n| \u003Cbr>Project Implementation Plan |  |  |  |  |\n|  | Implementation Start Year  2014  |  |  |  |\n| ? | Project Stove Efficiency  Test Value  25.00%  |  |  |  |\n| ??\u003Cbr>| Operational Life  5  years |  |  |  |\n|  | Adoption rate  100%  |  |  |  |\n| ? | Fallout Rate  2%  |  |  |  |\n| ?  | Installation schedule Year Number of Stove SSC Threshold? |  |  |  |\n|  | 2014 5000 No |  |  |  |\n|  | 2015 10000 No |  |  |  |\n|  | 2016 12000 No |  |  |  |\n|  | 2017 0 No |  |  |  |\n|  | 2018 0 No |  |  |  |\n|  | 2019 6000 No |  |  |  |\n|  | 2020 12000 No |  |  |  |\n|  | 2021 12000 No |  |  |  |\n|  | 2022 0 No |  |  |  |\n|  | 2023 0 No |  |  |  |\n|  |  |  |  |  |\n|  | fNRB Pre-Defined 78% |  | 95% |  |\n|  |  |  |  |  |\n| \u003Cbr>Project Cookstove Cost |  |  |  |  |\n| ?  | Cost of Stove for implementer  1,600   INR/Stove  |  |  |  |\n| ? | Cost of Stove for End User  100   INR/Stove  |  |  |  |\n| ? | Subsidy  400   INR/Stove  |  |  |  |\n| \u003Cbr>Project Implementation cost |  |  |  |  |\n| ? | Project Management | \u003Cbr>Pre-Defined 435000 | 500000 | INR/year |\n| ?  | Employee | Pre-Defined 456000 | 50000 | INR/year |\n| ? | Maintenance Cost | Pre-Defined 2.00% | 10.00% | INR/year |\n|  | Inflation Rate | User Input 8% |  |  |\n|  | Discount Rate | User Input 12% |  |  |\n\n| \u003Cbr>Carbon Transaction Costs |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| ? | Expected CER price  4.75  Euro/tCO2 |  |  |  |\n| ?  | CER share for CME  5%  |  |  |  |\n| ? | CPA Inclusion Cost User-Defined | 474485 | 600000 INR |  |\n| ??\u003Cbr>| CPA Monitoring Cost User-Defined | 150000 | 600000 |  |\n|  | CPA Verification Cost User-Defined | 731954 | 600000 |  |\n| ? | Other Related Cost Pre-Defined 100000 |  | 200000 |  |\n|  | Exchange rate (Euro-INR) 83 INR/EUR |  |  |  |\n|  | Exchange rate (USD-INR) 61 INR/USD |  |  |  |\n\n| Output |  |\n| --- | --- |\n|  | Annual Emission reductions (ERs)  28604 tCO2/year |\n|  | Total Emission reductions 286040 tCO2/year |\n|  | Annual Emission reduction per stove 1.1 tCO2/stove/yr |\n|  | ER per stove over lifetime of stove 5.39 tCO2/stove |\n|  |  Annual Emission reductions Year Emission Redutions  |\n|  | 2014 6391 |\n|  | 2015 19044 |\n|  | 2016 34001 |\n|  | 2017 33320 |\n|  | 2018 32650 |\n|  | 2019 33890 |\n|  | 2020 36998 |\n|  | 2021 37733 |\n|  | 2022 36977 |\n|  | 2023 36235 |\n| Financial feasibility |  |\n| \u003Cbr>Breakeven Calculation | NPV (Withut Carbon revenue) -51.1 Million INR |\n|  | NPV (With Carbon revenue) -6.8 Million INR |\n|  | Breakeven CER price 4.52 Euro / tCO2 |","cbCaiszKl8z206Nt","https://ap.wps.com/l/cbCaiszKl8z206Nt","pdf",772029,13,"English","# Baseline Information\n## Baseline fuel, consumption, and efficiency\n# Project Implementation Plan\n## Implementation start, operational life, adoption and fallout\n## Installation schedule by year\n## Stove efficiency test value\n# Project Cookstove Cost\n## Implementer and end-user costs; subsidy\n# Project Implementation Cost\n## Management, employee, maintenance, inflation and discount rates\n# Carbon Transaction Costs\n## Expected CER price and cost components\n# Output\n## Annual and total emission reductions\n## Financial feasibility and breakeven calculation","[{\"question\":\"What baseline fuel and baseline stove efficiency are used in the PoA?\",\"answer\":\"The baseline fuel is woody biomass. Baseline stove efficiency is set to 10% (default).\"},{\"question\":\"What are the key project implementation timeline and adoption assumptions?\",\"answer\":\"The implementation start year is 2014, with operational life of 5 years and a 100% adoption rate. The fallout rate is 2%, and the stove efficiency test value is 25.00%.\"},{\"question\":\"How are emission reductions and financial feasibility evaluated?\",\"answer\":\"Annual emission reductions total 28,604 tCO2/year with a lifetime ER per stove of 5.39 tCO2. Breakeven is assessed using NPV, reported as -51.1 million INR without carbon revenue and -6.8 million INR with carbon revenue, with a breakeven CER price of 4.52 Euro/tCO2.\"}]","National Cookstove PoA - Baseline and Implementation Plan | PDF",33]