[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664975-105":59,"doc-detail-664975-en":122},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":115,"head_meta":117,"extra_data":119,"updated_unix":121},105,"en","montgomery-county-building-regulations-deck-covered-porch-or-screened-porch-permit-success-checklist","Montgomery County Building Regulations - Deck, Covered Porch or Screened Porch - Permit Success Checklist","","Montgomery County building regulations outline residential drawing standards for decks, covered porches, and screened porches, including a permit success checklist. The checklist specifies how to submit zoning certification when required and to provide two sets of construction documents. It requires readable, scaled drawings, with every sheet including the owner’s name and project address, the drafter’s name and contact information, and the date. It also details revision markings and provides drawing checklist items covering site plans, foundation plans, floor and framing plans, exterior elevations, and required inspections.",{"@graph":69,"@context":114},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/montgomery-county-building-regulations-deck-covered-porch-or-screened-porch-permit-success-checklist/664975/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/montgomery-county-building-regulations-deck-covered-porch-or-screened-porch-permit-success-checklist/664975.png","ImageObject",300,407,{"name":92,"@type":93},"Elsa","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108],{"name":109,"@type":110,"acceptedAnswer":111},"What inspections are required during construction?","Question",{"text":112,"@type":113},"Inspections include footing inspection before concrete is poured, floor framing inspection for crawlspaces and decks under 48 inches above ground, rough electric when applicable, framing inspection before wall or ceiling finishes, final electrical inspection when applicable, and final inspection after completion.","Answer","https://schema.org",{"og:url":83,"og:type":116,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":118,"canonical":83},"index,follow",{"doc_id":120,"site_id":62},664975,1793283834,{"code":4,"msg":5,"data":123},{"doc_id":120,"user_id":124,"nickname":92,"user_avatar":125,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":126,"file_id":127,"file_url":128,"file_type":129,"file_size":130,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":131,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":132,"faqs":133,"seo_title":134,"seo_description":67,"update_tm":121,"read_time":81},137455077381,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Montgomery County Building Regulations Residential Drawing Standards:  \nDeck, Covered Porch or Screened Porch  \nPermit Success Checklist  \nMontgomery County Building Regulations  \n451 West Third St, 10th Floor  \nDayton, OH 45422 937-225-4622-Phone; 937-225-6327-Fax  \n[www.mcohio.org/build](www.mcohio.org/build)  \nSubmit a copy of the Zoning Certificate if required  \nSubmit two sets of construction documents  \nAll drawings must be drawn to a recognizable scale, such as 1/4”= 1’-0” for the floor plans All sheets must include the owner’s name and project address  \nAll sheets must include the name and contact information of the person who prepared the drawings All sheets must be dated  \nDrawing Revisions:  \nAll revisions must be circled or clouded, in order to see the changes clearly  \nAll revisions must be dated  \nInformation which did not change as a result of the revision need not be resubmitted  \nDeck, Covered Porch or Screened Porch Drawing Checklist: These lists indicate common elements that must be submitted for this project type. Individual projects vary & may require additional information. If unsure of the project requirements, contact Building Regulations.  \n1. Site Plan:  \n􀂅 Property Lines  \n􀂅 All site features (drive, well, septic field, etc.)  \n􀂅 All structures (existing and proposed addition)  \n􀂅 Dimensions between structures and property lines  \n􀂅 All easements and setbacks  \n􀂅 Floodplain & floodway boundaries on the property per FEMA FIRM, if applicable  \n􀂅 Topographic information if slope exceeds  \n1:3 within 40’ of building footprint  \n2. Foundation Plan:  \n􀂅 Location, depth and dimensions of footings  \n􀂅 Concrete cast-in-place footings must be sized for 2,000 psf soil bearing capacity  \n3. Floor/Framing Plan of each level:  \n􀂅 Floor and Roof framing plan at each level with joist size and spacing, Floor joists must be sized for 40 psf live loading Note: If hot tub or spa is to be placed on deck, 100 psf must be applied to that area.  \n􀂅 Connection and flashing detail at house & deck  \n􀂅 Joist hangers  \n􀂅 Header and beam sizes and bearing locations  \n􀂅 Stair details (riser and tread dimensions, balusters, clearances, handrails, etc. )  \n􀂅 Submit roof framing or if premanufactured trusses, submit certified truss engineering prior to framing inspection  \n􀂅 Framing plans must be fully dimensioned between posts, beam lines, and include overall dimensions.  \nNote: See Code Enforcement Policy for details regarding residential roof truss submittals  \n4. Exterior Elevations:  \n􀂅 All exterior views, including railings and balusters, as required. If roof included, elevation of building being tied into must also be shown  \n6. Inspections Reguired:  \n􀂅 Footing inspection when completely prepared, but prior to pouring concrete.  \n􀂅 Floor framing inspection prior to floor covering for crawlspaces and decks less than 48” above the ground.  \n􀂅 Rough electric inspection if applicable.  \n􀂅 Framing inspection before wall or ceiling finishes are applied  \n􀂅 Final electrical inspection if applicable  \n􀂅 Final Inspection when finished","cbCaicjbkTH3Y0br","https://ap.wps.com/l/cbCaicjbkTH3Y0br","pdf",178841,"English","# Permit Success Checklist\n## Submission and Drawing Requirements\n## Drawing Revisions\n## Deck, Covered Porch or Screened Porch Drawing Checklist\n## Inspections Required","[{\"question\":\"What inspections are required during construction?\",\"answer\":\"Inspections include footing inspection before concrete is poured, floor framing inspection for crawlspaces and decks under 48 inches above ground, rough electric when applicable, framing inspection before wall or ceiling finishes, final electrical inspection when applicable, and final inspection after completion.\"}]","Montgomery County Building Regulations - Deck, Covered Porch or Screened Porch - Permit Success Checklist | PDF"]