[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650600-105":59,"doc-detail-650600-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","module-2a-bill-of-materials-and-bill-of-process","Module 2A - Bill of Materials and Bill of Process","","Detailed Design Package Module 2A introduces the motivation and learning objectives behind clear product definition and manufacturing planning. It explains why BOM (bill of materials), BOP (bill of process), and engineering drawings must be understood together to avoid wasted money and improper construction. The module covers product hierarchy, process planning, interpretation of engineering drawings at component and assembly levels, and includes case studies plus the relationship and basic terminology among BOM, BOP, and drawings.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/module-2a-bill-of-materials-and-bill-of-process/650600/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/module-2a-bill-of-materials-and-bill-of-process/650600.png","ImageObject",300,407,{"name":92,"@type":93},"FajarTechTalk","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-27","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Why is Module 2A important for product design and manufacturing?","Question",{"text":112,"@type":113},"It emphasizes that even simple products are complex, and unclear BOM, BOP, and engineering drawings can cause wasted money or improperly constructed products.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What learning objectives does Module 2A focus on?",{"text":117,"@type":113},"It covers identifying product hierarchy and assembly plans, developing process plans for components, and assessing engineering drawings for components.",{"name":119,"@type":110,"acceptedAnswer":120},"How do BOM, BOP, and engineering drawings relate to each other?",{"text":121,"@type":113},"Engineering and assembly drawings provide visual and assembly specification details, BOP defines process sequence and parameters, and BOM lists component quantities and supports product hierarchy.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650600,1792944281,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962094249465,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Detailed Design Package  \nModule 2A Bill of Materials and Bill of Process  \nMotivation  \nWhy is this module important?  \n􀂆 Even the simplest products are typically complex in structure  \n􀂆 If bill of materials (BOM), bill of process (BOP), and engineering drawings are not crystal clear to the innovator and the manufacturer, it can result wasted money and/or products that are improperly constructed  \n􀂆 It’s crucial to know the answers to:  \n—What and how many components form the product?  \n—What are the steps/sequence for fabricating the product?  \n—How can the product continue to be produced effectively as its complexity increases?  \n2  \n􀂆 Learning objectives  \n􀂆 Product hierarchy, bill of materials (BOM)  \n􀂆 Process planning, routing sheet, bill of process (BOP)  \n􀂆 Engineering drawing:  \n—Component level  \n—Assembly level  \n—Interpreting engineering drawings  \n􀂆 Case studies  \n3  \n􀂆 LO1: Identify product hierarchy and assembly plan  \n􀂆 LO2: Develop appropriate process plan for components  \n􀂆 LO3: Assess engineering drawings for components  \n4  \n􀂆 The relationship between BOM, BOP, and engineering drawings  \n􀂆 Basic terminology of BOM, BOP, and engineering drawings  \n􀂆 Some existing online tools to assist in creating a BOM and a BOP  \n􀂆 How to manage BOM generation for complex products  \n5  \n6  \nBOP, BOM, And Drawings  \nHow they all relate  \nThese 3 blocks must be considered simultaneously!  \nEngineering and Assembly Drawing  \nBill of Materials  \n(BOM)  \nBill of Process  \n(BOP)  \n7  \nBOP, BOM, And Drawings  \nHow they all relate  \nEngineering and assembly drawing provides:  \n􀂆 Visual representation of product and components  \n􀂆 Fit, tolerances, and assembly specifications  \nEngineering and Assembly Drawing  \nBill of Materials  \n(BOM)  \nBill of Process  \n(BOP)  \n8  \nBOP, BOM, And Drawings  \nHow they all relate  \nBill of process (BOP) addresses:  \n􀂆 Processes that produce the product and their sequence  \n􀂆 Specifications and parameters of each process step  \nEngineering and Assembly Drawing  \nBill of Materials  \n(BOM)  \nBill of Process  \n(BOP)  \nBill of Materials  \n(BOM)  \n9  \nBOP, BOM, And Drawings  \nHow they all relate  \nBill of materials (BOM) addresses:  \n􀂆 Components forming the product  \n􀂆 Production time per component  \nEngineering and Assembly Drawing  \nBill of Process  \n(BOP)  \nBill Of Materials  \nBasics  \n􀂆 Bill of materials (BOM): Lists quantities of components, ingredients, and materials required to make a product  \n􀂆 Integrates product hierarchy through parent/child delineation Levels of a product:  \n􀂆 Parent: End item (or final product)  \n􀂆 Children: Raw materials, components, and sub-assemblies Demand may depend on product levels:  \n􀂆 Parent: Independent demand (external to the system)  \n􀂆 Children: Dependent demand (internal to the system)—Demand for an item depends on the demand for items ”higher up” on the the BOM  \n10","cbCainZ7z2eRlpiq","https://ap.wps.com/l/cbCainZ7z2eRlpiq","pdf",1988592,54,"English","# Motivation\n## Learning objectives\n# BOP, BOM, And Drawings: How they all relate\n## Engineering and Assembly Drawing\n## Bill of Process (BOP)\n## Bill of Materials (BOM)\n# Bill of Materials Basics","[{\"question\":\"Why is Module 2A important for product design and manufacturing?\",\"answer\":\"It emphasizes that even simple products are complex, and unclear BOM, BOP, and engineering drawings can cause wasted money or improperly constructed products.\"},{\"question\":\"What learning objectives does Module 2A focus on?\",\"answer\":\"It covers identifying product hierarchy and assembly plans, developing process plans for components, and assessing engineering drawings for components.\"},{\"question\":\"How do BOM, BOP, and engineering drawings relate to each other?\",\"answer\":\"Engineering and assembly drawings provide visual and assembly specification details, BOP defines process sequence and parameters, and BOM lists component quantities and supports product hierarchy.\"}]","Module 2A - Bill of Materials and Bill of Process | PDF",1792833954,136]