[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-436773-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-436773-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","missouri-state-operating-permit-permit-no-mo-0130401-city-of-independence-independence-municipal-separate-storm-sewer-system-ms4","Missouri State Operating Permit - Permit No. MO-0130401 - City of Independence Independence Municipal Separate Storm Sewer System MS4","","Missouri State Operating Permit MO-0130401 authorizes the City of Independence to discharge stormwater from the Independence Municipal Separate Storm Sewer System (MS4) in compliance with Missouri Clean Water Law and the Federal Water Pollution Control Act. The permit sets an effective date of September 1, 2023 and an expiration date of August 31, 2028, and limits authorization to regulated stormwater discharges. The document provides facility and outfall information, including receiving streams and UTM coordinate legal descriptions, subject to effluent limitations, monitoring requirements, and appeal provisions.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/missouri-state-operating-permit-permit-no-mo-0130401-city-of-independence-independence-municipal-separate-storm-sewer-system-ms4/436773/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/missouri-state-operating-permit-permit-no-mo-0130401-city-of-independence-independence-municipal-separate-storm-sewer-system-ms4/436773.png","ImageObject",300,407,{"name":42,"@type":43},"Noah","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-09-29",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",9,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What permit is issued and who is authorized to discharge?","Question",{"text":63,"@type":64},"Permit No. MO-0130401 authorizes the City of Independence to discharge stormwater from its municipal separate storm sewer system (MS4).","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What are the permit effective and expiration dates?",{"text":68,"@type":64},"The effective date is September 1, 2023, and the expiration date is August 31, 2028.",{"name":70,"@type":61,"acceptedAnswer":71},"Does the permit allow discharges other than stormwater?",{"text":72,"@type":64},"The permit authorizes only stormwater discharges under the Missouri Clean Water Law and the NPDES program; it does not apply to other regulated areas.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},436773,1790789512,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,110,115,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":108,"slug":109},7,40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":112,"show_sort_weight":113,"slug":114},8,"Research & Report",30,"research-report",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":107,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":94,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":144,"preview_page_count":4},8796095462418,"https://ap-avatar.wpscdn.com/avatar/80000253c1241d02b47?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778826106357471780","STATE OF MISSOURI  \nDEPARTMENT OF NATURAL RESOURCES  \nMISSOURI CLEAN WATER COMMISSION  \nMISSOURI STATE OPERATING PERMIT  \nIn compliance with the Missouri Clean Water Law, ([Chapter 644 R.S. Mo. as](Chapter 644 R.S. Mo. as) amended, hereinafter, the Law), and the Federal Water Pollution Control Act (Public Law 92-500, 92nd Congress) as amended,  \nPermit No. MO-0130401  \nOwner: City of Independence  \nAddress: 111 East Maple, Independence, MO 64051-0519  \nContinuing Authority: City of Independence  \nAddress: 111 East Maple, Independence, MO 64051-0519  \nFacility Name: Independence Municipal Separate Storm Sewer System MS4  \nFacility Address: 17221 E. 23rd Street, Independence, MO 64057  \nLegal Description: See Pages 2 – 3  \nUTM Coordinates: See Pages 2 – 3  \nReceiving Stream: See Pages 2 – 3  \nFirst Classified Stream and ID: See Pages 2 – 3  \nUSGS Basin & Sub-watershed No.: See Pages 2 – 3  \nis authorized to discharge from the facility described herein, in accordance with the effluent limitations and monitoring requirements as set forth herein:  \nFACILITY DESCRIPTION  \nThe City of Independence (permittee) is the fifth largest city in the State of Missouri with a population of 123,011 according to the 2020 U. S. Census with an approximate area of 7, 8.3 mi2 and population density of 1,566 population/mi2. The permittee owns and operates their Phase I Medium (based on the 1990.U.S. Census) Municipal Separate Storm Sewer System (MS4) . The MS4 is comprised of man-made, engineered components that are designed or developed to convey or transport stormwater within the permittee's jurisdiction.  \nThis permit authorizes only stormwater discharges under the Missouri Clean Water Law and the National Pollutant Discharge Elimination System; it does not apply to other regulated areas. This permit may be appealed in accordance with Section 621.250 RSMo, Section 640.013 RSMo and Section 644.051.6 of the Law.  \nSeptember 1, 2023  \nEffective Date  \nAugust 31, 2028   \nExpiration Date  \nFACILITY DESCRIPTION:  \nThe following is a listing of representative major stormwater outfalls with the stormwater outfall’s majority land use designation that discharge stormwater from the permittee’s MS4 to waters of the state. For UTM Coordinates, X = easting coordinates and Y – northing coordinates. This NPDES permit covers all discharges from the permittee's outfalls for both major and non-major outfalls, unless regulated under a separate NPDES permit.  \nOUTFALL 001  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nOUTFALL 002  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nOUTFALL 003  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nOUTFALL 004  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nOUTFALL 005  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nOUTFALL 006  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nOUTFALL 007  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nOUTFALL 008  \nLegal Description UTM Coordinates:  \nReceiving Stream:  \nFirst Classified Stream and ID: USGS Basin & Sub-watershed:  \nSec. 13, T49N, R3 IW, Jackson County X = 388985 .91, Y = 4324046.52 Tributary to Burr Oak Creek  \nPresumed Use Streams; (C) WBID\\# 5065 103001010207  \nSec. 22, T49N, R32W, Jackson County X = 376246 .48, Y = 4324104.95 Tributary to Rock Creek  \nPresumed Use Streams; (C) WBID\\# 5065 103001010305  \nSec. 17, T49N, R31W, Jackson County X=382672 . 15, Y=4325138 .71 Tributary to Little Blue River  \nPresumed Use Streams; (C) WBID\\# 5065 103001010207  \nSec. 06, T49N, R3 I W, Ja","cbCaijxypI26x7VU","https://ap.wps.com/l/cbCaijxypI26x7VU","pdf",815702,"English","# Facility Description\n## Permit Authorization, Coverage, and Restrictions\n# Outfalls and Receiving Waters\n## Outfall 001\n## Outfall 002\n## Outfall 003\n## Outfall 004\n## Outfall 005\n## Outfall 006\n## Outfall 007\n## Outfall 008\n## Outfall 009\n## Outfall 010\n## Outfall 011\n# Coordinates and Legal Descriptions\n## UTM Coordinates and Stream Identifiers","[{\"question\":\"What permit is issued and who is authorized to discharge?\",\"answer\":\"Permit No. MO-0130401 authorizes the City of Independence to discharge stormwater from its municipal separate storm sewer system (MS4).\"},{\"question\":\"What are the permit effective and expiration dates?\",\"answer\":\"The effective date is September 1, 2023, and the expiration date is August 31, 2028.\"},{\"question\":\"Does the permit allow discharges other than stormwater?\",\"answer\":\"The permit authorizes only stormwater discharges under the Missouri Clean Water Law and the NPDES program; it does not apply to other regulated areas.\"}]","Missouri State Operating Permit - Permit No. MO-0130401 - City of Independence Independence Municipal Separate Storm Sewer System MS4 | PDF",1790679023,176]