[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-652572-105":59,"doc-detail-652572-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","mgb-help-for-setup-and-service-from-v200-connection-teach-in-operation-troubleshooting","MGB - Help for Setup and Service (from V2.0.0) - Connection - Teach-in operation - Troubleshooting","","MGB Help for Setup and Service (from V2.0.0) provides setup guidance and operational procedures for configuring and servicing the MGB safety device. It details electrical connection practices for buttons, emergency stop, and guard locking, including parallel control and interfacing to safety relays via clock pulse outputs. It also explains teach-in preparation and handle-module teaching steps, then offers a structured troubleshooting section mapping LED behaviors and fault indications to diagnostic actions and system status tables.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/mgb-help-for-setup-and-service-from-v200-connection-teach-in-operation-troubleshooting/652572/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/mgb-help-for-setup-and-service-from-v200-connection-teach-in-operation-troubleshooting/652572.png","ImageObject",300,407,{"name":92,"@type":93},"Ben ","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Where are the terminals for switches, lights, and emergency stop located for the MGB?","Question",{"text":112,"@type":113},"The terminal assignment is not described in the system manual. The terminals are provided in the MGB data sheet included with every delivery, and can also be found in the MGB catalog. The relevant connections are X2 and X3.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How is guard locking typically controlled, and when should IMP be used?",{"text":117,"@type":113},"Guard locking is typically controlled by a PLC via one channel. Monitoring the installed solenoid together with the locking arm supports PL e. For one-channel control, always use connection terminal IMP.",{"name":119,"@type":110,"acceptedAnswer":120},"What should be checked during teach-in preparation for AR configuration?",{"text":121,"@type":113},"For AR configuration teach-in standby state, FI1A and FI1B must be connected to DC 24 V. The document also instructs preparing the device connections as shown without applying voltage to UB yet.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},652572,1792881204,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},2336478951081,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","MGB  \nHelp for Setup and Service (from V2.0.0)  \nTable of contents  \n1 Connection ...................................................................................................................................................4  \n1.1 Connection of the buttons in the MGB...................................................................................................4  \n1.2 Control of the guard locking ...................................................................................................................4  \n1.3 Parallel control of the guard locking.......................................................................................................4  \n1.4 Operation on safety relay.......................................................................................................................4  \n2 Teach-in operation ......................................................................................................................................5  \n2.1 Preparing device for teach-in operation.................................................................................................5  \n2.2 Teaching in handle module....................................................................................................................6  \n3 Troubleshooting ..........................................................................................................................................7  \n3.1 LED DIA illuminated + LED STATE not illuminated (AR and AP modes) .............................................7  \n3.2 LED DIA illuminated + LED STATE flashes 1 time (AR and AP modes) ..............................................7  \n3.3 LED DIA illuminated + LED STATE flashes 2 times (single wiring – only AR mode)...........................8  \n3.4 LED DIA illuminated + LED STATE flashes 2 time (series wiring – only AR mode) ............................8  \n3.5 LED DIA illuminated + LED STATE flashes 3 time (AR and AP modes) ..............................................9  \n3.6 LED DIA illuminated + LED STATE flashes 4 time (AR and AP modes) ............................................10  \n3.7 LED DIA illuminated + LED Lock flashes 1 time (AR and AP modes) ................................................10  \n3.8 LED DIA not illuminated + LED STATE not illuminated or does not flash........................................... 11  \n3.9 LED DIA not illuminated + LED STATE flashes 3 times (AR and AP modes) ................................... 11  \n3.10 LED DIA not illuminated + LED STATE flashes approx. every 3 sec. (AR and AP modes) ............... 11  \n3.11 Individual flickering input LED on the evaluation unit .......................................................................... 11  \n4 System status tables .................................................................................................................................12  \n4.1 MGB-AR............................................................................................................................................... 12  \n4.2 MGB-AP ............................................................................................................................................... 13  \n1 Connection  \n1.1 Connection of the buttons in the MGB  \nThe terminal assignment of the switches (lights, buttons , emergency stop, etc. ) in the cover of the MGB is not described in the system manual. These terminals can be found in the associated data sheet of the MGB included with every delivery. Please contact EUCHNER if the data sheet has been lost, and you will promptly be sent a data sheet. Alternatively, you can look in the MGB catalog.  \nThe switches and the emergency stop are floating. However, the lights and the buttons all referred to a common potential. The terminals are to be found on connections X2 and X3 .  \nExample:  \n1.2 Control of the guard locking  \nThe guard locking is typically controlled by a PLC via one channel. The monitoring of the instal","cbCaiqhQPo1kzC4g","https://ap.wps.com/l/cbCaiqhQPo1kzC4g","pdf",967469,14,"English","# Connection\n## Connection of the buttons in the MGB\n## Control of the guard locking\n## Parallel control of the guard locking\n## Operation on safety relay\n# Teach-in operation\n## Preparing device for teach-in operation\n## Teaching in handle module\n# Troubleshooting\n## LED DIA illuminated + LED STATE not illuminated (AR and AP modes)\n## LED DIA illuminated + LED STATE flashes 1 time (AR and AP modes)\n## LED DIA illuminated + LED STATE flashes 2 times (single wiring – only AR mode)\n## LED DIA illuminated + LED STATE flashes 2 time (series wiring – only AR mode)\n## LED DIA illuminated + LED STATE flashes 3 time (AR and AP modes)\n## LED DIA illuminated + LED STATE flashes 4 time (AR and AP modes)\n## LED DIA illuminated + LED Lock flashes 1 time (AR and AP modes)\n## LED DIA not illuminated + LED STATE not illuminated or does not flash\n## LED DIA not illuminated + LED STATE flashes 3 times (AR and AP modes)\n## LED DIA not illuminated + LED STATE flashes approx. every 3 sec. (AR and AP modes)\n## Individual flickering input LED on the evaluation unit\n# System status tables\n## MGB-AR\n## MGB-AP","[{\"question\":\"Where are the terminals for switches, lights, and emergency stop located for the MGB?\",\"answer\":\"The terminal assignment is not described in the system manual. The terminals are provided in the MGB data sheet included with every delivery, and can also be found in the MGB catalog. The relevant connections are X2 and X3.\"},{\"question\":\"How is guard locking typically controlled, and when should IMP be used?\",\"answer\":\"Guard locking is typically controlled by a PLC via one channel. Monitoring the installed solenoid together with the locking arm supports PL e. For one-channel control, always use connection terminal IMP.\"},{\"question\":\"What should be checked during teach-in preparation for AR configuration?\",\"answer\":\"For AR configuration teach-in standby state, FI1A and FI1B must be connected to DC 24 V. The document also instructs preparing the device connections as shown without applying voltage to UB yet.\"}]","MGB - Help for Setup and Service (from V2.0.0) - Connection - Teach-in operation - Troubleshooting | PDF",35]