[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-386806-105":59,"doc-detail-386806-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","mercer-middle-school-neighborhood-update-2023-09","Mercer Middle School Neighborhood Update - 2023-09","","Neighborhood update for Mercer Middle School describing progress on the Asa Mercer Middle School Replacement Project. Demolition will wrap up, while the building pad and site begin shaping through excavation and earthwork, including storm, sewer, and water utility installation. It outlines traffic-control needs near 16th Ave. S. and South Columbian Way, emphasizes safe pedestrian communication with trained operators, and previews next month’s foundation improvements and geothermal well drilling. Includes working hours, noise and vibration rules, deliveries, TESC stormwater control, onsite conduct policies, and construction team contact information.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/mercer-middle-school-neighborhood-update-2023-09/386806/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/mercer-middle-school-neighborhood-update-2023-09/386806.png","ImageObject",300,407,{"name":92,"@type":93},"Ophelia","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-09-24",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the main construction progress this month?","Question",{"text":112,"@type":113},"Demolition of the existing building is wrapping up. Excavators and bulldozers are establishing the new subgrade and building footprint, and crews are starting installation of site utilities such as storm, sewer, and water.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How will traffic and work near 16th Ave. S. be handled?",{"text":117,"@type":113},"Site storm drain and sewer lines will be installed largely within the fenced area. Because of connection points into the right of way and into storm and sewer lines in South Columbian Way, traffic control and flagging will be necessary.",{"name":119,"@type":110,"acceptedAnswer":120},"What are the working hours and key noise or safety requirements?",{"text":121,"@type":113},"Standard work hours are 7AM–5PM, Monday–Friday, though additional hours may be needed with full compliance to City of Seattle ordinances. All activities comply with the City’s noise ordinance, backup alarms are required by WISHA and cannot be turned off, and operators are trained to make eye contact with pedestrians.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},386806,1790812018,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":81,"preview_page_count":4},7971461741311,"https://ap-avatar.wpscdn.com/avatar/74000253aff267980c6?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779345379180704826","NEIGHBORHOOD UPDATE  \nMERCER MIDDLE SCHOOL  \nThankyou to all the neighbors who came out to the site to say “hi”at our meet-and-greet!! This month, the Asa Mercer Middle School Replacement Project will wrap up demolition of the existing building, which is a big milestone. In addition, the building pad and site will begin to take form asthe excavators and bulldozers work to establish the new subgrade and building footprint, and to install some of the site utilities (like storm, sewer, and water) . Of note: along 16th Ave. S. , the site storm drain and sewer lines will be installed, largely within the fenced area. However, with connection points from the project site into the right of way and into storm and sewer lines in South Columbian Way, some traffic control and flagging will be necessary. With all this earthwork activity, a large volume of trucks will be entering and exiting the site. Truck drivers and equipment operators are trained  \nto make eye contact with pedestrians, so please don’t be shy, give them a wave and say “hi” so they know you’re there!  \nNext month, the project will begin foundation improvements and geothermal well drilling–stay tuned for more on this in next month’s update!  \nGOOD  \nTO KNOW  \nWORKING HOURS  \n3Standard work hours are 7AM–5PM, Monday–Friday. However, we may need to work additional hours on the project, including at night and on weekends. In all cases, working hours will be in full compliance with City of Seattle ordinances.  \nNOISE & VIBRATION  \n3All activities will comply with City of Seattle noise ordinance. Please note that backup alarms are required by Washington Industrial Safety and Health Act (WISHA) and cannot be turned off.  \nDELIVERIES  \n3The main project delivery is off of South Columbian Way. Deliveries off 16thAve. S. will be limited, on a case-by-case basis.  \nTEMPORARY EROSION AND SEDIMENT CONTROL (TESC)  \n3The project includes controlling all stormwater per the required TESC planto ensure only clean water leaves the site.  \nONSITE CONDUCT  \n3All employees are required toadhere to Cornerstone’sand Seattle Public Schools’jobsite conduct policies, which are strictly enforced.  \nCONSTRUCTION TEAM CONTACT INFO  \n3 Denny Wilson [DennyW@CornerstoneGCI.com](DennyW@CornerstoneGCI.com)  \n3 Matt Everett [Matt@CornerstoneGCI.com](Matt@CornerstoneGCI.com)  \n3Cornerstone General Contractors, Inc. 425.481.7460","cbCaibyg17al5pKM","https://ap.wps.com/l/cbCaibyg17al5pKM","pdf",348410,"English","# Working Hours\n# Noise & Vibration\n# Deliveries\n# Temporary Erosion and Sediment Control (TESC)\n# Onsite Conduct\n# Construction Team Contact Info","[{\"question\":\"What is the main construction progress this month?\",\"answer\":\"Demolition of the existing building is wrapping up. Excavators and bulldozers are establishing the new subgrade and building footprint, and crews are starting installation of site utilities such as storm, sewer, and water.\"},{\"question\":\"How will traffic and work near 16th Ave. S. be handled?\",\"answer\":\"Site storm drain and sewer lines will be installed largely within the fenced area. Because of connection points into the right of way and into storm and sewer lines in South Columbian Way, traffic control and flagging will be necessary.\"},{\"question\":\"What are the working hours and key noise or safety requirements?\",\"answer\":\"Standard work hours are 7AM–5PM, Monday–Friday, though additional hours may be needed with full compliance to City of Seattle ordinances. All activities comply with the City’s noise ordinance, backup alarms are required by WISHA and cannot be turned off, and operators are trained to make eye contact with pedestrians.\"}]","Mercer Middle School Neighborhood Update - 2023-09 | PDF",1790276291]