[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-460941-105":59,"doc-detail-460941-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","mechanical-lifting-and-rigging-protocol-r2-revision-date-12-22-20","Mechanical Lifting and Rigging Protocol - R2 - Revision Date 12-22-20","","A formal EHS protocol established for Devon US to implement safe mechanical lifting and rigging work practices that meet or exceed OSHA requirements. It defines responsibilities across leadership, line supervisors, EHS, and employees, and sets requirements for the safe use of lifting equipment and qualified personnel performing lifting/rigging operations. It covers general lifting, cranes, critical lifts, rigging, hoists, service cranes, gin pole trucks, fork lifts, other equipment, recordkeeping, training, references, and multiple appendices including hand signals, qualifications, inspection checklists, and critical lift worksheets.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/mechanical-lifting-and-rigging-protocol-r2-revision-date-12-22-20/460941/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/mechanical-lifting-and-rigging-protocol-r2-revision-date-12-22-20/460941.png","ImageObject",300,407,{"name":92,"@type":93},"McGucket","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-28","2026-09-30",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",15,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What is the purpose and objective of the Mechanical Lifting and Rigging Protocol?","Question",{"text":113,"@type":114},"The protocol ensures Devon implements safe work practices for mechanical lifting and rigging that meet or exceed OSHA requirements. It defines requirements for safe use of lifting equipment and the personnel responsible for lifting and rigging operations.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"Which equipment and scenarios does the protocol cover?",{"text":118,"@type":114},"It covers general lifting requirements and specific requirements for cranes, forklifts, hoists, service trucks, gin pole trucks, and other lifting equipment. It also addresses critical lifts and lifting loads with backhoes and trackhoes.",{"name":120,"@type":111,"acceptedAnswer":121},"What responsibilities are assigned to EHS, line supervisors, and Devon employees?",{"text":122,"@type":114},"Leadership must reinforce adherence and provide resources and training. Line supervisors ensure applicability and that employees have the skills and understanding to comply. EHS provides technical resources and monitors compliance through audits, while employees must adhere to protocol requirements and identify applicable training needs.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},460941,1790862556,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":145,"read_time":146,"preview_page_count":29,"preview_urls":147},1236954412713,"https://us-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| |  |  |  |  |\n| --- | --- | --- | --- | --- |\n|  |  | Mechanical Lifting and Rigging Protocol |  |  |\n| Hierarchy Level: Procedure |  |  | Document Type: Protocol |  |\n| Document Owner: EHS |  |  | Applies to: Devon US | Doc ID: 112972208 |\n| Revision Date: 12/22/2020 |  |  | Review Cycle: Every 3 Years | Effective 10/27/2014 |\n\nABOUT THIS PROTOCOL  \nPurpose This protocol was established to ensure Devon implements safe work  \npractices that meet or exceed OSHA’s mechanical lifting and rigging requirements to prevent damage or harm to equipment, facilities, or employees .  \nObjective  \nScope  \nApplicability  \nVariances  \nSuperseded Documents  \nThis protocol defines requirements for the safe use of mechanical lifting equipment and requirements for personnel responsible for lifting and rigging operations.  \n\n| This protocol covers general lifting requirements, specific requirements for cranes, forklifts, hoists, service trucks, gin pole trucks, applies to all Devon operated equipment and facilities/sites where mechanical lifting and rigging operations are performed . |\n| --- |\n| Employees performing, overseeing or responsible for mechanical lifting and rigging operations .\u003Cbr>Contractors will have their own program that meets or exceeds Devon’s Mechanical Lifting and Rigging Protocol . |\n| None . |\n| None . |\n\n\n| | Division:\u003Cbr>Corporate | Business Unit\u003Cbr>/Area: N/A | Protocol No.: COR 03-S17-PR | Page 2 | Revision/Approval Date: R2_ 12-22-20 |\n| --- | --- | --- | --- | --- | --- |\n| Mechanical Lifting & Rigging Protocol |  |  |  |  |  |\n\nTable of Contents  \n1.0 RESPONSIBILITIES .................................................................................................... 3  \n2.0 TERMS AND DEFINITIONS ........................................................................................... 3  \n2.1 Mechanical Lifting and Rigging Terms and Definitions .................................................... 3  \n2.2 General Terms and Definitions ................................................................................ 4  \n3.0 PROTOCOL ............................................................................................................ 5  \n3.1 General Lifting Requirements ................................................................................. 5  \n3.2 Cranes ............................................................................................................. 6  \n3.3 Critical Lifts ...................................................................................................... 8  \n3.4 Lifting Personnel with Cranes ................................................................................. 9  \n3.5 Rigging ............................................................................................................. 9  \n3.6 Hoists .............................................................................................................10  \n3.7 Service Cranes...................................................................................................11  \n3.8 Gin Pole Trucks .................................................................................................12  \n3.9 Lifting Loads with Backhoes & Trackhoes ..................................................................12  \n3.10 Powered Industrial Forklifts .................................................................................13  \n3.11 Other Lifting Equipment .....................................................................................14  \n4.0 RECORDKEEPING ....................................................................................................15  \n5.0 TRAINING REQUIREMENTS ........................................................................................15  \n6.0 REFERENCES .........................................................................................................16  \nAppendix A – Crane Hand Signals ......................................................................","cbCaigEMXY9HUHd9","https://ap.wps.com/l/cbCaigEMXY9HUHd9","pdf",1618866,53,"English","# 1.0 RESPONSIBILITIES\n# 2.0 TERMS AND DEFINITIONS\n## 2.1 Mechanical Lifting and Rigging Terms and Definitions\n## 2.2 General Terms and Definitions\n# 3.0 PROTOCOL\n## 3.1 General Lifting Requirements\n## 3.2 Cranes\n## 3.3 Critical Lifts\n## 3.4 Lifting Personnel with Cranes\n## 3.5 Rigging\n## 3.6 Hoists\n## 3.7 Service Cranes\n## 3.8 Gin Pole Trucks\n## 3.9 Lifting Loads with Backhoes & Trackhoes\n## 3.10 Powered Industrial Forklifts\n## 3.11 Other Lifting Equipment\n# 4.0 RECORDKEEPING\n# 5.0 TRAINING REQUIREMENTS\n# 6.0 REFERENCES\n# Appendix A – Crane Hand Signals\n# Appendix B – Operator Qualification Requirements\n# Appendix C – Personnel Hoisting\n# Appendix D – Inspection Intervals and Example Checklists\n# Appendix E – Backhoe Lifting Requirements\n# Appendix F – Diagrams of Good and Bad Rigging Practices\n# Appendix G – Sling Inspection Guidelines\n# Attachment A – Approval, Review, and Modification History\n# Attachment B – Critical Lift Worksheet\n# Attachment C – Physical Barrier Example for Electrical Lines (Goal Post)","[{\"question\":\"What is the purpose and objective of the Mechanical Lifting and Rigging Protocol?\",\"answer\":\"The protocol ensures Devon implements safe work practices for mechanical lifting and rigging that meet or exceed OSHA requirements. It defines requirements for safe use of lifting equipment and the personnel responsible for lifting and rigging operations.\"},{\"question\":\"Which equipment and scenarios does the protocol cover?\",\"answer\":\"It covers general lifting requirements and specific requirements for cranes, forklifts, hoists, service trucks, gin pole trucks, and other lifting equipment. It also addresses critical lifts and lifting loads with backhoes and trackhoes.\"},{\"question\":\"What responsibilities are assigned to EHS, line supervisors, and Devon employees?\",\"answer\":\"Leadership must reinforce adherence and provide resources and training. Line supervisors ensure applicability and that employees have the skills and understanding to comply. EHS provides technical resources and monitors compliance through audits, while employees must adhere to protocol requirements and identify applicable training needs.\"}]","Mechanical Lifting and Rigging Protocol - R2 - Revision Date 12-22-20 | PDF",1790760086,134,[148,152,156,160,164,168],{"page_no":8,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/38cfffbf3379b97219976fff37e4b6f0.webp",983,1272,{"page_no":14,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/02df405b997a21c63f7997878a529a60.webp",982,1270,{"page_no":81,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/e71ea94ff5f0aa1a3607701b96c5bc50.webp",981,1269,{"page_no":19,"url":161,"width":162,"height":163},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/8979875c9a1254195278e4cbdfb95000.webp",980,1268,{"page_no":24,"url":165,"width":166,"height":167},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/fdb3403af3f05ead0b16fcae885e1c3f.webp",979,1267,{"page_no":29,"url":169,"width":170,"height":171},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d7dc8843bbb6658c69ec9c0373905041.webp",978,1265]