[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662811-105":59,"doc-detail-662811-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","mechanical-construction-idc-partial-first-floor-demolition-plan-demolition-notes","MECHANICAL CONSTRUCTION IDC - PARTIAL FIRST FLOOR DEMOLITION PLAN - Demolition Notes","","Mechanical construction demolition plan information for a campus building in Columbia, South Carolina. The content includes building code and design standards references, building height and occupancy notes, fire-resistance rating considerations, and assumed fire protection requirements. It also provides a drawing index and detailed demolition notes covering removal of hot water piping, duct-mounted coils and controls, zones sensors, takeoff fittings, air handler components, smoke dampers, and associated steam and condensate piping, with patching and stainless steel blank plate provisions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/mechanical-construction-idc-partial-first-floor-demolition-plan-demolition-notes/662811/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/mechanical-construction-idc-partial-first-floor-demolition-plan-demolition-notes/662811.png","ImageObject",300,407,{"name":92,"@type":93},"Asher","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What main building standards are referenced in the mechanical construction document?","Question",{"text":112,"@type":113},"The document cites international fire code (2015 edition), international planning/pleach and national electrical code (2014 edition), ASHRAE/IESNA 90.1 energy standard (2007 edition), and ICC/ANSI A117.1 for accessible and usable buildings and facilities.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the demolition plan require for hot water piping and related components?",{"text":117,"@type":113},"Remove existing hot water piping as shown, remove duct-mounted hot water coil, controls, and duct as required to accommodate new work, and provide stainless steel blank plates over unused wall boxes.",{"name":119,"@type":110,"acceptedAnswer":120},"Which additional systems and devices are specified for removal in the demolition notes?",{"text":121,"@type":113},"The notes specify removing takeoff fitting and patching trunk duct, removing the air handler complete (leaving the concrete pad), removing the smoke damper, removing ductwork as required, and removing duct-mounted steam humidifier and associated steam/condensate piping back to the mechanical room with lines capped at mains.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662811,1793222589,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},687197207639,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","| DESIGN CODES AND STANDARDS   |  |  |  |  |  |  | COLUMBIA, SC 29208  \u003Cbr>AND CONSTRUCTION  \u003Cbr>CAMPUS PLANNING   |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| PROJECT DESIGNED INACCORDANCE WITH  \u003Cbr>INTERNATIONAL FIRE CODE,2015 EDITION  \u003Cbr>INTERNATIONAL PLECHAING COCDD2255DFDIOION  \u003Cbr>NATODNAL E IECTSICAL CODEUNTPNs”.2014 EDIION  \u003Cbr>ASHRAE/IESNA 90.1 ENERGY STANDARD FOR BUILDINGS EXCEPT L₀W-RISE RESIDENTAL BUILDINGS,2007 EDITION  \u003Cbr>10.ICC/ANSI-A117.1-1998,ACCESSIBLE AND USABLE BUILDINGS AND FACLITES   |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| BUILDING CODE REVIEW INFORMATION:  \u003Cbr>uo ReoNioe iECEME 195  \u003Cbr>1.OCCUPANCY(EXISTING OCCUPANCY TO REMAIN:A-1,SMALL ASSEMBLY WITHOUT STAGE)  \u003Cbr>2.TYPE OF CONSTRUCTION  \u003Cbr>A.EXISTING BUILDING:IV UNPROTECTED NONCOMBUSTIBLE(1994 SBC)  \u003Cbr>3.GENERAL BUILDING DESIGN,ALLOWABLE AREA,HEIGHT AND OCCUPANT LOAD   |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | BUILDING HEIGHT:EXISTING BUILDING HEIGHT WILL NOT BE MODIFIED   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | CEP AN cue-Y OL1OMALEE MoGrHIAo cCcPNT LOAD ESINC REA   |  |  |  |  |  |  |  |  |  |  |  |  |\n| 4.FIRE RESISTANCE RATING OF BUILDING ELEMENTS   |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| 8.  \u003Cbr>9.  \u003Cbr>5.   | ARINRES ASCLRAINL ME BUSLIN RLE BE MSODH EXISTING FRE RESTANCE   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | FIRE RESISTANCE RATING OF BUILDING ELEMENTS   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | Me   | C   |  | L   | BsCM cne   |  |  |  |  |  |  |  |  |\n|  |  | NONCOMBUSTIBLE   |  | NONCOMBUSTIBLE   | -   |  |  |  |  |  |  |  |  |\n|  | DrADINIC WALIc -YTrDIOD   | NONCOMBUSTIBLE    |  | NONCOMBUSTIBLE   |  |  |  |  |  |  |  |  |  |\n|  | BEAPNC wL AIEOP   | NONCOMBUSTIBLE   |  | NONCOMBUSTBLE   |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | oIHRORNe A S DAEo   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | FLOOR CONSTRUCTION,INCLUDING  \u003Cbr>SLIDDORTINC BEAMS &  IOISTSpp100  \u003Cbr>seC KaLE 60   | NONCOMBUSTIBLE   |  | NONCOMBLISTIBLE   |  |  |  |  |  |  |  |  |  |\n|  | soP RONS BECISN NoLU5Ne  \u003Cbr>SBC TABLE 600)   | NONCOMBUSTIBLE   |  |  |  |  |  | a 8   |  |  |  |  |  |\n|  | FIRE WALS CPER 94 SB ADL 700   |  |  |  | NONE IN PROJECT   |  |  |  |  |  |  |  |  |\n|  | SHAT ENCLOSUuES e m s eu   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | 孟   | DATE   |  |  |  |  |  |\n|  | EKITS AND STARWAS Pe 195s DE   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | **ASSUMED RATNG BASED ON ORIGINAL DRAWINGS  \u003Cbr>PTHER FiIRE PROTECTION REQUREMENTS   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | OTHER FIRE PROTECTION REQUIREMENTS   |  |  |  |  |  |  | Z  \u003Cbr>C  \u003Cbr>E  \u003Cbr>A  \u003Cbr>C  \u003Cbr>C  \u003Cbr>U.   |  |  |  |  |  |\n|  | ITEM   | YES   |  |  | COMMENTS   |  |  |  |  |  |  |  |  |\n|  | E SeP8KLE5 EOUIED   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | 23MAY17   |  |  |  |  |  |  |\n|  | AE STANDPES REOUIED?Pe o*   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | 5A Fie5AL STEM REOUuIED?   |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| DRAWING INDEX   |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| GENERAL  \u003Cbr>T1 TITLE SHEET  \u003Cbr>MECHANICAL  \u003Cbr>M1 FIRST FLOOR DEMOLITION PLAN  \u003Cbr>M2 FIRST FLOOR RENOVATION PLAN  \u003Cbr>FIRST FLOOR RENOVATION PLAN-PIPING  \u003Cbr>M4  \u003Cbr>DETAILS,NOTES,SCHEDULES,AND LEGEND   |  |  |  |  |  |  | 1-98291   |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | 盈   |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  | m University of South Carolina   |  |  |  |  |\n|  |  |  | Swygert &Associates  \u003Cbr>C0NSULTING ENGINEERS   |  |  |  | SHEET  \u003Cbr>T1  \u003Cbr>0F   |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | OF   |  |  |  |  |  |  |\n\nMECHANICAL CONSTRUCTION IDC  \nSTATE PROJECT NO.:H27-D295-CBBLATT PE CENTERREPLACE AHU\\#1STATE PROJECT NO.:H27-N236-CBCOLUMBIA,SCCONSTRUCTION DOCUMENTS  \n| DEMOL","cbCaijpn0UEMjobZ","https://ap.wps.com/l/cbCaijpn0UEMjobZ","pdf",980947,"English","# Building code review information\n# Building height and design considerations\n# Fire resistance ratings and fire protection requirements\n# Assumed rating based on original drawings\n# Other fire protection requirements (item checklist)\n# Drawing index\n# Demolition notes","[{\"question\":\"What main building standards are referenced in the mechanical construction document?\",\"answer\":\"The document cites international fire code (2015 edition), international planning/pleach and national electrical code (2014 edition), ASHRAE/IESNA 90.1 energy standard (2007 edition), and ICC/ANSI A117.1 for accessible and usable buildings and facilities.\"},{\"question\":\"What does the demolition plan require for hot water piping and related components?\",\"answer\":\"Remove existing hot water piping as shown, remove duct-mounted hot water coil, controls, and duct as required to accommodate new work, and provide stainless steel blank plates over unused wall boxes.\"},{\"question\":\"Which additional systems and devices are specified for removal in the demolition notes?\",\"answer\":\"The notes specify removing takeoff fitting and patching trunk duct, removing the air handler complete (leaving the concrete pad), removing the smoke damper, removing ductwork as required, and removing duct-mounted steam humidifier and associated steam/condensate piping back to the mechanical room with lines capped at mains.\"}]","MECHANICAL CONSTRUCTION IDC - PARTIAL FIRST FLOOR DEMOLITION PLAN - Demolition Notes | PDF",13]