[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662859-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662859-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","mechanical-and-plumbing-plans","Mechanical and Plumbing plans","","Plumbing and mechanical construction plan sheets outline fixture scheduling and electrical/MEP coordination information for a project identified by a job number. The content includes sections for construction set addenda and contractor verification responsibilities, along with notes to subcontractors on receiving complete construction documents and taking responsibility for scope. Additional listings cover tenant-specific phase notes, electrical responsibility scheduling, and requirements related to fire alarm system wiring, conduit, and temperature/environment constraints.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/mechanical-and-plumbing-plans/662859/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/mechanical-and-plumbing-plans/662859.png","ImageObject",300,407,{"name":42,"@type":43},"Cipher","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of the plumbing fixture schedule section?","Question",{"text":62,"@type":63},"It records required plumbing fixtures and schedules as part of the construction document set for the project.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What responsibilities are assigned to contractors and subcontractors?",{"text":67,"@type":63},"Contractors/subcontractors are instructed to receive complete construction documents and specifications and are responsible for executing the complete scope of work as described in the documents.",{"name":69,"@type":60,"acceptedAnswer":70},"What system requirements are referenced in the document?",{"text":71,"@type":63},"The document includes requirements related to a fire alarm system, including wiring and related components such as conduit and low-voltage cabling.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662859,1793222786,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},687208528416,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","семераг мер соокомапом мотез  \n善  \nc     ⁹iev  \nронот оите НРмо оуея ецестмсм РчЕв.  \nPLUMBING FIXTURE SCHEDULE:  \nA5e   527    rn  \n\n| DATE:01/11/2D18  \u003Cbr>JOB NO:135-PRIMARY  \u003Cbr>DRAWN STAFF   |\n| --- |\n\nCHECKED BY:TB  \nAD+ASSOOAES   1  \nMONTEREY PARK,CA 91755  \nMONTEREY PARK  \n3000 MARKET PLACE DR.  \nSTORE135-PRIMARY  \n| sAEST8   Y ET   |\n| --- |\n| CONSTRUCTION SET   |\n|  |\n|  |\n|  |\n| REVSICNS   |\n| A  \u003Cbr>ADDENDUM1   |\n| a  \u003Cbr>BUILDING RESUEMITTAL   |\n|  |\n|  |\n|  |\n|  |\n|  |\n|  |\n|  |\n| MEP LANDLORD   |\n| COORDINATION   |\n| MEP1.0   |\n\nFORREFERENCE ONLY  \nС)меепооввин  \nNOTE TO CONTRACTORS  \nALLSUBCONTRACTORS SHALLRECEVEACOMPLETE SET OF CDNSTHUCTION DOCUMENTS AND SPECFILATIONS  \nANO SHALL BERESPONSIBLEFOR THER CCMPLETE SCOPEOFWORKREGARDLESS OFMERE IN TE  \nDOCUMENTSEIT THEDESCRIPION OFWORKAPPEARS.  \n# CONTRACTOR VERIFICATION RESPONSIBILITIES\n\noOTHEAen1EerFoRverAneneFonE STARiueconruenon OME ACHmEer.AoENOMER  \nARE NOT RESPONSIELE FORANY EFFORTS INCONSTRUCTION WHERE suCHDISCREPANCIES.OMIssIONS OR  \nNCONSBTENCES HAVE NOTBENREPORTED INATIMELY MANER.  \n\n| иПиту тване-овмея  \u003Cbr>ONEIINE DAGRAMNOTES  \u003Cbr>口  \u003Cbr>имовпторроирсмиролмсд,гоудесио,аи  \u003Cbr>маР Аб знсну  \u003Cbr>2  \u003Cbr>ENGNERSHOWNFOR REFERENCE ONLY.  \u003Cbr>恩  \u003Cbr>МЗ вгичоопэу  \u003Cbr>свсип бснерие  \u003Cbr>tc-CAPO  \u003Cbr>ан оаноистояз!гезавеаавером  \u003Cbr>回  \u003Cbr>говунгсм эонч  \u003Cbr>оо лмрз  \u003Cbr>LANDLORD ELECRDCM  \u003Cbr>тб реаснатеп тевммапоманп ссррен  \u003Cbr>CONOUCTORSWITH TYPETNTHMN-2  \u003Cbr>Сзр  \u003Cbr>мзлатсмдуненеашлминимсонвистояз  \u003Cbr>брАое  \u003Cbr>брасе  \u003Cbr>SPACE  \u003Cbr>ARE ALOWEDPERSPECIFICATIONS AND  \u003Cbr>RATEDLESS THAN75DEGC.MODIFY  \u003Cbr>вргез асоопртото мгра то  \u003Cbr>ЫбВС литиее гееоев вутеммт  \u003Cbr>FEEDERDESIGNED BYLNDLORD ENGNEER  \u003Cbr>ELECTRICAL RESPONSIBILITY SCHEDULE  \u003Cbr>MADP国Br   0RD  \u003Cbr>Г  \u003Cbr>змтснвоаяб  \u003Cbr>120 анрв  \u003Cbr>ецес яоом  \u003Cbr>гсаулаочза ан  \u003Cbr>е  \u003Cbr>30A  \u003Cbr>Стром  \u003Cbr>Сом  \u003Cbr>Сал  \u003Cbr>Саоа  \u003Cbr>Стл  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>C  \u003Cbr>SPAcz SPACE  \u003Cbr>T  \u003Cbr>anou  \u003Cbr>то втвистинм, зтее  \u003Cbr>то авоче споино мета иршсч  \u003Cbr>то иатен бенуЮе   \u003Cbr>TO BULDING FOOTNG (UFER)  \u003Cbr>то сяоима воагз)—  \u003Cbr>т  \u003Cbr>吉  \u003Cbr>FM  \u003Cbr>воогто  \u003Cbr>епарсчелн  \u003Cbr>WMFI  \u003Cbr>туаеГавттлачТМотовТеев  \u003Cbr>т  \u003Cbr>томе  \u003Cbr>CFM  \u003Cbr>HP]  \u003Cbr>нимнем  \u003Cbr>3P  \u003Cbr>R  \u003Cbr>TCH157H4M 85 MSA  \u003Cbr>3.000  \u003Cbr>сЭчмлнам  \u003Cbr>Г«пТ  \u003Cbr>FNNG  \u003Cbr>очгялнам  \u003Cbr>IFNNrST  \u003Cbr>R5  \u003Cbr>лю  \u003Cbr>5JJ  \u003Cbr>LENNUX二  \u003Cbr>LHDSH4E  \u003Cbr>113145L4-  \u003Cbr>IFNNTY  \u003Cbr>C  \u003Cbr>II  \u003Cbr>анозгнамТ  \u003Cbr>еннох  \u003Cbr>7.5二  \u003Cbr>2450  \u003Cbr>RTU-7  \u003Cbr>MAN  \u003Cbr>085  \u003Cbr>MODELNUMBERSSHAL NOTBE CONSIDERED COMPLETEAND MATERIALSHALLNOTB  \u003Cbr>кемемнесомриетеоезскртки,мотеб,нозреспсаткмзторетелмметн  \u003Cbr>тне мАчигАотивелашатеоаве тне пАвзгог тне оєан  \u003Cbr>енеш мрдочслемтрылаемотея  \u003Cbr>АпоогторинтлнрА огтючеиеєєеєочееиетеЫтнегнее енАиве л  \u003Cbr>вяереятояосеторимтсомтяоЦмАтяхроя сонтвогееАтУдеб,морШеб,А  \u003Cbr>o arweнtezеогопобнмоганеснтпоогтсмелатипе  \u003Cbr>рвоуоеамсн,меяуярсеатео тнпоимимуаяептевб  \u003Cbr>егеспео ганеер ассоинтв гоя рИсТцоєєеє ехтЕвмА тоимт  \u003Cbr>егсспгоглнтег нешогє схспммристмюотепми гитгл,юоцмчо с  \u003Cbr>гпоуае мнигаатипспо стинаалы ношиатео поогаипвуитимммимнше  \u003Cbr>c  \u003Cbr>омвюмавсочтнасторенаш рномреовсомнестямтен  \u003Cbr>н  \u003Cbr>зтаятерзговац мотовеенишвееирмвнеомтесвмаитнинт  \u003Cbr>сооаонатеяшгог сонристор тгямнатом шоеитн сомристсд яагбє  \u003Cbr>евоуоеиеатневневбтамторсгоирсехвесертасшеитнмеатнеяряоое  \u003Cbr>егьоет оошгмсмтгоп еьеиатюн огаюо геетавочС осАцгмсь  \u003Cbr>M  \u003Cbr>мррочое сиаврбторротестсочоемвея сош громнииоя отнев оаисе  \u003Cbr>оавемм.оиибнеавзоиитемммим оитвреаясемизноуентиапомвез  \u003Cbr>TENANTINFIL PHASE NOTES:  \u003Cbr>керея тояосгтор имт сомтяо матяхроя сонтвоц геатияев,мюоиьев,А  \u003Cbr>нУАс ВЕЗРОМЯ  \u003Cbr>емб пмо—  \u003Cbr>TEM  \u003Cbr>Голтас  \u003Cbr>воортор импз:  \u003Cbr>RTU-1,RTU2,RTU3.RTU4,RTU-5,RTU6AND RTU-7  \u003Cbr>очот амоне ретсотокэ  \u003Cbr>оистемоке бетестов кеуеовевете   |\n| --- |\n\n\n|  |\n| --- |\n| NSTALEDBY  \u003Cbr>FURNISHEDBY二  \u003Cbr>RE-DSE  \u003Cbr>ТЕМ  \u003Cbr>REMARKS  \u003Cbr>LDLORD GONTRAGTORENOSTNG  \u003Cbr>оитаоентсл лныбяоТо","cbCaidKAmb9o8rVM","https://ap.wps.com/l/cbCaidKAmb9o8rVM","pdf",33638821,18,"English","# PLUMBING FIXTURE SCHEDULE\n# CONTRACTOR VERIFICATION RESPONSIBILITIES\n# NOTE TO CONTRACTORS\n# TENANT INFIL PHASE NOTES\n# ELECTRICAL RESPONSIBILITY SCHEDULE\n# FIRE ALARM SYSTEM","[{\"question\":\"What is the purpose of the plumbing fixture schedule section?\",\"answer\":\"It records required plumbing fixtures and schedules as part of the construction document set for the project.\"},{\"question\":\"What responsibilities are assigned to contractors and subcontractors?\",\"answer\":\"Contractors/subcontractors are instructed to receive complete construction documents and specifications and are responsible for executing the complete scope of work as described in the documents.\"},{\"question\":\"What system requirements are referenced in the document?\",\"answer\":\"The document includes requirements related to a fire alarm system, including wiring and related components such as conduit and low-voltage cabling.\"}]","Mechanical and Plumbing plans | PDF",45]