[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649443-105":59,"doc-detail-649443-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","measured-surveys-of-land-buildings-and-utilities-global-3rd-edition-effective-from-8-december-2014","Measured surveys of land, buildings and utilities - Global 3rd edition - Effective from 8 December 2014","","RICS Professional Standard: Measured surveys of land, buildings and utilities sets requirements for conducting measured surveys on a global basis. It defines the measured survey specification, including project information, survey purpose and designation, roles and payment responsibilities, contract form, survey location and extent, and key execution requirements. It also establishes expectations for accuracy, control, coordinate grids, datum, survey accuracy banding, coordinate reference systems, and control network planning and heights. Effective from 8 December 2014 for the 3rd edition.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/measured-surveys-of-land-buildings-and-utilities-global-3rd-edition-effective-from-8-december-2014/649443/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/measured-surveys-of-land-buildings-and-utilities-global-3rd-edition-effective-from-8-december-2014/649443.png","ImageObject",300,407,{"name":92,"@type":93},"eBook King","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-23",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What is the document’s scope and publication context?","Question",{"text":111,"@type":112},"It is an RICS Professional Standard for measured surveys of land, buildings and utilities, stated as global. The provided pages list it as the 3rd edition, November 2014, effective from 8 December 2014.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"Which project information does the standard require for survey execution?",{"text":116,"@type":112},"The contents show a detailed set of project information items, including project designation and purpose, client/payment responsibility, contract form, survey location and extent, schedule dates, project contacts, site access principles and requirements, and survey facilities. It also covers information for executing the project, staff competence, equipment calibration/checking, and protection and risk/safety briefing.",{"name":118,"@type":109,"acceptedAnswer":119},"How does the standard address survey accuracy and positioning control?",{"text":120,"@type":112},"It includes requirements and structures for survey accuracy, accuracy banding and accuracy band tables, plus survey coordinate reference system selection. It also specifies connection of the chosen survey grid to other coordinate reference systems where applicable, and defines elements of the survey control network and its plan and height accuracy.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},649443,1792799980,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},962088006270,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","RICS PROFESSIONAL STANDARD  \nMeasured surveys of land, buildings and utilities  \nGlobal  \n3rd edition, November 2014 Effective from 8 December 2014  \ni  \nMeasured surveys of land, buildings and utilities  \nRICS professional standard, global  \n3rd edition, November 2014 Effective from 8 December 2014  \nPublished by the Royal Institution of Chartered Surveyors (RICS)  \nParliament Square London  \nSW1P 3AD  \n[www. rics.org](www. rics.org)  \nNo responsibility for loss or damage caused to any person acting or refraining from action as a result of the material included in this publication can be accepted by the authors or RICS.  \nProduced by the Geomatics working group of the Royal Institution of Chartered Surveyors.  \nFirst edition published as Specification for surveys of land, buildings and utility services at scales of 1:500 and larger, March 1986.  \nSecond edition published as Surveys of land, buildings and utility services at scales of 1:500 and larger, February 1996.  \nThis document was originally published in November 2014 as an RICS guidance note and was reissued in December 2023 as an RICS professional standard.  \nISBN 978 1 78321 064 0  \n© Royal Institution of Chartered Surveyors (RICS) November 2014. Copyright in all or part of this publication rests with RICS. No part of this work may be reproduced or used in any form or by any  \nii  \nmeans including graphic, electronic, or mechanical, including photocopying, recording, taping or web distribution, without the written permission of RICS or in line with the rules of an existing licence.  \niii  \nContents  \nRICS standards framework 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 1  \nPreface 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 3  \nMeasured survey specification – introduction 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 5  \n1 Project information 􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮􀀮 6  \n1.1 Project designation ............................................................................................... 6  \n1.2 Purpose of project ................................................................................................. 6  \n1.3 Client/agent responsible for payment of works ................................................ 6  \n1.4 Form of contract .................................................................................................... 6  \n1.5 Survey location/extent of survey ....................................................................... 6  \n1.6 Project requirements summary ......................................................................... 7  \n1.7 Survey schedule dates .......................................................................................... 7  \n1.8 Project contacts ..................................................................................................... 7  \n1.9 Site access principles ............................................................................................ 8  \n1.10 Site access requirements .................................................................................... 9  \n1.11 Survey facilities ..................................................................................................... 9  \n1.12 Information to support project execution ...................................................... 10  \n1.13 Competence of survey staff ................................................................................ 11  \n1.14 Calibration and checking of equipment ............................................................ 11  \n1.15 Protection of property ......................................................................................... 11  \n1.16 Risk assessment and safety briefing .................................................................. 11  \n1.17 Client identified project constraints ....................","cbCairiY7J26qNzO","https://ap.wps.com/l/cbCairiY7J26qNzO","pdf",2717542,95,"English","# RICS standards framework\n# Preface\n# Measured survey specification – introduction\n# 1 Project information\n## 1.1 Project designation\n## 1.2 Purpose of project\n## 1.3 Client/agent responsible for payment of works\n## 1.4 Form of contract\n## 1.5 Survey location/extent of survey\n## 1.6 Project requirements summary\n## 1.7 Survey schedule dates\n## 1.8 Project contacts\n## 1.9 Site access principles\n## 1.10 Site access requirements\n## 1.11 Survey facilities\n## 1.12 Information to support project execution\n## 1.13 Competence of survey staff\n## 1.14 Calibration and checking of equipment\n## 1.15 Protection of property\n## 1.16 Risk assessment and safety briefing\n## 1.17 Client identified project constraints\n## 1.18 Surveyor identified project constraints\n## 1.19 Obscured features\n## 1.20 Action to reduce/remove obscured features\n## 1.21 Access issues\n## 1.22 Survey records retention\n## 1.23 Survey records access\n## 1.24 Cost for supply of records\n# 2 Survey accuracy, control, coordinate grid and datum\n## 2.1 Survey accuracy\n## 2.2 Survey accuracy banding\n## 2.3 Survey accuracy band table\n## 2.4 Survey coordinate reference system\n## 2.5 Connection of chosen survey grid to other coordinate reference systems (where applicable)\n## 2.6 Survey control network\n## 2.7 Survey control network plan accuracy\n## 2.8 Survey control height accuracy","[{\"question\":\"What is the document’s scope and publication context?\",\"answer\":\"It is an RICS Professional Standard for measured surveys of land, buildings and utilities, stated as global. The provided pages list it as the 3rd edition, November 2014, effective from 8 December 2014.\"},{\"question\":\"Which project information does the standard require for survey execution?\",\"answer\":\"The contents show a detailed set of project information items, including project designation and purpose, client/payment responsibility, contract form, survey location and extent, schedule dates, project contacts, site access principles and requirements, and survey facilities. It also covers information for executing the project, staff competence, equipment calibration/checking, and protection and risk/safety briefing.\"},{\"question\":\"How does the standard address survey accuracy and positioning control?\",\"answer\":\"It includes requirements and structures for survey accuracy, accuracy banding and accuracy band tables, plus survey coordinate reference system selection. It also specifies connection of the chosen survey grid to other coordinate reference systems where applicable, and defines elements of the survey control network and its plan and height accuracy.\"}]","Measured surveys of land, buildings and utilities - Global 3rd edition - Effective from 8 December 2014 | PDF",239]