[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649491-105":59,"doc-detail-649491-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","materials-plan-sheet-l-200","Materials Plan - Sheet L-200","","Materials Plan Sheet L-200 for the Bill and Helen Norrie Library project at 15 Poseidon Bay, Winnipeg, MB. The plan specifies exterior hardscape and landscape elements including concrete curb and curb ramps, asphalt and concrete paving, structural slab references, topsoil and sod, mixed grass seed, shrub beds with mulch, and crushed granite rock mulch. It also identifies site furnishings and systems such as wood deck areas, bike racks, lighting standards, catchbasins, waste and recycling receptacles, electric vehicle charging stations, and parking/bike details. Layout and materials notes outline service location coordination, staking confirmation, dimension units in metres, and returning disturbed areas to original conditions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/materials-plan-sheet-l-200/649491/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/materials-plan-sheet-l-200/649491.png","ImageObject",300,407,{"name":92,"@type":93},"Alexandar","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What site elements does the Materials Plan Sheet L-200 specify?","Question",{"text":112,"@type":113},"Sheet L-200 lists pavement, curbs, curb ramps, topsoil and sod, grass seed, shrub beds with mulch, lighting standards, catchbasins, waste and recycling receptacles, bike racks, and electric vehicle charging stations, along with wood deck and bench references.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What coordination requirements are stated in the layout and materials notes?",{"text":117,"@type":113},"The notes require ensuring all existing services (old and recently installed) are clearly located onsite before construction, and coordinating any needed relocation or repairs by the contractor.",{"name":119,"@type":110,"acceptedAnswer":120},"How should layout and staking be confirmed before installing hard surfaces?",{"text":121,"@type":113},"The notes state that layout must not be done prior to locating the new building, and that stakeout design must be confirmed with the contract administrator on site before hard surfaces are installed.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649491,1792800540,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962090768658,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","|  | |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| FUT\u003Cbr>CONCR |  |  |  |  | \u003Cbr>|\n|  |  |  | | Existing Playground\u003Cbr>\u003Cbr>|  |\n|  | CONCRETE TO MEET EDGE OF EXISTING SIDEWALK | |  |  |  |\n|  | |  |  |  |  |\n\nPOSEIDON BAY  \nC. I. P. CONCRETE CURB SEE CIVIL  \n WITH PAVERS, TYP.  \n CURB RAMP, TYP.   \n~~ ~~ ELECTRIC CHARGING STATION  \nSEE ELECTRICAL  \nAm Pool  \nSITE MATERIALS PLAN  \n1:300  \n26  \n1  \n15  \n30 31  \n25  \n33  \n14  \n34 41 STAFF PARKING  \nSTAFF PARKING  \nSTAFF PARKING  \nSTAFF PARKING  \nSTAFF PARKING  \n40  \n47  \nCAMBR IDGE STEET  \nNorth  \nSite  \nComm. No.: 1847  \nPlotted on: 12/11/2018 1:30:18 PM  \nPan  \n5 July 08, 2019 Issued for Construction  \n4 June 26, 2019 Issued for 100% Pre-Tender Review  \n3 May 13, 2019 Issued for Pre-Tender Review  \n2 Feb. 22, 2019 Detailed Design Review  \n1 Dec. 17, 2018 Schematic Design Review  \nDROP-OFF ZONE & LOADING ZONE LINE PAINTING  \nSEE SPECIFICATIONS  \nLIBRARY ROOF OVERHANG TYP.  \nWOOD DECK  \nDL  \nDL  \nDL  \nGRANT AVENUE  \nEXISTING SIDEWALK  \nDrawn By:  \nPrinting Date:  \nIPLC RECEPTACLES SEE ELECTRICAL  \nSOD REPAIR AS NECESSARY  \nWASTE & RECYCLING RECEPTACLE, TYP.  \nLEGEND  \nASPHALT PAVING SEE CIVIL  \nCONCRETE PAVING-LIGHT  \nSTRUCTURAL SLAB  \nSEE STRUCTURAL  \nTOPSOIL & SOD  \nTOPSOIL & MIXED GRASSLAND SEED  \nSHRUB BED WITH MULCH  \nCRUSHED GRANITE ROCK MULCH  \nWOOD DECK  \nPROPERTY LINE  \nPROPERTY LINE SETBACK  \nCONCRETE CURB  \nNEW CATCHBASIN SEE CIVIL  \nLIGHT STANDARD SEE ELECTRICAL  \nPARKING RECEPTACLE SEE ELECTRICAL  \nELECTRIC VEHICLE CHARGING STATION SEE ELECTRICAL  \nGARBAGE RECEPTACLE SEE SPECIFICATIONS  \nBIKE RACKS  \nSEE SPECIFICATIONS  \nLIMESTONE BOULDER  \nLAYOUT & MATERIALS NOTES  \n1. ENSURE THE LOCATION OF ALL EXISTING SERVICES BOTH OLD AND RECENTLY INSTALLED ARE CLEARLY LOCATED ONSITE PRIOR TO CONSTRUCTION. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATION AND COST OF ANY RELOCATION, BURYING OF SERVICES OR REPAIRING ALL DAMAGE CAUSED TO SERVICES DURING CONSTRUCTION.  \n2. LAYOUT MAY BE PROVIDED BY ELECTRONIC FILE OR GEOREFERENCED GRID UPON REQUEST.  \n3. DO NOT LAYOUT SITE PRIOR TO LOCATING THE NEW BUILDING. USE THE NEW BUILDING AS PRIMARY REFERENCE FOR SITE LAYOUT.  \n4 . ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED.  \n5. STAKEOUT DESIGN AND CONFIRM LAYOUT WITH CONTRACT ADMINISTRATOR ON SITE PRIOR TO INSTALLING HARD SURFACES.  \n6. REPORT ANY ON SITE DISCREPANCIES TO THE CONTRACT ADMINISTRATOR IMMEDIATELY.  \n7. SEE DWG L-200 FOR GRADING AND L-300 FOR PLANTING.  \n8. LAYOUT PLANS WILL BE AVAILABLE IN DWG OR DXF FORMAT FOR GPS LAYOUT.  \n9. REFER TO SPECIFICATIONS FOR DETAILED MATERIAL DESCRIPTIONS.  \n10. ANY AREA DISTURBED BY CONSTRUCTION NOT SHOWN ON THIS DRAWING MUST BE RETURNED TO IT ' S ORIGINAL CONDITION.  \nBill and Helen Norrie Library  \nProject No.: 2017-082  \nTender No.: 542-2019  \nAddress: 15 Poseidon Bay, Winnipeg, MB.  \nMaterials Plan  \nSheet: L-200  \nPlotted on: 12/11/2018 1:30:18 PM C:\\Users\\R.VanBelleghem\\Documents\\1847_BHN Library_r.vanbelleghem. rvt  \nCURVED CONCRETE & TIMBER BENCH  \n2 & 3 L-601  \n1 L-603  \n3 L-603  \n6 L-603  \n5 L-603  \n9 L-603  \n1 & 3 L-601  \n1 & 2 L-602  \nSURFACE MOUNTED BIKE RACK, TYP.  \n3 L-602  \n4 L-603","cbCainrTp1tHvujt","https://ap.wps.com/l/cbCainrTp1tHvujt","pdf",932100,"English","# Layout & Materials Notes\n## Key materials and fixtures\n## Notes for construction layout and coordination","[{\"question\":\"What site elements does the Materials Plan Sheet L-200 specify?\",\"answer\":\"Sheet L-200 lists pavement, curbs, curb ramps, topsoil and sod, grass seed, shrub beds with mulch, lighting standards, catchbasins, waste and recycling receptacles, bike racks, and electric vehicle charging stations, along with wood deck and bench references.\"},{\"question\":\"What coordination requirements are stated in the layout and materials notes?\",\"answer\":\"The notes require ensuring all existing services (old and recently installed) are clearly located onsite before construction, and coordinating any needed relocation or repairs by the contractor.\"},{\"question\":\"How should layout and staking be confirmed before installing hard surfaces?\",\"answer\":\"The notes state that layout must not be done prior to locating the new building, and that stakeout design must be confirmed with the contract administrator on site before hard surfaces are installed.\"}]","Materials Plan - Sheet L-200 | PDF"]