[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664070-105":59,"doc-detail-664070-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","marikina-city-engineering-department-requirements-for-securing-building-permit","Marikina City Engineering Department - Requirements for Securing Building Permit","","Marikina City Engineering Department provides a checklist of requirements for residential and commercial building permit applications. The document specifies the number of construction plan sets prepared, signed, and sealed by licensed professionals across architecture, civil/structural, sanitary, electrical, and mechanical disciplines, including location plans. It also lists technical documents such as construction specifications, bill of materials, structural computations with seismic analysis, and soil test analysis for three storeys and above, plus application forms and notarized permits. Applicant and owner documents cover title, tax declarations and receipts, locational clearance, construction clearances, contracts or consents, safety and health program approval from DOLE, and authorization letters, with additional corporation requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/marikina-city-engineering-department-requirements-for-securing-building-permit/664070/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/marikina-city-engineering-department-requirements-for-securing-building-permit/664070.png","ImageObject",300,407,{"name":92,"@type":93},"Cipher","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"How many sets of construction plans and location plans are required?","Question",{"text":112,"@type":113},"The checklist requires seven (7) sets of construction plans and seven (7) sets of location plans with vicinity map, each prepared, signed, and sealed by the relevant licensed professionals, including a geodetic engineer for location plans.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What technical documents must be submitted for structural and seismic review?",{"text":117,"@type":113},"Applicants must submit construction specifications, bill of materials, and three (3) copies of structural computation with seismic analysis. The document references the latest NSCP 2015 7th Edition code for the reference code.",{"name":119,"@type":110,"acceptedAnswer":120},"What owner or applicant documents are required if the applicant is not the registered owner?",{"text":121,"@type":113},"Required documents include a notarized contract of lease, affidavit of consent, deed of absolute sale, or extra-judicial settlement, depending on the ownership situation, along with authorization letters allowing representatives to process and receive the permit.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664070,1793238270,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},687208528416,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","CITY OF MARIKINA  \nMetropolitan Manila  \nENGINEERING DEPARTMENT  \nNAME OF OWNER/APPLICANT :   CONTACT NO./EMAIL ADD :    \nPROJECT LOCATION :   DATE/ TIME APPLIED :    \nPROJECT TITLE :   FOLLOW-UP DATE :    \nNEW :   RE-APPLIED :    \nFOR RESIDENTIAL AND COMMERCIAL  \nPLANS  \n1.Seven (7) Sets of Construction Plan prepared, signed and sealed by duly licensed:  \n a. Architect in case of architectural plans  \n b. Civil / Structural Engineeer in case of structural plans  \n c. Sanitary Engineer or Master Plumber in case of sanitary installation plans.  \n d. Professional Electrical Engineer in case of electrical plans  \n e. Professional Mechanical Engineer, in case of mechanical plans  \n f. Seven (7) Sets of Location Plan with vicinity map ( signed and sealed by Geodetic Engineer)  \nTECHNICAL DOCUMENTS  \n2.(To be prepared, signed and sealed by the Licensed Professional)  \n a. Five (5) copies of Construction Specification  \n b. Five (5) copies of Bill of Materials ( Signed And Sealed by Architect / Civil Engineer )  \n c. Three (3) copies of Structural Computation with Seismic Analysis w/ sign & seal of  \nCivil/Structural Engr. [Reference Code shall be the latest NSCP 2015 7th Edition]  \n d. Soil Test Analysis w/ Picture conducting a Boring Test & Photocopy of PRC ID & PTR of Civil Engineer  \n( FOR THREE (3) STOREYS AND ABOVE)  \n e. Construction Logbook for the Proposed Project  \nAPPLICATION FORMS  \n3. Duly accomplished Application Forms with signed and sealed by duly licensed professionals engineers/ architect:  \n a. Notarized Unified Form for Building Permit & Fire Safety Evaluation Clearance Form  \n b. Electrical Permit Application Form  \n c. Mechanical Permit Application Form  \n d. Sanitary Permit Application Form  \n e. Notarized Demolition Permit  \n f. Sign/Signage Permit  \n g. Photocopy/ies of PTR/ PRC ID of the Engineers/ Architect who signed and sealed the plans and forms.  \n h. Mayor’s Permit or Business Permit (in Marikina City) of the contractor / the Engineer or Architect In – charge of the Construction (maybe secured from the Business Permit and Licensing Office of Marikina City)  \n4. APPLICANT/S OR OWNER/S DOCUMENTS TO BE SUBMITTED  \n a. Certified True Copy of Transfer Certificate of Title (TCT) - (Registry of Deeds J.P. Rizal St., Concepcion 1, Marikina City)  \n b. Photocopy/ies of Tax Declaration of Real Property/ies (Land & Building) - (Assessor’s Office – Ground Floor, Marikina City Hall)  \n c. Photocopy/ies of Tax Receipt of Real Property/ies for the current year (Amillar)  \n d. Application form for Locational Clearance–(City Planning Office 2nd Floor Marikina City Hall)  \n e. Construction Clearance from the Developer ( if needed )  \n f. Notarized Contract of Lease / Affidavit of Consent / Deed of Absolute Sale/ Extra-Judicial Settlement  \n(if the applicant is not the registered property owner).  \n g. Certificate of Approval for a Construction Safety & Health Program from DOLE.  \n h. Notarized Authorization letter from owner / applicant allowing their representative to submit the application for processing & evaluation or to receive the approved permit on their behalf and submit photocopy of ID of owner for verification  \n5. FOR CORPORATIONS:  \n a. Submit Notarized Secretary’s Certificate with Board Resolution allowing the representative to sign/secure a permit in behalf of the company or register the same under his/her name  \n b. Security Exchange Commision Articles of Incorporation or DTI (1 set-photo copy ) LESSOR & LESSEE if applicable Note: Other documents may be required to be submitted if necessary.  \nSubmitted by: Received by: Checked by:  \nSIGNATURE OVER PRINTED NAME DOLORES GRACIA ENGR. RICKY BANGAWAN  \nCITY OF MARIKINA  \nMetropolitan Manila  \nENGINEERING DEPARTMENT  \nNAME OF OWNER/APPLICANT :   CONTACT NO./EMAIL ADD :    \nPROJECT LOCATION :   DATE/ TIME APPLIED :    \nPROJECT TITLE : _____________________________ FOLLOW-UP DATE : ___________________________  \nNEW : _____________________________ RE-APPLIED : __","cbCaipc1MzdpvGer","https://ap.wps.com/l/cbCaipc1MzdpvGer","pdf",128367,"English","# Requirements for Securing Building Permit\n## Construction Plans and Technical Documents\n## Application Forms and Owner/Applicant Documents","[{\"question\":\"How many sets of construction plans and location plans are required?\",\"answer\":\"The checklist requires seven (7) sets of construction plans and seven (7) sets of location plans with vicinity map, each prepared, signed, and sealed by the relevant licensed professionals, including a geodetic engineer for location plans.\"},{\"question\":\"What technical documents must be submitted for structural and seismic review?\",\"answer\":\"Applicants must submit construction specifications, bill of materials, and three (3) copies of structural computation with seismic analysis. The document references the latest NSCP 2015 7th Edition code for the reference code.\"},{\"question\":\"What owner or applicant documents are required if the applicant is not the registered owner?\",\"answer\":\"Required documents include a notarized contract of lease, affidavit of consent, deed of absolute sale, or extra-judicial settlement, depending on the ownership situation, along with authorization letters allowing representatives to process and receive the permit.\"}]","Marikina City Engineering Department - Requirements for Securing Building Permit | PDF"]