[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-657236-105":59,"doc-detail-657236-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","management-of-change-process-flow-chart","Management of Change - Process Flow Chart","","This document outlines a comprehensive process flow chart for Management of Change (MOC) in a professional or industrial setting. It details the systematic steps required to implement organizational or procedural changes safely and effectively. Key phases include determining risk assessment levels, conducting thorough risk analyses, managing process safety information, identifying document update requirements, and assigning tasks for risk mitigation and competency training. The process emphasizes the necessity of stakeholder communication, Pre-Startup Safety Reviews (PSSR), and formal management authorization. Furthermore, it establishes strict guidelines for temporary changes, stipulating a maximum three-month timeline and requiring full reviews for any necessary extensions to ensure long-term operational safety and compliance. This structured framework serves as a vital tool for ensuring that all changes are vetted, authorized, and communicated to prevent operational hazards and maintain rigorous safety standards throughout the implementation phase.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/management-of-change-process-flow-chart/657236/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/management-of-change-process-flow-chart/657236.png","ImageObject",300,407,{"name":92,"@type":93},"Well Done","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-26",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the required procedure for temporary changes?","Question",{"text":112,"@type":113},"Temporary changes are limited to a maximum timeline of 3 months. If a change needs to exceed this duration, a full review and evaluation for a timeframe extension are mandatory.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What components must the MOC owner confirm before implementation?",{"text":117,"@type":113},"The MOC owner must verify the completion of the risk assessment, relevant procedures, necessary training, and the Pre-Start Review Checklist with the respective task owners.",{"name":119,"@type":110,"acceptedAnswer":120},"What is the primary purpose of the Pre-Startup Safety Review (PSSR)?",{"text":121,"@type":113},"The PSSR serves as a final verification step to ensure all identified safety actions have been completed and that the environment is operationally ready for the proposed change.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},657236,1792976049,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},5909892210082,"https://ap-avatar.wpscdn.com/avatar/56001069da27c9f41e8?x-image-process=image/resize,m_fixed,w_180,h_180&k=1789614185077863061","MANAGEMENT OF CHANGE-PROCESS FLOW CHART  \n• Determination of level of Risk Assessment (Initial / Thorough)  \n• Conduct Risk Assessment (level vary as per change criticality)  \n• Determination of process hazards & process safety information  \n• Identify the need of updating documents / drawing / P&IDs  \n• Development of procedural & engineering details (if required)  \n• Assignment of tasks to task owners related to:  \no Mitigation of all risk assessment findings/ recommendations  \no Identification of stakeholders and other parties  \no Identification of training and competency requirements  \no Final checks, operational readiness or formal pre startup safety review (PSSR)  \no Obtain Management approval to implement change requirements etc.  \nMOC review Team formation based on MOC owner’s recommendation  \nChange Assessment by MOC review team  \n• Deliver identified trainings & address required competency to perform the task as per change assessment outcome  \n• Establish the mode of communication  \n• Communicate all stakeholders about the change  \nPre Start up safety Review for final checks  \nDelivery of any identified action and Communication Plan  \nAuthorization to implement the change?  \nNo  \n• MOC Owner confirm from Task Owner(s) about completion of:  \no Risk Assessment  \no Procedures  \no Training  \no Pre-Start Review Checklist  \no etc.  \nYes  \n• By Management Representative  \n• Temporary change shall have defined timeline i.e., no greater than 3 months.  \n• Full review required if moving beyond defined timelines.  \n• Review for the extension of timeframe","cbCaifrL9Q0v8ZqE","https://ap.wps.com/l/cbCaifrL9Q0v8ZqE","pdf",303732,"English","# MOC Process Foundation\n## Risk Assessment and Hazards\n# Task Assignment and Execution\n## Training and Communication\n# Review and Authorization\n## Temporary Change Management","[{\"question\":\"What is the required procedure for temporary changes?\",\"answer\":\"Temporary changes are limited to a maximum timeline of 3 months. If a change needs to exceed this duration, a full review and evaluation for a timeframe extension are mandatory.\"},{\"question\":\"What components must the MOC owner confirm before implementation?\",\"answer\":\"The MOC owner must verify the completion of the risk assessment, relevant procedures, necessary training, and the Pre-Start Review Checklist with the respective task owners.\"},{\"question\":\"What is the primary purpose of the Pre-Startup Safety Review (PSSR)?\",\"answer\":\"The PSSR serves as a final verification step to ensure all identified safety actions have been completed and that the environment is operationally ready for the proposed change.\"}]","Management of Change - Process Flow Chart | PDF"]