[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-665039-105":59,"doc-detail-665039-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","maintenance-and-warehouse-building-general-project-notes","Maintenance and Warehouse Building - General Project Notes","","Maintenance and warehouse building project documents for Calaveras County Water District in San Andreas, CA, specifying key project data and code compliance requirements. Includes general construction instructions covering inspection and verification of affected items, responsibility for labor, materials, and equipment, coordination with owners and vendors, and contractor responsibility for dimensions and quality control. Provides plan sheet organization, deferred submittal procedures and approval workflow with local building department review, plus initial drainage profile and inlet/detail notes for site work execution.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/maintenance-and-warehouse-building-general-project-notes/665039/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/maintenance-and-warehouse-building-general-project-notes/665039.png","ImageObject",300,407,{"name":92,"@type":93},"aboduw","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What code requirements does the project document reference?","Question",{"text":111,"@type":112},"The document states the project must comply with Title 24, parts 1 through 12, including the latest edition of the California Building Code, California Plumbing Code, California Mechanical Code, California Electrical Code, Fire Code, and all local ordinances.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What are the general responsibilities of the contractor before and during construction?",{"text":116,"@type":112},"The contractor must inspect and verify affected item locations, provide all labor/materials/equipment needed for proper execution, coordinate with owner vendors before drywall installation, check job dimensions, and handle discrepancies between actual work and approved drawings.",{"name":118,"@type":109,"acceptedAnswer":119},"How are deferred submittal documents supposed to be handled and approved?",{"text":120,"@type":112},"Deferred submittal items must be submitted to the C.C.W.D. District Engineer for review and forwarding to the Calaveras County Building Department. Items cannot be installed until design and submitted documents are approved, with the review confirmation noted for plan check compliance.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},665039,1793286690,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":26},3985747862266,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","# GENERAL PROJECT NOTES\n\nPROJECT DATAMAINTENANCE AND WAREHOUSE BUILDINGAPN:044-032-024CONSTRUCTION TYPE:TYPE VASTORIES:ONEOCCUPANCY:S1/S2SPRINKLERS:NOBUILDING AREA:9,600 SQ.FT.PARKING REQUIRED:9,600/250 =39(12 STRIPED)BUILDING CODE INFORMATIONTHIS PROJECT SHALL COMPLY WITH THEREQUIREMENTS OF TITLE 24 PARTS 1THROUGH 12 INCLUDING THE LATESTEDITION OF THE CALIFORNIA BUILDING CODE,CALIFORNIA PLUMBING CODE,CALIFORNIAMECHANICAL CODE,CALIFORNIA ELECTRICALCODE,FIRE CODE AND ALL LOCALORDINANCES.CONTACTSCALAVERAS COUNTY WATER DISTRICT120 TOMA COURTPO BOX 846SAN ANDREAS,CAPHONE:(209)754-3543FAX:(209)754-1069  \n1.BEFORE BEGINNING WORK AT THE SITE,WHERE POSSIBLE ANDTHROUGHTOUT THE COURSE OF THE WORK,INSPECT AND VERIFYTHE LOCATION OF EVERY ITEM AFFECTED BY THE WORK UNDER THISCONTRACT AND REPORT DISCREPANCIES TO CCWD PROJECTMANAGEMENT BEFORE DOING WORK RELATED.  \n2.WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR OTHERWISEINDICTATED AS EXISITING  \n3.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING LABOR,MATERIALS AND EQUIPMENT NECESSARY FOR THE PROPEREXECUTION AND COMPLETION OF THE WORK.  \n4.THE OWNER TO REVIEW AND APPROVE ALL ELECTRICAL POWERSITES,PHONES AND SECURITY SYSTEMS PRIOR TO INSTALLATION OFDRYWALL  \n5.CONTRACTOR TO COORDINATE WITH OWNERS VENDORS SUCH ASPHONE,COMMUNICATIONS AND SECURITY SYSTEMS PRIOR TOINSTALLATION OF DRYWALL.  \n6.THE CONTRACTOR TO CHECK ALL DIMENSIONS AT THE JOB ANDSHALL BE RESPONSIBLE FOR ALL DISCREPACNCIES BETWEEN THEDIMENSIONS OF THE ACTUAL WORK AND THOSE SHOWN IN THEDOCUMENTS OR APPROVED DRAWINGS.  \n7.IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ASSUME ALLTHE SYSTEMS AND SUB-SYSTEMS DESCRIBED IN THE DRAWINGSCOMPLY WITH APPLICABLE CODES AND ARE COMPLETE ANDFINISHED PRODUCT.  \n8.THESE PLANS ARE FOR GENERAL CONSTRUCTION PURPOSES ONLY.THEY ARE NOT EXHAUSTIVELY DETAILED NOR FULLY SPECIFIED.IT ISTHE RESPONSIBILITY OF THE CONTRACTOR TO SELECT,VERIFY,RESOLVE AND INSTALL ALL MATERIALS AND EQUIPMENT REQUIREDFOR COMPLETION OF WORK.  \n9.THE CONTRACTOR IS RESPONSIBLE FOR QUALITY CONTROLANDCONSTRUCTION STANDARDS FOR THIS PROJECT.ALL QUESTIONSAND CLARIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OFcCWD CONSTRUCTION MANAGEMENT.  \n# NEW MA/NTENANCE AND WAREHOUSE PROJEC7FOR\n\nCALAVERAS COUNTY WATER DISTRICTSAN ANDREAS,  CA  \n\n| VICINITY MAP  \u003Cbr>HIGHWAY CA  \u003Cbr>00  \u003Cbr>9  \u003Cbr>GEORGE REED DR  \u003Cbr>PROJECT  \u003Cbr>LOCATION  \u003Cbr>303 GEORGE REED DR  \u003Cbr>SAN ANDREAS,CA 95249   |  |\n| --- | --- |\n|  |  |\n|  | DRAWING NUMBER  \u003Cbr>CS-1   |\n|  | SHEET NUMBER  \u003Cbr>1 OF 23   |\n|  | FLENAME   |\n|  | CCWDFLENO   |\n\nPLAN SHEETSMAINTENANCE AND WAREHOUSE BUILDINGCOVER SHEETSITE PLANS-1CIVIL SHEETSDRAINAGE PLANDRAINAGE PROFILEGRADING PLANUTILITY PLANSIDEWALK/ADA DETAILSSITEWORK DETAILSARCHITECTURAL SHEETSFLOOR PLANA-1EXTERIOR ELEVATION(NORTH)    A-2EXTERIOR ELEVATION(SOUTH)    A-3EXTERIOR ELEVATION(EAST)A-4EXTERIOR ELEVATION(WEST)A-5GEN.FRAMING NOTES`&DETAILS A-6INTERIOR SCHEDULEA-7BUILDING SLAB DETAILSA-8STRUCTURAL SHEETSPRELIMINARY STRUCTURAL PLAN S-1PLUMBING SHEETSPLUMBING NOTES/DETAILSP-1PLUMBING FLOOR PLANP-2RESTROOM DETAILSP-3MECHANICAL SHEETSHVAC FLOOR PLANM-1ELECTRICAL SHEETSELECTRICAL AND LIGHTING NOTESE-1LIGHTING FLOOR PLANELECTRICAL FLOOR PLANE二3  \nDEFERRED SUMBITTALSSUBMITTAL DOCUMENTS FOR DEFFERED SUMBITTALITEMS SHALL BE SUBMITTED TO C.C.W.D.DISTRICTENGINEER WHO WLL REVIEW THEM AND FORWARD THEMTO CALAVERAS COUNTY BUILDING DEPARTMENT FORPLAN CHECH WITH A NOTATION INDICATING THAT THEDEFFERED SUBMITTAL DOCUMENTS HAVE BEENREVEWED AND FOUND TO BE IN GENERALCOMFORMANCE WITH THE CONTRACT.THE DEFFEREDSUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTILTHEIR DESIGN AND SUBMITTED DOCUMENTS HAVE BEENAPPROVED BY CALAVERAS COUNTY BUILDINGDEPARTMENT.  \n4C-2C-3C-5  \n1.STEEL BUILDING ENGINEERED DESIGN(CONTRACTOR)  \n2.BUILDING FOUNDATION ENGINEERED DESIGN(CONTRACTOR)  \n3.FLOOR SLAB CONTROL JOINT PLAN(CONTRACTOR)  \n4.TITLE 24 ENERGY COMPLIANCE(CONTRACTOR)  \n5.TITLE 24 LIGHTING COMPLIANCE DOCUMENTS(CONTRACTOR)  \n6.EROSION CONTROL PLANS(CONTRACTOR)  \n7.HVAC EQUIPMENT","cbCaihVyZIQIKtEQ","https://ap.wps.com/l/cbCaihVyZIQIKtEQ","pdf",5396802,24,"English","# GENERAL PROJECT NOTES\n## Project Information and Code Compliance\n## General Conditions and Responsibilities\n## Plan Sheets Overview\n## Deferred Submittals\n## Drainage Profiles\n## Drainage Inlet Extension Detail","[{\"question\":\"What code requirements does the project document reference?\",\"answer\":\"The document states the project must comply with Title 24, parts 1 through 12, including the latest edition of the California Building Code, California Plumbing Code, California Mechanical Code, California Electrical Code, Fire Code, and all local ordinances.\"},{\"question\":\"What are the general responsibilities of the contractor before and during construction?\",\"answer\":\"The contractor must inspect and verify affected item locations, provide all labor/materials/equipment needed for proper execution, coordinate with owner vendors before drywall installation, check job dimensions, and handle discrepancies between actual work and approved drawings.\"},{\"question\":\"How are deferred submittal documents supposed to be handled and approved?\",\"answer\":\"Deferred submittal items must be submitted to the C.C.W.D. District Engineer for review and forwarding to the Calaveras County Building Department. Items cannot be installed until design and submitted documents are approved, with the review confirmation noted for plan check compliance.\"}]","Maintenance and Warehouse Building - General Project Notes | PDF"]