[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663458-105":59,"doc-detail-663458-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","lula-elevator-shop-drawings-provisions-by-other-contractors-technical-data","LULA ELEVATOR SHOP DRAWINGS - Provisions by Other Contractors - Technical Data","","Elevator shop drawings for a new installation of the LULA Elevator include contractor provisions and compliance requirements covering hoistway and machine-room construction, venting and fire ratings, plumbing and steel/EMT conduit restrictions, barricades, machine-room location, door and clearance dimensions, and environmental controls for temperature and humidity to prevent condensation. The package also specifies lighting, feeder disconnect circuitry, guide-rail support reinforcement, required concrete works, entrance framing support conditions, emergency recall smoke detection, and emergency/standby power dry-contact wiring, plus hydraulic system and electrical technical data.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/lula-elevator-shop-drawings-provisions-by-other-contractors-technical-data/663458/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/lula-elevator-shop-drawings-provisions-by-other-contractors-technical-data/663458.png","ImageObject",300,407,{"name":92,"@type":93},"xXChrisXx","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What core provisions must be supplied by the owner or owner’s agent?","Question",{"text":112,"@type":113},"Hoistway and machine room work must comply with elevator, safety, and building codes; hoistway venting and fire rating must meet local code requirements; hoistway plumbing and specific beveling rules for ledges must be followed. Additional items include removable barricades outside the hoistway and the required machine-room location and door/clearance standards.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What machine-room environmental and lighting requirements are specified?",{"text":117,"@type":113},"Heating and cooling must be thermostatically controlled to maintain the machine-room temperature range of 10°C to 32°C, with humidity control to ensure no condensation. The drawings specify 120V light fixtures, switches, and GFI convenience outlets in each pit and machine room, along with minimum lighting levels and pit lighting with guards.",{"name":119,"@type":110,"acceptedAnswer":120},"How is emergency power and emergency recall operation handled?",{"text":121,"@type":113},"For phase I emergency recall, smoke detectors are required in the elevator lobby at the designated level when that area is not sprinklered, and a smoke detector is required in the machine room when it is sprinklered. For emergency or standby power, normally open dry contacts must be provided from the emergency power transfer switch and wired to close the elevator controller circuit under emergency/standby conditions.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663458,1793228297,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},8796112263567,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| LULA ELEVATOR SHOP DRAWINGS   |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| PROVISIONS BY OTHER CONTRACTORS  \u003Cbr>IMPORTANT  \u003Cbr>-THE FOLLOWING SHOULD BE SUPPLIED BY THE OWNER OR HIS AGENT  \u003Cbr>1.HOISTWAY AND MACHINE ROOM IN ACCORDANCE WITH ELEVATOR,SAFETY AND BUILDING CODES.  \u003Cbr>2.HOISTWAY VENTING AND FIRE RATING ACCORDING TO LOCAL CODE REQUIREMENTS.  \u003Cbr>3.PLUMB HOISTWAY WITH_VARIATIONS NOT TO EXCEED 25mm ALL LEDGES OVER 100mm TO BE  \u003Cbr>BEVELLED 75'TO THE HORIZONTAL.  \u003Cbr>4.NECESSARY REMOVABLE BARRICADES OUTSIDE OF HOISTWAY.  \u003Cbr>5.NoO_CONDUIT,WRING,OR PIPING OTHER THAN THAT PERTAINING TO ELEVATOR(S)IS PERMITTED  \u003Cbr>IN THE HOISTWAY OR MACHINE ROOM.  \u003Cbr>6.MACHINE ROOM TO BE LOCATED AT THE LOWEST LANDING  \u003Cbr>ADJACENT TO THE HOISTWAY,UNLESS OTHERWISE SHOWN.  \u003Cbr>7.PROVIDE A SELF-CLOSING,SELF-LATCHING,FIRE RATED MACHINE_ROOM DOOR MINIMUM  \u003Cbr>2030mm HIGH.MINIMUM MACHINE ROOM HEIGHT TO BE 2286mm CLEAR BELOW ALL EQUIPMENT.  \u003Cbr>8.HEATING AND_COOLING THERMOSTATICALLY CONTROLLED TO MAINTAIN MACHINE ROOM  \u003Cbr>TEMPERATURE OF 10℃ TO 32℃.RELATIVE HUMIDITY CONTROLLED TO ENSURE NO CONDENSATION.  \u003Cbr>9.120 VAC LIGHT FIXTURE(S),SWITCH AND GFI CONVENIENCE OUTLET IN EACH PIT AND MACHINE  \u003Cbr>ROOM,MINIMUM 200x LIGHTING LEVEL IN MACHINE ROOM._SWITCH TO BE ON THE LOCK JAMB SIDE  \u003Cbr>oF THE DOOR.MINIMUM 100 x LIGHTING LEVEL IN THE PIT.PIT LIGHT TO BE SUPPLIED WITH  \u003Cbr>GUARD.ALL CONDUIT IN MACHINE ROOM AND HOISTWAY TO BE EMT.  \u003Cbr>10.ELEVATOR FEEDERS INCLUDING LOCKABLE,FUSED DISCONNECT CIRCUIT BREAKERS WRED TO  \u003Cbr>OUR CONTROLLER.  \u003Cbr>11.ADEQUATE SUPPORT FOR GUIDE RAILFASTENING TO BE PROVIDED AT GUIDE RAIL BRACKET  \u003Cbr>LOCATIONS.SEE_DETAIL“D”,”E”AND\"G”.INSERTS SUPPLIED BY DELTA,INSTALLATION BY  \u003Cbr>CONTRACTORS.RAIL FORCE LOADS DOUBLED FOR SAFETY.  \u003Cbr>12.ALL BLOCKOUTS,UNDERPINNING,POCKETS,PATCHING,GROUTING AND CONCRETE WORK WHERE  \u003Cbr>REQUIRED.  \u003Cbr>13,ENTRANCE WALLS(ROUGH OPENINGS)TO_BE ERECTED AFTER_ENTRANCE FRAMES HAVE BEEN  \u003Cbr>INSTALLED.FINISH MASONRY AND GROUT IN SADDLES FULL LENGTH.  \u003Cbr>14.ENTRANCE_FRAMES ARE NOT DESIGNED TO SUPPORT OVERHEAD WALL LOADS.SUITABLE  \u003Cbr>SUPPORTS FOR THESE LOADS MUST BE PROVIDED.  \u003Cbr>17.N/A  \u003Cbr>16.N/A,  \u003Cbr>15.N/A,  \u003Cbr>18SLEEVES FOR OIL AND ELECTRIC DUCTS FROM MACHINE ROOM TO HOISTWAY AS REQUIRED.  \u003Cbr>19.CONTROLLER AND PUMPING UNIT PLACEMENT SUBJECT TO JOB CONDITIONS.  \u003Cbr>20.PIT WATERPROOFING,WHERE REQUIRED.  \u003Cbr>21.PIT DRAIN ALWAYS REQUIRED FOR ELEVATORS WITHFIREFIGHTER'S EMERGENCY OPERATION.  \u003Cbr>SUMP PUMP EXTERNAL TO THE SHAFT,WHERE REQUIRED.SUMP HOLE TO BEOUTSIDE HOISTWAY  \u003Cbr>AND_600mm DEEPER_THAN PIT,WITH TRAP &BACKWATER CHECK VALVE.DESIGN TO HANDLE  \u003Cbr>POSSIBLE OIL IN SUMP DISCHARGE.  \u003Cbr>22.PROVDE TELEPHONE CONNECTION EXCEPT FOR THE WRE FROM THE CONTROLLER IN THE  \u003Cbr>MACHINE ROOM TO ELEVATOR.  \u003Cbr>23.A CHEQUE FROM THE OWNER TO COVER THE FIRST YEAR's LICENSING FEE MUST BE SUPPLIED  \u003Cbr>AT THE TIME OF INSPECTION.  \u003Cbr>24.ELEVATORS WTH PHASE I EMERGENCY RECALL OPERATION_BY FIRE ALARM INITIATING_DEVICES  \u003Cbr>REQUIRE A_SMOKE DETECTOR INSTALLED IN THE ELEVATOR LOBBY AT THE DESIGNATED LEVEL,IF  \u003Cbr>THAT FLOOR_AREA IS_NOT_SPRINKLERED THROUGHOUT;AND A SMOKE_DETECTOR INSTALLED IN  \u003Cbr>THE MACHINE ROOM IF_THE_MACHINE ROOM IS SPRINKLERED.WRING TO CENTRAL ALARM CONTROL|  \u003Cbr>FACILITY(CACF)BY OTHERS.  \u003Cbr>25.WHERE AN EMERGENCY OR STANDBY POWER SYSTEM IS PROVDED TO OPERATE AN ELEVATOR  \u003Cbr>IN THE EVENT OF NORMAL POWER SUPPLY FAILURE,THEN A“NORMALLY OPEN”DRY CONTACT IS  \u003Cbr>TO BE PROVIDED FROM THE EMERGENCY POWER TRANSFER SWTCH AND WRED TO THE ELEVATOR  \u003Cbr>CONTROLLER,CAR 'A’,TO CLOSE WHEN EMERGENCY OR STANDBY POWER IS IN EFFECT.  \u003Cbr>26.N/A   |  | TECHNICAL DATA   |  |  |  |  |\n|  |  | GENERAL   | CAPACITY  \u003Cbr>635 kg  \u003Cbr>0.13 m/s  \u003Cbr>SPEED UP/DOWN  \u003Cbr>MAXIMUM 9000m  \u003Cbr>TRAVEL  \u003Cbr>MAXIMUM 7  \u003Cbr>LANDINGS  \u003Cbr>FRONT/REAR/  \u003Cbr>OPENINGS  \u003Cbr>SINGLE AUTOMATIC  \u003Cbr>OPERATION   |  |  |  |\n|  |  | MOTOR   | POWER SUPPLY  \u003Cbr>220V-1PH-60HZ|208V-3PH-60HZ  \u003Cbr>MOTOR CURRENT  \u003Cbr>15.2A  \u003C","cbCaigtg0hMylZrT","https://ap.wps.com/l/cbCaigtg0hMylZrT","pdf",553060,"English","# Provisions by Other Contractors\n## Technical Data\n## General Update","[{\"question\":\"What core provisions must be supplied by the owner or owner’s agent?\",\"answer\":\"Hoistway and machine room work must comply with elevator, safety, and building codes; hoistway venting and fire rating must meet local code requirements; hoistway plumbing and specific beveling rules for ledges must be followed. Additional items include removable barricades outside the hoistway and the required machine-room location and door/clearance standards.\"},{\"question\":\"What machine-room environmental and lighting requirements are specified?\",\"answer\":\"Heating and cooling must be thermostatically controlled to maintain the machine-room temperature range of 10°C to 32°C, with humidity control to ensure no condensation. The drawings specify 120V light fixtures, switches, and GFI convenience outlets in each pit and machine room, along with minimum lighting levels and pit lighting with guards.\"},{\"question\":\"How is emergency power and emergency recall operation handled?\",\"answer\":\"For phase I emergency recall, smoke detectors are required in the elevator lobby at the designated level when that area is not sprinklered, and a smoke detector is required in the machine room when it is sprinklered. For emergency or standby power, normally open dry contacts must be provided from the emergency power transfer switch and wired to close the elevator controller circuit under emergency/standby conditions.\"}]","LULA ELEVATOR SHOP DRAWINGS - Provisions by Other Contractors - Technical Data | PDF",13]