[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-142507-105":59,"doc-detail-142507-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","lucky-star-wind-energy-project","Lucky Star Wind Energy Project","","The Lucky Star Wind Energy Project is a proposed wind energy development spanning 78,292 acres across Carbon and Albany Counties, Wyoming, on two privately-owned ranches with interspersed federal and state parcels. Located near the towns of Rock River and Medicine Bow, the project aims for up to 500 megawatts (MW) of generation capacity using as many as 200 wind turbine generators, each a 2.5 MW model. Ancillary facilities will include a 34.5 kilovolt (kV) collection system, two maintenance and storage buildings, two substations, access roads, and a 230 kV overhead transmission line connecting to the proposed Aeolus substation. The project timeline estimates permitting and approvals from 2018-2020, construction from 2020-2022, and commercial operations beginning in Q4 2022. The estimated construction cost is $650 million, with projected local and state sales taxes of $27 million and an estimated project lifetime property tax of $48 million. The project is expected to create approximately 249 construction jobs and 14 operations and maintenance jobs. The site plan indicates 82 wind turbine generators (WTGs) on Medicine Bow River Ranch and 119 WTGs on Lookout Ranch, with two project substations and 230kV transmission lines, linking to the Aeolus substation for interconnection.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/lucky-star-wind-energy-project/142507/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/lucky-star-wind-energy-project/142507.png","ImageObject",300,407,{"name":92,"@type":93},"Xiajie","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-05","2026-08-25",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",16,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What is the proposed generation capacity of the Lucky Star Wind Energy Project?","Question",{"text":113,"@type":114},"The project proposes up to 500 megawatts (MW) of generation capacity.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What are the key components of the Lucky Star Wind Energy Project?",{"text":118,"@type":114},"The project includes up to 200 wind turbine generators, a 34.5 kV collection system, two maintenance and storage buildings, two substations, access roads, and a 230 kV overhead transmission line.",{"name":120,"@type":111,"acceptedAnswer":121},"When is the Lucky Star Wind Energy Project expected to begin commercial operations?",{"text":122,"@type":114},"Commercial operations are estimated to begin in the fourth quarter of 2022.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},142507,1787682555,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":130,"read_time":144,"preview_page_count":4},8814010472675,"https://avatar.qwps.com/avatar/WGlhamll","Lucky Star Wind Energy Project  \nCarbon &Albany Counties,Wyoming  \nSeptember 10,2018  \nLucky Star Wind Energy Project  \n# Project Location\n\n·78,292 acres  \n●Two privately-owned ranches -MedicineBow River Ranch and Lookout Ranch -withinterspersed federal and state parcels  \n·Unincorporated Albany and CarbonCounties  \n·Near the Towns of Rock River and MedicineBow  \n·Accessed via Highway 30  \n# Lucky Star Wind Energy Project\n\nProposed Wind Energy Development  \n·Up to 500 megawatts(MW)of generationcapacity  \n·Up to 200 wind turbine generators with a  \n2.5 MW model  \n·Ancillary facilities include:  \n·A 34.5 kilovolt(kV)collection system  \n●Two maintenance and storagebuildings  \n·Two substations  \n·Access roads  \n·A230 kV overhead transmission lineconnecting to the proposed Aeolussubstation  \n# Lucky Star Wind Energy Project\n\nProject Development Summary  \nPermitting and Approvals:2018-2020  \nConstruction:  \n2020-2022  \nCommercial Operations:  \nQ42022  \nEstimated Cost of Construction:  \n$650 million  \nEstimated Local &State Sales Taxes:  \n:    $27 million  \nEstimated Project Lifetime Property Tax:$48 million  \nEstimated Average No.of Jobs:249 construction  \n14 operations and maintenance  \n# Lucky Star Wind Energy Project\n\nSite Plan  \n·82 WTG currently shown on Medicine BowRiver Ranch  \n·119WTG currently shown on LookoutRanch  \n·2×Project substations  \n·230kV transmission lines  \n·Point-of-Interconnection at new Aeolussubstation  \n·Project Electrical Collector System androads (not shown)","cbCaiqhKUVt9bvZG","https://ap.wps.com/l/cbCaiqhKUVt9bvZG","pdf",324501,"English","# Project Location\n# Lucky Star Wind Energy Project\n# Project Development Summary","[{\"question\":\"What is the proposed generation capacity of the Lucky Star Wind Energy Project?\",\"answer\":\"The project proposes up to 500 megawatts (MW) of generation capacity.\"},{\"question\":\"What are the key components of the Lucky Star Wind Energy Project?\",\"answer\":\"The project includes up to 200 wind turbine generators, a 34.5 kV collection system, two maintenance and storage buildings, two substations, access roads, and a 230 kV overhead transmission line.\"},{\"question\":\"When is the Lucky Star Wind Energy Project expected to begin commercial operations?\",\"answer\":\"Commercial operations are estimated to begin in the fourth quarter of 2022.\"}]","Lucky Star Wind Energy Project | PDF",13]