[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650846-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-650846-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","lucinda-extension-campus-general-notes-and-specificans-solar-harvesting-system","LUCINDA EXTENSION CAMPUS - GENERAL NOTES AND SPECIFICANS - Solar Harvesting System","","Installation drawings for a solar harvesting system at Lucinda Extension Campus (Student Center and CFTR Building). The document provides project/site mapping references, general notes for electrical work compliance, supervision and approval requirements, service voltage and conductor specifications, conduit sealing, panel fabrication and enclosure standards, bonding and grounding practices, allowable connection methods, spacing for supports, required pull/junction boxes, and required electrical testing procedures including installation resistance, ground resistance, operational, and system acceptance tests. It also includes a single-line diagram and load schedules with cable, breaker, and conduit sizing details.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/lucinda-extension-campus-general-notes-and-specificans-solar-harvesting-system/650846/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/lucinda-extension-campus-general-notes-and-specificans-solar-harvesting-system/650846.png","ImageObject",300,407,{"name":42,"@type":43},"Mabel","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What standards and compliance requirements are stated for the electrical installation?","Question",{"text":62,"@type":63},"All work must comply with the approved edition of the latest Philippine Electrical Code and with rules and regulations of the relevant national and local authorities involved in enforcement. Materials must follow approved standards and be secured for approval by the design engineer or project manager.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What electrical specifications are required for the system conductors and wiring?",{"text":67,"@type":63},"Service voltage is specified as 230 volts, 3-phase, 60Hz AC. Wires must be copper with 99.9% conductivity, soft-drawn and annealed, and color-coded according to the provided DC+ and DC- line and grounding scheme.",{"name":69,"@type":60,"acceptedAnswer":70},"Which tests must be performed upon completion of electrical construction?",{"text":71,"@type":63},"The contractor must perform installation resistance test and ground resistance test, followed by operational test and system test and acceptance, with detailed reporting on forms approved by the owner's representative.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},650846,1792890286,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},7971474920318,"https://ap-avatar.wpscdn.com/avatar/74000ee537e6b0ca360?x-image-process=image/resize,m_fixed,w_180,h_180&k=1788430171632181674","THE SITE  \nVICINITY MAP  \nNTS  \nSCALE:  \n\n|  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | TARLAC STATE UNIVERSITY  \u003Cbr>MailitgemDenvelopment and  \u003Cbr>Romulo Boulevard,Tarlat City.Philppines 2300   | PROJECTITLE:   | REQUESTIMe OFIC   |  | PREPAREDBY:   | CHECKEDBY:   | CERTIFIED BY:   |  |  | SHEETCONTENTS:   | SHEETNO:   |\n|  |  | INSTALLATION OF SOLAR HARVESTING SYSTEMAT LUCINDA  \u003Cbr>EXTENSION CAMPUS(STUDENT CENTER AND CFTR BUILDING)   |  | Lb C.BENITEZ  \u003Cbr>OR,OSAS   | ENGR:MISAEL REIGH MIELV.CABANSAG  \u003Cbr>ELECTHICALENGINER,OFDM  \u003Cbr>C   | AR.CHERRYL.FABIANES  \u003Cbr>HEAD,OFDM-PDU  \u003Cbr>二   | DIRECTOR,DFDM  \u003Cbr>机飞   |  |  | AS SHOWN   | 1   |\n|  |  |  | PROF.GHERO  \u003Cbr>DRECT   |  |  |  |  |  |  |  |  |\n|  |  | PROJECTLOCATON:   |  |  |  |  |  |  |  |  | PAGE NO:   |\n|  |  | TSULUCINDA EXTENSION CAMPUS   |  |  |  |  |  |  |  |  | 01/14   |\n|  |  |  |  |  |  |  |  |  |  | DATE:OCTOBER 2024   |  |\n\nSTUDENT  \nCENTER  \nBUILDING  \n# LUCINDA EXTENSION CAMPUS\n\nNTS  \n# GENERAL NOTESANDSPECIFICANS\n\n1.ALL WORKS SHALL COMPLY WITH THE APPROVED EDITION OF THE LATESTPHILIPPINE ELECTRICAL CODE,WITH THE RULES AND REGULATIONS OF THENATIONAL AND LOCALAUTHORITY CONCERNED INTHE ENFORCEMENT OF THEUTIL/TY COMPANY CONCERNED  \n2.ALLELECTRICALWORKS HEREIN SHALBE DONE UNDERTHE DIRECTSUPERVISION OF A DULY QUALIFIED REGISTERED ELECTRICAL ENGINEER ORREGISTERED MASTER ELECTRICIAN.  \n3.SERVICE VOLTAGE SHALL BE 230VOLTS,3-PHASE,60Hz.A.C.  \n4.ALL MATERIALS PRIOR TO INSTALLATION,FABRICATION OR ORDER CONTRACTORSHALL SECURE APPROVAL FROM DESIGN ENGINEER OR PROJECT MANAGERBASED ON MATERIAL STANDARD SPECIFICATION.ALL MATERIALS SHALL BE BRANDNEWAND DELIVERED TO SITE WITH THEIR ORIGINAL PACKAGING  \n5.ALLWIRES SHALL BE COPPER WITH 99.9%CONDUCTIVITY,SOFT-DRAWNANDANNEALED.  \n6.ALL WIRES SHALL BE COLOR CODED AS FOLLOWS:DC+REDLINE2YELLOWDC-BLACKLINE3BLUELINE1REDGROUNDGREEN  \n7.CONDUIT SHALL BE PROPERLY SEALED TO AVOID ENTRY OF FOREIGN OBJECTDUST,MOISTURE,WATER ETC  \n8.PANELS SHALL BE FABRICATED BY A REPUTABLE FABRICATOR.ONLY ONE BRANDOF CIRCUIT BREAKER WILL BE ALLOWEDFOR THEENTIRE PROJECT.USINGMULTIPLE OR COMBINATION OF BRAND WILL BE REJECTED  \n9.STANDARD ENCLOSURE AND MOUNTING FOR PANELS AND CABINETAS PER LOADSCHEDULE.FOR INDOOR PANEL SHALL BE NEMA-1 ENCLOSURE AND FOROUTDOORIT SHOULD BE NEMA-4XOR AS INDICATED ON THE PLANS.AND IT SHALLMEET NEMA AND UL SPECIFICATIONS.  \n10.ALL NON-CURRENT CARRYING METALLIC PARTS OR FRAMES OF ELECTRICALEQUIPMENT SHALL BE ELECTRICALLY CONNECTED TO FEEDER/CIRCUIT GROUNDWIRE WITH SUITABLE TERMINAL LUGS.  \n11.ALL CONNECTIONS FOR MAIN CIRCUIT BREAKER TO BRANCHES SHALL BE SOLIDCOPPER BUS BAR,WIRE JUMPERS ARE NOT ALLOWED  \n12.1.5METER SHOULD BE THE SPACING FROM ONE CONDUIT SUPPORT TOANOTHERSUPPORT BY MEANS OF C-CHANNEL CLAMPS OR BY U-BOLT.  \n13.WHENEVER REQUIREDAND NECESSARYPVC PULL BOXES AND JUNCTION BOXESSHALL BE INSTALLED AT CONVENIENT SPACE AND LOCATION.  \n14.UPON COMPLETION OFELECTRICAL CONSTRUCTION WORK,THE FOLLOWINGTESTS SHALL BE PERFORMED BY THE CONTRACTOR INCLUSIVE OF THEINSTALLATION TO BE REPORTED IN DETAILS ON FORMS APPROVED BY THEOWNER'S REPRESENTATIVE.  \nA.INSTALLATION RESISTANCE TEST B.GROUND RESISTANCE TEST  \nC.OPERATIONAL TESTD.SYSTEM TEST AND ACCEPTANCE  \n## SINGLE LINE DIAGRAM\n\n3-22.0mm²THHN wire  \n3-80 mm²THHN wire  \n4mm DC cable一  \n1-22 mm²THHN(G)wire  \n1-8.0mm²THHN(G)wire  \n20kW  \n□…  \nUNITIZED PANELBOARD  \n4mm DC cable-  \n□…L  \n□2  \nREC  \nPV SYSTEM  \nSP  \nMETER  \n4mm DC cabe-  \nDISCONNECT  \n80 AT,3P  \nTAPPING PT.  \nM  \nDEVICE  \n230V,3P,60Hz  \n□…  \ng  \nSPD  \n175 AT,3P  \n4mm DC cable-  \n175AT,3P  \n--  \nPg  \nG  \n80 AT,3P  \n-1-3.5mm²(G)wire  \nG  \n4mm DC cable一  \n20kW  \n□,  \nsPe  \n1-22mm²(G)wire-  \n1-22mm²(G)wire-  \ng  \n4mm DC cable-  \n□…L  \nrg  \n4mm DC cable  \ng  \n1-3.5mm²(G)wire  \n## LOAD SCHEDULE\n\nDC SCHEDULE OF LOADS  \n\n| STRING   | NO.OF MODULES PER STRING   | TOTALVOLTAGE (V)   | CURRENT (A)   | CB RATING   | WRE SIZE   | CONDUIT   |\n| --- | --- | --- | --- ","cbCainuXnrMVang8","https://ap.wps.com/l/cbCainuXnrMVang8","pdf",29174355,14,"English","# GENERAL NOTES AND SPECIFICANS\n## SINGLE LINE DIAGRAM\n## LOAD SCHEDULE","[{\"question\":\"What standards and compliance requirements are stated for the electrical installation?\",\"answer\":\"All work must comply with the approved edition of the latest Philippine Electrical Code and with rules and regulations of the relevant national and local authorities involved in enforcement. Materials must follow approved standards and be secured for approval by the design engineer or project manager.\"},{\"question\":\"What electrical specifications are required for the system conductors and wiring?\",\"answer\":\"Service voltage is specified as 230 volts, 3-phase, 60Hz AC. Wires must be copper with 99.9% conductivity, soft-drawn and annealed, and color-coded according to the provided DC+ and DC- line and grounding scheme.\"},{\"question\":\"Which tests must be performed upon completion of electrical construction?\",\"answer\":\"The contractor must perform installation resistance test and ground resistance test, followed by operational test and system test and acceptance, with detailed reporting on forms approved by the owner's representative.\"}]","LUCINDA EXTENSION CAMPUS - GENERAL NOTES AND SPECIFICANS - Solar Harvesting System | PDF",1792848169,35]