[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-202203-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-202203-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","luc-2015911641-1959-specifications-ohio-department-of-highways","LUC-20(15.91)(16.41) 1959 SPECIFICATIONS - Ohio Department of Highways","","1959 specifications governing an Ohio Department of Highways improvement, including change and supplementary specifications referenced in the proposal. The document outlines conventional signing and traffic control concepts and defines work sequencing such as Begin Work, Suspend Work, and Resume Work, including right-of-way and boundary station limits. It includes plans and profiles, cross sections, location plan data, line data, and supplemental specifications with listed dates, drawing references, and construction data for the stated project limits.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/luc-2015911641-1959-specifications-ohio-department-of-highways/202203/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/luc-2015911641-1959-specifications-ohio-department-of-highways/202203.png","ImageObject",300,407,{"name":42,"@type":43},"Ezra","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-04","2026-09-04",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",10,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What document governs the highway improvement work?","Question",{"text":63,"@type":64},"The work is governed by the standard specifications of the State of Ohio, including changes and supplementary specifications listed in the proposal.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How are the construction work phases organized?",{"text":68,"@type":64},"Work phases are presented with sequence points such as Begin Work, Suspend Work, and Resume Work, tied to the project’s right-of-way and station limits.",{"name":70,"@type":61,"acceptedAnswer":71},"What major plan types are referenced in the index?",{"text":72,"@type":64},"The index lists items including typical sections, general notes, sub-summaries and general summary, plan and profile, and cross sections, along with a location plan and line data.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},202203,1788543503,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":55,"slug":125},"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":30,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":80,"read_time":112,"preview_page_count":4},1099514068035,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","数L  \nFORANY QUESTIONS PLEASE CONTACT ODOTDIST 2REALESTATE AT(419)353-8131  \n\n| s阳  \u003Cbr>PROJECT  \u003Cbr>STATE  \u003Cbr>OHIO  \u003Cbr>STATE  \u003Cbr>2  \u003Cbr>S TATE OF OH10  \u003Cbr>LUC-20-(15.91)(16.41)  \u003Cbr>nEC61963  \u003Cbr>DEPARTMENT OF H/GHWAYS  \u003Cbr>erCA  \u003Cbr>LUC-20(59164D  \u003Cbr>LUCAS COUNTY  \u003Cbr>ADAMS TOWNSHIP  \u003Cbr>1959 SPEC/FICAT10NS  \u003Cbr>C/TY OF TOLEDO  \u003Cbr>The standard specifications of the stote  \u003Cbr>of Oh10,Department of Highw oys,inc/uding changes  \u003Cbr>and supplementa/specfications listed in the proposa/  \u003Cbr>sha//govern this /mprovement  \u003Cbr>CONVENTIONAL S/GNS  \u003Cbr>Center Line  \u003Cbr>②  \u003Cbr>Poli tica/sub dirisian  \u003Cbr>Begin Work  \u003Cbr>The right of way for this improvament will/be  \u003Cbr>Boundary  \u003Cbr>5ta.839+9/.95  \u003Cbr>Right of Way  \u003Cbr>provided bytha Stata of Ohio.  \u003Cbr>Corporation Zine  \u003Cbr>Suspend Work  \u003Cbr>cREE  \u003Cbr>Sta 847+8795  \u003Cbr>/herebu 9D D roye these plo2.50no deelare th0f  fbe  \u003Cbr>0  \u003Cbr>口  \u003Cbr>N  \u003Cbr>°  \u003Cbr>making of this improvement,mi//not reguire the closing of the  \u003Cbr>Resume Work  \u003Cbr>B      V  力         T        十r广1素         Dnn th     DroVL.sio2.s for the main tenan  \u003Cbr>eaTAER  \u003Cbr>and sofety of traffie mi//be as set forth on the plans and  \u003Cbr>sta.866+5754  \u003Cbr>estimates.  \u003Cbr>Sta874+3354  \u003Cbr>Approved:  \u003Cbr>/NDEX 0F sHEET5  \u003Cbr>1        -  \u003Cbr>Dafe I-4-6L  \u003Cbr>Tit/e sheet  \u003Cbr>/  \u003Cbr>2  \u003Cbr>Typica/sections  \u003Cbr>Approved:  \u003Cbr>ng ane Programmng  \u003Cbr>3  \u003Cbr>Genera/Notes  \u003Cbr>Date3-/-L/  \u003Cbr>3  \u003Cbr>Sub-summaries  \u003Cbr>3  \u003Cbr>Genera/Summary  \u003Cbr>Approved:  \u003Cbr>Average Hou/:2m  \u003Cbr>Delivery Pont:Moumee  \u003Cbr>4,5  \u003Cbr>Plan and Profile  \u003Cbr>Date__  \u003Cbr>Engineer of Brdges  \u003Cbr>6,7  \u003Cbr>Cross sections  \u003Cbr>Approved  \u003Cbr>L OCAT1 ON PL∠AN  \u003Cbr>Dote 2·7·C/_  \u003Cbr>d Design  \u003Cbr>Approvad  \u003Cbr>and Constrvction  \u003Cbr>Data2-B-61  \u003Cbr>S cale:/in.=0.5mi  \u003Cbr>L/NE DATA  \u003Cbr>Portion to be improved:  \u003Cbr>Approved  \u003Cbr>State Highways  \u003Cbr>Date 3-2-Gl/  \u003Cbr>Ohio Turnpike  \u003Cbr>Sta 839+91.95  \u003Cbr>Begin Work  \u003Cbr>Other Roods 5treets  \u003Cbr>Suspend Work  \u003Cbr>Sta 847+87.95  \u003Cbr>0are3-2-6/  \u003Cbr>Sta 866+57.54  \u003Cbr>Resume Work  \u003Cbr>Director of Highwoys  \u003Cbr>5ta874+53.54  \u003Cbr>End Work  \u003Cbr>Total Length-ProjectEMork592ft=0.301 m  \u003Cbr>D RA W/N6 S  \u003Cbr>5U PPLEMEN TAL SPECIF/CA T1ONS  \u003Cbr>S TANDARD  \u003Cbr>7-15-58  \u003Cbr>9-15-56  \u003Cbr>/2-1-54 R-_  \u003Cbr>4-24-58 I-15No.4  \u003Cbr>I-12,3,4&  \u003Cbr>DEC61963  \u003Cbr>T-8C BNo.1-2-A&B1-26-59 I-Z/-23  \u003Cbr>B-1-56  \u003Cbr>LUC-20-15g¹6.41)  \u003Cbr>FILELUCAS COUNTY  \u003Cbr>1TBCB No 3-A /-26-592-3  \u003Cbr>4-7-50  \u003Cbr>SND 94OTOL  \u003Cbr>NO  \u003Cbr>DATE oF LETT/NG  \u003Cbr>1-2-56  \u003Cbr>CB No.6  1-26-59 T35  \u003Cbr>3  \u003Cbr>-154L-3-Ao-4265  \u003Cbr>CONTRACT NO.  \u003Cbr>G.H.Lua  \u003Cbr>m  \u003Cbr>yep  \u003Cbr>oton  \u003Cbr>J.A.Berg  \u003Cbr>w2a   |\n| --- |\n\n|  |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| FED.RD.  \u003Cbr>DIVISION   | STATE   | PROJECT   |  |  |\n| 2   | OHIO   |  |  |  |\n|  |  |  |  |  |\n\nLUC20-(15.9/)(/6.41)  \n/P-Remove wearing surface from existing pavementareas to be occupied by proposed Traffic 1slandRemove wearing surface from areos shownthus 277.Replace to e/eva tions shown Buildnen pavement as fol/ow.s.Traffic /s/and sta.842+41.95 to sta.843+41.95 ful/width pave-ment between traffic lanes(except that occupied  \n②  \n7INby tro ffic is land)sta.842+41.95 to sta.843f73.45;tapered section Z'surface wid th afsta.SCALE:/IN.=30FT839+9.95 to 10'sarface width at sta 842+41.95.  \n7a63+89995  \na4a4  \n,27  \n⑪  \nC—_12“  \n⑥”7-4_  \npaved berm不pared840841842843.844.③berm_④PB“48'10845846848.100250′pared bern不D→9P29.399而2929.212501048'孤超paved 12“    ←-029.822939A  \n,2.  \n,Aed  \n,2  \n94入  \n4795  \n28  \n29.38  \nB4M  \n2o  \n26  \n3z5  \nmed.  \n100-6634  \nfQ  \n4od  \n,2  \n8Z3′  \n2  \npared bermCBpaved管G”L-4页berm_.G\"1-424“18\".18“  \n29.30B③D  \n2928.\"  \n4P-Remove wearing 5urface from ersting parement areas to be  \noccupvieq by proposed Traffic   /qnd.  \nRe move wearing surface from areas shown thus 77772,Replaceto elerq tions shown.  \nBuild new pavement as follows:Traffic 1sland sta.844+3795 toSta.845大3795;fu//width parement betneen existing /anes lerceptthat occupied by traffic 1slond)  sta.844+05.95 to sta.","cbCain4mw3jWCdYi","https://ap.wps.com/l/cbCain4mw3jWCdYi","pdf",966717,"English","# Conventional Signs\n## Begin Work\n## Suspend Work\n## Resume Work\n# Index of Sheets\n## Title Sheet\n## Typical Sections\n## General Notes\n## Sub-summaries and General Summary\n## Plan and Profile\n## Cross Sections\n# Location Plan Data\n## Line Data\n# Supplemental Specifications","[{\"question\":\"What document governs the highway improvement work?\",\"answer\":\"The work is governed by the standard specifications of the State of Ohio, including changes and supplementary specifications listed in the proposal.\"},{\"question\":\"How are the construction work phases organized?\",\"answer\":\"Work phases are presented with sequence points such as Begin Work, Suspend Work, and Resume Work, tied to the project’s right-of-way and station limits.\"},{\"question\":\"What major plan types are referenced in the index?\",\"answer\":\"The index lists items including typical sections, general notes, sub-summaries and general summary, plan and profile, and cross sections, along with a location plan and line data.\"}]","LUC-20(15.91)(16.41) 1959 SPECIFICATIONS - Ohio Department of Highways | PDF"]