[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663208-105":59,"doc-detail-663208-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","lmfm-drawing-standards-for-consultants-record-drawing-file-and-layer-requirements","LMFM Drawing Standards For Consultants - Record Drawing File and Layer Requirements","","Facilities Management Facilities Systems and Support (FSS) Space Information & Drawing Services provides drawing standards and requirements for consultants supporting design, construction, issued-for-construction (IFC), and project record drawings. The content defines project record drawings, outlines deliverables for different drawing stages, specifies drawing file formats, sharing, catalog information, and naming conventions. It also covers CAD submission guidelines, external references (XREFs), model vs paper space, title blocks, layer standards, scales/units/tolerances, fonts and plot styles, blocks/attributes, and project closeout steps with checklists and core layer lists.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/lmfm-drawing-standards-for-consultants-record-drawing-file-and-layer-requirements/663208/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/lmfm-drawing-standards-for-consultants-record-drawing-file-and-layer-requirements/663208.png","ImageObject",300,407,{"name":92,"@type":93},"McGucket","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are project record drawings, according to the document definition?","Question",{"text":112,"@type":113},"Project record drawings are a final, complete set produced at project completion, field verified after construction, and revised to reflect any changes made during construction. They are archived as a historical record of the actual design and construction.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What deliverables are required for design development, IFC, and project record drawings?",{"text":117,"@type":113},"The document includes separate deliverables sections for design development drawings, issued for construction (IFC) drawings, and project record drawings. Each stage has a summary and specific required deliverables described in the corresponding sections.",{"name":119,"@type":110,"acceptedAnswer":120},"Which technical standards are covered for CAD submissions and drawings?",{"text":121,"@type":113},"Standards include drawing file format and sharing, catalog information format, naming conventions, CAD submission guidelines, external reference files (XREFs), model vs paper space, title blocks, drawing layer standards, scale/units/tolerances, fonts/text/plot styles, and blocks/attributes.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663208,1793225783,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":56,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},1236954412713,"https://us-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Facilities Management – Facilities Systems & Support (FSS) Facilities Space Information & Drawing Services  \nFSS Drawing Standards & Requirements  \nFacilities Management-Facilities Systems & Support (FSS) Facilities Space Information & Drawing Services makes no warranty, either expressed or implied, regarding this document which is provided to external individuals and firms solely on an “as is” basis. In no event shall FSS or the authors of this document be liable to anyone for any collateral, incidental or consequential damages in connection with or arising out of the use of this document. The FSS Space Information & Drawing Services Team reserves the right to revise and improve this document on an as required basis. This edition describes the state of the document at the time of its publication plus any subsequent revisions and may not reflect the content of the document at all times in the future.  \nPlease direct any questions or comments about this document to the address below.  \nFacilities Management – Facilities Systems and Support (FSS)  \n400 – 13450 102nd Avenue  \nSurrey, BC V3T 0H1  \nemail: [FMSupport@fraserhealth.ca](FMSupport@fraserhealth.ca)  \nRevised February 2020  \nContents  \nGeneral Information ................................................................................................................... 3  \nDefinition of Project Record Drawings .................................................................................... 3  \nPurpose ................................................................................................................................. 3  \nUse ........................................................................................................................................ 3  \nDisclaimer on Record Drawing Use by Facilities Management............................................... 3  \nDeliverables Required for Design Development Drawings ......................................................... 4  \nSummary ............................................................................................................................... 4  \nDeliverables Required for Issued for Construction (IFC) Drawings ............................................. 4  \nSummary ............................................................................................................................... 4  \nDeliverables Required for Project Record Drawings ................................................................... 4  \nSummary ............................................................................................................................... 4  \nDrawing File Format ............................................................................................................... 5  \nFile Sharing ............................................................................................................................ 5  \nDrawing Catalog Information Format ...................................................................................... 6  \nFSS Drawing Services Naming Conventions ............................................................................. 7  \nProject Information ................................................................................................................. 7  \nDiscipline List ......................................................................................................................... 7  \nFloor Naming ......................................................................................................................... 7  \nRoom Naming ........................................................................................................................ 8  \nCAD based Project Drawing Submission Guidelines .................................................................. 8  \nExternal Reference Files (XREFs) ......................................................................................... 8  \nModel Space and Paper Spac","cbCaidP5CQa2sEyK","https://ap.wps.com/l/cbCaidP5CQa2sEyK","pdf",932314,"English","# General Information\n## Definition of Project Record Drawings\n## Purpose\n## Use\n## Disclaimer on Record Drawing Use by Facilities Management\n# Deliverables for Drawings\n## Deliverables Required for Design Development Drawings\n## Deliverables Required for Issued for Construction (IFC) Drawings\n## Deliverables Required for Project Record Drawings\n# Drawing Standards and Formats\n## Drawing File Format\n## File Sharing\n## Drawing Catalog Information Format\n## FSS Drawing Services Naming Conventions\n## Project Information\n## Discipline List\n## Floor Naming\n## Room Naming\n## CAD based Project Drawing Submission Guidelines\n## External Reference Files (XREFs)\n## Model Space and Paper Space\n## Title Blocks\n## Drawing Layer Standards\n## Scale, Units and Tolerances\n## Fonts, Text and Plot Styles\n## Blocks and Attributes\n## Project Closeout Steps\n# Appendices\n## APPENDIX A-Project Closeout Checklist\n## APPENDIX B-FSS CAD Core Layers (Expanded List)","[{\"question\":\"What are project record drawings, according to the document definition?\",\"answer\":\"Project record drawings are a final, complete set produced at project completion, field verified after construction, and revised to reflect any changes made during construction. They are archived as a historical record of the actual design and construction.\"},{\"question\":\"What deliverables are required for design development, IFC, and project record drawings?\",\"answer\":\"The document includes separate deliverables sections for design development drawings, issued for construction (IFC) drawings, and project record drawings. Each stage has a summary and specific required deliverables described in the corresponding sections.\"},{\"question\":\"Which technical standards are covered for CAD submissions and drawings?\",\"answer\":\"Standards include drawing file format and sharing, catalog information format, naming conventions, CAD submission guidelines, external reference files (XREFs), model vs paper space, title blocks, drawing layer standards, scale/units/tolerances, fonts/text/plot styles, and blocks/attributes.\"}]","LMFM Drawing Standards For Consultants - Record Drawing File and Layer Requirements | PDF",48]