[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664585-105":59,"doc-detail-664585-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","list-of-drawings-final-presentation-required-sheets-and-drawing-requirements","List-of-Drawings-Final-Presentation - Required Sheets and Drawing Requirements","","Final submission set due Sunday May 14 specifies the required and optional drawing sheets for an end-of-semester architectural presentation. It outlines what to include on the cover sheet, perspectives, architectural floor plans with grids, door and room keys, mechanical shaft and stair locations, door schedules, and guidance for basement and multi-level plans. It further covers reflected ceiling plans with lighting, HVAC, column-grid dimensions, and fire-rating color coding, plus exterior building elevations and full building sections. It also defines coloring by water, structure, thermal, and fire, recommends compact sheet layouts, and allows additional sheets for door schedules when needed.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/list-of-drawings-final-presentation-required-sheets-and-drawing-requirements/664585/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/list-of-drawings-final-presentation-required-sheets-and-drawing-requirements/664585.png","ImageObject",300,407,{"name":92,"@type":93},"Jake","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is due and what submission set does the document describe?","Question",{"text":112,"@type":113},"It sets a final submission due Sunday May 14 and provides the required and optional sheet list for the end-of-semester architectural presentation.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which key items must be included in the architectural floor plans for each level?",{"text":117,"@type":113},"Architectural floor plans must include column grids with dimensions, interior wall layouts, room keys and door keys, correctly named and numbered rooms, mechanical shaft locations and stairs, and a door schedule for each level.",{"name":119,"@type":110,"acceptedAnswer":120},"What are the reflected ceiling plan requirements and how should fire ratings be shown?",{"text":121,"@type":113},"Reflected ceiling plans should show column-grid dimensions and include lighting and HVAC supply/return grills; one RCP must include color coding for fire ratings, using the referenced tutorial for correct colors.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664585,1793260941,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},962084928904,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| FINAL SUBMISSION SET DUE SUNDAY MAY 14 |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| Required\u003Cbr>Optional | Sheet No | Sheet Name | Recommended\u003Cbr>Scale | Include the following |\n| Required | A-001 | COVER SHEET | NA | 1 EXTERIOR 3D IMAGE, DRAWINGS LISTS (Structural & Architectural are to be shown as separate lists) |\n| Optional | A-002 | Perspectives | NA | Compose 1 sheet of your best perspectives, interior and exeriorto show off all the hard work you put into your model. Consider showing off structural components or indoor multistory spaces. |\n| Architectural Drawings only other Architectural Drawings should be keyed and\u003Cbr>Structural drawings only reference other structural drawings. |  |  |  |  |\n| For all Architectural Floor Plans.\u003Cbr>Column grids with dimensions. All interior walls, room keys and door keys. Make sure rooms are named and numbered and that they match. Mechancial shaft locations and stairs should be shown. Door schedule for each level. If possible fit the schedule for each level on the same sheet with the corresponding level. If you cannot fit them add an extra sheet (A-105) and put all the door schedules here. You must demonstrate the ability to use the filter option so if you put them on a single sheet they need to be\u003Cbr>separated up by floor. |  |  |  |  |\n| Required | A-100 | Basement Floor Plan | 1/8\" = 1'-0\" | Same as above Note: Foundations walls and structural concrete columns should show but footing and isolated footings should only be visible on the structural basement plan. To control this visibility check the view range setting. |\n| Required | A-101 | Level 1 Floor Plan | 1/8\" = 1'-0\" | Same as above. Remember that at least 2 stair doors on level one must also exit directly out of the building. If you have a third interior stair it can exit into the corridors and then out through the main entrance of the building. Make sure all doors open in the direction of egress. |\n| Required | A-102 | Level 2 Floor Plan | 1/8\" = 1'-0\" | Same as above |\n| Required | A-103 | Level 3 Floor Plan | 1/8\" = 1'-0\" | Same as above |\n| Required | A-104 | Roof Plan | 1/8\" = 1'-0\" | Same as above. At least 1 stair must extend to the roof. |\n|  |  |  |  |  |\n| For all Reflected Ceiling Plans:\u003Cbr>RCP plans show roofs but no doors. Stairs will be visible. Elevators typically are not visible. Spaces can either have a hung ceiling (2 x 2, 2 x 4, etc. ) or sheetrock or can have exposed structure (beams will be visible) . Spaces should all contain lights and HVAC (both supply and return grills) Rooms typically have 1 return and several supply ducts. Include dimensions of the column\u003Cbr>grids. |  |  |  |  |\n| One of the reflected ceiling plans must show color coding for fire ratings.  Please refer to the tutorial listed on day 16 for refernce on correct colors and how to apply them. |  |  |  |  |\n| Required | A-200 | BASEMENT RCP | 1/8\" = 1'-0\" | Same as A-201 |\n| Required | A-201 | LEVEL 1 RCP | 1/8\" = 1'-0\" | Same as A-201 |\n| Required | A-202 | LEVEL 2 RCP | 1/8\" = 1'-0\" | Same as A-201 |\n| Required | A-203 | LEVEL 3 RCP | 1/8\" = 1'-0\" | Same as A-201 |\n|  |  |  |  |  |\n| Required | A-301 | EXTERIOR\u003Cbr>BUILDING\u003Cbr>ELEVATIONS | 1/8\" = 1'-0\" | Exterior wall-from ground up to roof. Do not show anything below level 1 (no footings or basement walls) . Include levels and column grids. Dimension column grids. |\n| Required | A-302 | EXTERIOR\u003Cbr>BUILDING\u003Cbr>ELEVATIONS | 1/8\" = 1'-0\" | Same as A-301, A-302, etc. -use as many sheets as needed |\n| Required | A-310 | FULL BUILDING\u003Cbr>SECTIONS | 1/8\" = 1'-0\" | A minimum of two full building sections. These show the full building from footing to parapet and roof. Include levels and column grids. Dimension column grids. Label spaces. |\n|  |  |  |  |  |\n\n\n| Your details sheets are the most important sheets of your end of semester presentation. They are to be featured in your final powerpoint and they will be plotted full size and pinned up in the corridor. Remember that you must show mat","cbCain33uTylevBO","https://ap.wps.com/l/cbCain33uTylevBO","pdf",71321,"English","# Required and Optional Submission Sheets\n## Cover sheet and perspectives\n## Architectural floor plans (A-100 to A-104)\n## Reflected ceiling plans (A-200 to A-203)\n## Exterior elevations and full building sections (A-301 to A-310)\n## Wall sections, details, and isometrics (optional A-401 to A-402)\n# Presentation and formatting requirements\n## Plotting, scaling, matching callouts\n## Color coding by discipline","[{\"question\":\"What is due and what submission set does the document describe?\",\"answer\":\"It sets a final submission due Sunday May 14 and provides the required and optional sheet list for the end-of-semester architectural presentation.\"},{\"question\":\"Which key items must be included in the architectural floor plans for each level?\",\"answer\":\"Architectural floor plans must include column grids with dimensions, interior wall layouts, room keys and door keys, correctly named and numbered rooms, mechanical shaft locations and stairs, and a door schedule for each level.\"},{\"question\":\"What are the reflected ceiling plan requirements and how should fire ratings be shown?\",\"answer\":\"Reflected ceiling plans should show column-grid dimensions and include lighting and HVAC supply/return grills; one RCP must include color coding for fire ratings, using the referenced tutorial for correct colors.\"}]","List-of-Drawings-Final-Presentation - Required Sheets and Drawing Requirements | PDF"]