[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-513761-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-513761-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","list-of-civil-project-awarded-till-date-01042023-in-fy-2023-24","List of Civil Project awarded till date (01/04/2023) in FY 2023-24","","Tabular list of civil infrastructure projects awarded up to 01/04/2023 for the financial year 2023-24. Each entry records project name, total length, state, PIU, lane configuration, NH corridor/new highway identifier, and execution mode (such as EPC, HAM, Item Rate). The table also includes concessioner/contractor names, total awarded cost in crore rupees, and LOA date for civil work, enabling structured tracking of multiple road and flyover packages across Andhra Pradesh.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/list-of-civil-project-awarded-till-date-01042023-in-fy-2023-24/513761/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/list-of-civil-project-awarded-till-date-01042023-in-fy-2023-24/513761.png","ImageObject",300,407,{"name":42,"@type":43},"hdkawk","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-09","2026-10-06",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What information does each project entry include in the list?","Question",{"text":63,"@type":64},"Each entry includes project name, total length, state, PIU, lane details, NH (new) identifier, mode, concessioner, total awarded cost, and LOA date for civil work.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which states are represented in the awarded projects?",{"text":68,"@type":64},"The document entries shown include Andhra Pradesh, with PIU locations such as Rajamahendravaram, Vijayawada, Anantapur, Tirupati, Kadapa, and Amravati (AP).",{"name":70,"@type":61,"acceptedAnswer":71},"How are execution modes and awarded costs presented?",{"text":72,"@type":64},"Execution modes are listed per project (e.g., EPC, HAM, Item Rate), and total awarded cost is provided in Rs Cr alongside the LOA date for civil work.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},513761,1791330370,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":145,"read_time":146,"preview_page_count":33,"preview_urls":147},3985747859855,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","| List of Civil Project awarded till date (01/04/2023) in FY 2023-24 |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| [S.no](S.no) | Project Name | Total\u003Cbr>Length | state | PIU | Lanes | NH (New) | Mode | Concessioner | Total\u003Cbr>Awarded\u003Cbr>Cost (Rs\u003Cbr>Cr) | Loa Date Civil\u003Cbr>work |\n| 1 | Construction of Flyover at Km 936+440 of NH-216A [Jonnada Junction with Black Spot ID: AP –(02)-134], Flyover at Km 967+180 of NH-216A [Undrajavaram Junction with Black Spot ID: AP- (02) - 078], Flyover at Km 970+370 of NH-216A (Tetali Junction with Black Spot ID: AP – 005), VUP at Km 1006+525 of NH-216A (Kaikaram Junction with Black Spot ID: AP – 007) for rectification of Blackspots and construction of Flyover at Km 910+760 of NH-216A in Rajahmundry City (Morampudi Junction) in the State of Andhra Pradesh on EPC Mode | 6.425 | Andhra Pradesh | Rajamahendravaram | 4L | 216A,216\u003Cbr>A,216A,21\u003Cbr>6A,216A | HAM | Shrushti Contech\u003Cbr>Pvt. Ltd. | 119.15 | 23/06/2022 |\n| 2 | Construction of Half Flyover at Km 1082+320 (Design Chainage at Km. 0+740) at Vijayawada Airport near Gannavaramon Gundugolanu – Vijayawada Section of NH-16 Mode towards rectification of Black Spot ID: AP-(02)-093 | 1.415 | Andhra Pradesh | Vijayawada | 4L | 16 | EPC | Trenzet Infra Private\u003Cbr>Limited | 23.77 | 04/05/2022 |\n| 3 | Periodical Renewal of balance section of the project stretch including renewal of service road / slip road from Km 211.000 to Km 462.164 on Hyderabad-Bangalore section of NH 44 | 251.164 | Andhra Pradesh | Anantapur | 4L PS |  | EPC | Lakshmi\u003Cbr>Infrastructure &\u003Cbr>Developers India\u003Cbr>Pvt. Ltd. | 181.00 | 06/04/2022 |\n| 4 | 4L of Kadapa – China Orampadu section of NH-716 (Package I of KadapaRenigunta section) | 64.2 | Andhra Pradesh | Tirupati | 4L | 716 | Item Rate | Lakshmi\u003Cbr>Infrastructure &\u003Cbr>Developers India\u003Cbr>Pvt. Ltd. | 1222.11 | 24/03/2023 |\n| 5 | 4 L of China Orampadu-Renigunta section of NH-716 (Package-II of KadapaRenigunta section) | 57.735 | Andhra Pradesh | Tirupati | 4L PS |  | Item Rate | Lakshmi\u003Cbr>Infrastructure &\u003Cbr>Developers India\u003Cbr>Pvt. Ltd. | 1032.32 | 24/03/2023 |\n\n\n| [S.no](S.no) | Project Name | Total\u003Cbr>Length | state | PIU | Lanes | NH (New) | Mode | Concessioner | Total\u003Cbr>Awarded\u003Cbr>Cost (Rs\u003Cbr>Cr) | Loa Date Civil\u003Cbr>work |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| 6 | 6L Access Controlled Greenfield Highway from Kodur (Ch. 0+000) to Vanavolu (Ch. 24+300) of [NH-544G] (Package-1) | 24.3 | Andhra Pradesh | Kadapa | 6L | 544G | Item Rate | Dilip Buildcon Ltd. | 599.50 | 31/01/2023 |\n| 7 | 6L Access Controlled Greenfield Highway from Yerragudipadu (Ch. 129+000) to Audireddipalle (Ch. 160+000) of [NH – 544G] (Package-6) | 31 | Andhra Pradesh | Kadapa | 6L | 544G | EPC | Megha Engineering and Infrastructure\u003Cbr>Ltd. | 802.22 | 28/02/2023 |\n| 8 | 6L Access Controlled Greenfield Highway from Nallacheruvu palli (Ch. 96+300) to Yerragudipadu (Ch. 129+000) of [NH- 544G] (Package-5) | 32.7 | Andhra Pradesh | Kadapa | 6L | 544G | EPC | Megha Engineering and Infrastructure\u003Cbr>Ltd. | 819.21 | 28/02/2023 |\n| 9 | 6L Access Controlled Greenfield Highway from Odulapalle (Ch. 72+000) to Nallacheruvu-palli (Ch. 96+300) of [NH- 544G](Package-4) | 24.3 | Andhra Pradesh | Kadapa | 6L | 544G | EPC | Dilip Buildcon Ltd. | 774.10 | 31/01/2023 |\n| 10 | 6L Access Controlled Greenfield Highway from Vankarakunta (Ch. 45+700) to Odulapalle (Ch. 72+000) of [NH- 544G](Package-3) | 26.3 | Andhra Pradesh | Kadapa | 6L | 544G | Item Rate | Raj Path Infracon\u003Cbr>Pvt. Ltd. | 697.21 | 31/01/2023 |\n| 11 | 6L Access Controlled Greenfield Highway\u003Cbr>from Vanavolu (Ch. 24+300) to Vankarakunta (Ch. 45+700) of [NH-544G](Package-2) | 21.4 | Andhra Pradesh | Kadapa | 6L | 544G | Item Rate | Raj Path Infracon\u003Cbr>Pvt. Ltd. | 461.23 | 31/01/2023 |\n| 12 | 6L Access Controlled Greenfield Highway from Narayanmpet (Ch. 203+500) to Chandrasekharpuram (Ch. 228+000)(Package-10) | 24.5 | Andhra Pra","cbCaiqhbW3b4XCeh","https://ap.wps.com/l/cbCaiqhbW3b4XCeh","pdf",662478,39,"English","# Project Listing\n## Awarded project details\n## Financial and administrative fields","[{\"question\":\"What information does each project entry include in the list?\",\"answer\":\"Each entry includes project name, total length, state, PIU, lane details, NH (new) identifier, mode, concessioner, total awarded cost, and LOA date for civil work.\"},{\"question\":\"Which states are represented in the awarded projects?\",\"answer\":\"The document entries shown include Andhra Pradesh, with PIU locations such as Rajamahendravaram, Vijayawada, Anantapur, Tirupati, Kadapa, and Amravati (AP).\"},{\"question\":\"How are execution modes and awarded costs presented?\",\"answer\":\"Execution modes are listed per project (e.g., EPC, HAM, Item Rate), and total awarded cost is provided in Rs Cr alongside the LOA date for civil work.\"}]","List of Civil Project awarded till date (01/04/2023) in FY 2023-24 | PDF",1791290453,98,[148,152,155,159],{"page_no":22,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/b897de41f59c2185807d5ccfc4293745.webp",983,694,{"page_no":26,"url":153,"width":154,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/476f0d5f54f5f993dc179b2bf00f361e.webp",982,{"page_no":30,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a76421d7872e9e9ebb51dc9e792cbe92.webp",981,693,{"page_no":33,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/0d714761e3ff5013496f952052fd9aeb.webp",980,692]