[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-674262-105":59,"doc-detail-674262-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","linear-reveal-sample-shop-drawings-general-notes","Linear Reveal Sample Shop Drawings - General Notes","","Linear reveal sample shop drawings provide contractor responsibilities and review requirements before production begins, including verification of field dimensions, correction of panel-affecting measurements, and notification of discrepancies prior to manufacturing. Approval signatures are mandatory to start work. The document specifies acclimation conditions (temperature, humidity, 72-hour period, removal of plastic wrapping) plus guidance on wood species variability, UV effects, and finish limitations. It also outlines panel construction constraints and rules for field cutting and ceiling penetrations.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/linear-reveal-sample-shop-drawings-general-notes/674262/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/linear-reveal-sample-shop-drawings-general-notes/674262.png","ImageObject",300,407,{"name":92,"@type":93},"Aditya","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-04",true,{"@type":101,"interactionType":102,"userInteractionCount":14},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What are the contractor’s responsibilities before manufacturing starts?","Question",{"text":111,"@type":112},"The contractor must verify all field dimensions, correct any measurements affecting panels, and notify ASI of quantity or size discrepancies from the plans before manufacturing.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What approval is required to begin production?",{"text":116,"@type":112},"All project dimensions and design elements must be approved and signed off before ASI can start production, and work cannot begin until approval is obtained.",{"name":118,"@type":109,"acceptedAnswer":119},"What acclimation conditions must be met prior to installation?",{"text":120,"@type":112},"ASI products must be kept clean and dry with ambient temperature between 50°F and 86°F and relative humidity between 25% RH (min) and 55% RH (max) for 72 hours before installation.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},674262,1793759005,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},962085564549,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","SAMPLE SHOP DRAWINGS-LINEAR REVEAL  \nGENERAL NOTES  \nFIELD MEASUREMENTS/ DIMENSIONING  \nTHE CONTRACTOR IS RESPONSIBLE FOR ALL FINAL PANEL SIZES, SHAPES, AND QUANTITIES TO COMPLETE THE PROJECT. IF THERE ARE ANY DISCREPANCIES IN QUANTITIES OR SIZES THAT DEVIATE FROM THESE PLANS THE CONTRACTOR MUST NOTIFY ASI PRIOR TO ANY MANUFACTURING. CONTRACTOR MUST REVIEW AND VERIFY ALL DIMENSIONS IN THE FIELD, MARK-UP, CORRECTING ANY DIMENSIONS AFFECTING PANELS AND RETURN TO ASI FOR CORRECTIONS TO THE PLANS. ASI WILL APPLY THESE CHANGES FOR FINAL SIGN-OFF AND PRODUCTION. ASI WILL NOT BE RESPONSIBLE FOR ANY PANEL CHANGES NOT CORRECTED BY THE CONTRACTOR DURING THIS PROCESS.  \nAPPROVAL SIGNATURES  \nALL DIMENSIONS AND DESIGN ELEMENTS OF THE PROJECT MUST BE APPROVED AND SIGNED OFF ON BEFORE ASI CAN BEGIN PRODUCTION. DEPENDING ON THE PROJECT, EITHER AN ARCHITECT'S STAMP MARKED \"APPROVED\" OR A SIGNATURE BY THE CONTRACTOR CAN BE ACCEPTABLE. PROJECTS CANNOT BE STARTED UNTIL APPROVED. RETURNING THE DRAWINGS WITHOUT A SIGNATURE OF APPROVAL WILL DELAY THE PRODUCTION PROCESS.  \nACCLIMATION  \nPRIOR TO INSTALLATION AT THE JOB SITE ASI PRODUCTS MUST BE KEPT CLEAN AND DRY IN AN ENVIRONMENT WITH THE FOLLOWING CONDITIONS:  \n*AMBIENT ENVIRONMENT TEMPERATURE MUST REMAIN BETWEEN 50 DEG. AND 86 DEG. AND RELATIVE HUMIDITY LEVELS MUST BE BETWEEN 25% RH (MIN. ) AND 55% RH (MAX. ) DURING THE ACCLIMATION AND INSTALLATION PERIOD. THE PRODUCT MUST BE ACCLIMATED IN THIS ENVIRONMENT FOR A PERIOD OF 72 HOURS PRIOR TO INSTALLATION.  \n*ANY PLASTIC WRAPPING OF THE PRODUCT MUST BE REMOVED FOR THE PERIOD OF ACCLIMATION. ALL WET WORK AT THE JOB SITE MUST BE COMPLETED AND DRY. ASI TAKES NO RESPONSIBILITY FOR ANY DAMAGE OR WARPING OF PANELS IF THESE CONDITIONS ARE NOT STRICTLY ADHERED TO.  \nWOOD SPECIES  \nGRAIN PATTERNS AND COLOR VARIANCES CAN DIFFER WITHIN A WOOD SPECIES  \nFROM BOARD TO BOARD AND WITHIN A BOARD DEPENDING ON THE TYPE OF SPECIES. FINISHES AND STAINS WILL HELP TO MINIMIZE THIS, BUT WILL NOT ELIMINATE THE VARIATIONS. PLEASE NOTE THAT PRODUCT SAMPLES ARE NOT A TOTAL REPRESENTATION OF THE RANGE OF VARIATIONS POSSIBLE. U.V. LIGHT WILL HAVE ADVERSE EFFECTS TO THE COLOR ON ANY EXPOSED WOODS. ASI TAKES NO RESPONSIBILITY FOR THE COLOR VARIATIONS, GRAIN AND TEXTURE NATURALLY PRESENT IN THE CHARACTER OF THE WOODS.  \nFINISH  \nBECAUSE OF NATURAL VARIATIONS IN COLOR AND GRAIN OF WOOD, FINISHED PANELS CANNOT BE EXPECTED TO MATCH EXACTLY TO SUPPLIED SAMPLE BUT SHOULD BE WITHIN A SAMPLE RANGE. U.V. LIGHT WILL AFFECT THE COLOR OF EXPOSED WOODS, OVER TIME THE PANELS MAY DARKEN OR LIGHTEN. ASI TAKES NO RESPONSIBILITY FOR NATURAL COLOR VARIATIONS, GRAIN AND TEXTURE VARIANCES, OR MATERIALS ADVERSELY EXPOSED TO U.V. LIGHT.  \nPANEL CONSTRUCTION  \nASI PANELS ARE NOT DESIGNED FOR STRUCTURAL USE. LIGHTING FIXTURES, MECH./H.V.A.C., GRILLES, DIFFUSERS, EQUIPMENT, ETC., OR ANY OTHER TYPES OF FIXTURES MUST BE INDEPENDENTLY SUPPORTED IN COMPLIANCE WITH ALLSTATE, LOCAL BUILDING CODES AND NOT SUSPENDED FROM ASI PANELS. USING PANELS FOR STRUCTURAL SUPPORT WILL VOID THE WARRANTY.  \nFIELD CUTTING/CEILING PENETRATIONS MUST NOT INTERFERE WITH PANEL SUSPENSION POINTS & CEILING PANEL EDGE LOCATIONS, THUS COMPROMISING THE CEILING SYSTEMS INTEGRITY. PLANNING & LAYOUT CONSIDERATIONS SHOULD BE MADE TO AVOID THIS SITUATION, RELOCATING ITEMS AS NECESSARY. ALL FIELD CUTOUTS SHOULD BE DONE WITHIN A MINIMUM DISTANCE/ PERIMETER OF AN 1 1/2\" IN FROM ALL PANEL EDGES.  \nANY AND ALL CEILING PENETRATIONS FOR LIGHTING, ELECTRICAL, MECHANICAL, H.V.A.C., SPRINKLER HEADS, ETC. ARE CONSIDERED BY ASI TO BE FIELD CUTS AND ARE THE RESPONSIBILITY OF THE CONTRACTOR AND/OR INSTALLER,UNLESS SPECIAL DIRECTION/DETAILS ARE PROVIDED, PRICED, APPROVED & ACCEPTED.  \n| | APPROVED\u003Cbr>REVISE/RESUBMIT |\n| --- | --- |\n| NAME SIGNATURE\u003Cbr>DATE |  |\n| NOTES: \"APPROVED AS NOTED\" DRAWINGS WILL NOT BE ACCEPTED. FULL APPROVAL IS REQUIRED. AFTER FIRST REVISION, CHARGES WILL APPLY FOR ADDITIONAL REVISIONS. |  |\n\nSHEET LIST TABLE  \n\n|  |  | REVIEW | RE","cbCaipKCWNbqtbdi","https://ap.wps.com/l/cbCaipKCWNbqtbdi","pdf",3871625,14,"English","# Sample Shop Drawings - Linear Reveal\n## General Notes\n## Field Measurements and Dimensioning\n## Approval Signatures\n## Acclimation\n## Wood Species\n## Finish\n## Panel Construction\n## Field Cutting and Ceiling Penetrations\n## Sheet List Table\n## Legend & Typical Notes\n## Product Matrix","[{\"question\":\"What are the contractor’s responsibilities before manufacturing starts?\",\"answer\":\"The contractor must verify all field dimensions, correct any measurements affecting panels, and notify ASI of quantity or size discrepancies from the plans before manufacturing.\"},{\"question\":\"What approval is required to begin production?\",\"answer\":\"All project dimensions and design elements must be approved and signed off before ASI can start production, and work cannot begin until approval is obtained.\"},{\"question\":\"What acclimation conditions must be met prior to installation?\",\"answer\":\"ASI products must be kept clean and dry with ambient temperature between 50°F and 86°F and relative humidity between 25% RH (min) and 55% RH (max) for 72 hours before installation.\"}]","Linear Reveal Sample Shop Drawings - General Notes | PDF",35]