[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-138516-105":59,"doc-detail-138516-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","lincoln-orchard-mesa-elementary-school-proposed-scope","Lincoln Orchard Mesa Elementary School Proposed Scope","","Lincoln Orchard Mesa Elementary School scope and narrative outline facility and site needs, focusing on safety, priority maintenance, life safety, and long-term improvements. The report identifies major condition issues including HVAC rooftop unit replacement, plumbing fixture upgrades, site and parking lot paving, and interior finish deficiencies. Educational adequacy is expected to improve through redesigned special education and small-group support spaces, stronger acoustics and lighting, and modern learning environments. Enrollment utilization is within the ideal 75%–90% range, with safety and security upgrades such as fencing, signage, bollards, access control, and PA system improvements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/lincoln-orchard-mesa-elementary-school-proposed-scope/138516/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/lincoln-orchard-mesa-elementary-school-proposed-scope/138516.png","ImageObject",300,407,{"name":92,"@type":93},"Kyle","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-09-27","2026-08-23",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the most significant physical needs identified for Lincoln Orchard Mesa Elementary School?","Question",{"text":112,"@type":113},"The report highlights major needs including replacing HVAC rooftop units, replacing plumbing fixtures, addressing site and parking lot paving, and completing interior finish improvements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does the proposed scope aim to improve educational adequacy?",{"text":117,"@type":113},"It focuses on modernized special education and small-group support spaces, general classroom improvements, and better acoustical and lighting conditions in learning environments and field/site areas.",{"name":119,"@type":110,"acceptedAnswer":120},"What safety and security measures are included in the proposed scope?",{"text":121,"@type":113},"Included measures cover partial perimeter fencing, signage at the main entry, bollards at the main entry, an updated security alarm system to monitor exterior door positions, access control at exterior doors, and an upgraded public address (PA) system.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},138516,1787482282,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},3985741905716,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","LINCOLN ORCHARD MESA ELEMENTARY SCHOOL PROPOSED SCOPE  \nDistrict:  \nFacility:  \nAddress:  \nCity:  \nSite Area (AC):  \nGross Building Area (SF):  \nNumber of Stories:  \nYears Constructed / Renovated: Total Replacement Value:  \nTotal Condition Budget:  \nFacility Condition Score:  \nEducational Adequacy Score :  \nEnrollment:  \nCapacity:  \nUtilization (% Capacity):  \nMesa County Valley District 51 Lincoln Orchard Mesa Elementar 2888 B 1/2 Road  \nGrand Junction, CO  \n4.8  \n44,081.00  \n1  \n1957 / 1964 / 1991  \n$20,497,334.39 $7,713,068.59  \n62.4%  \n58%  \n316  \n397  \n80%  \n62.40% \\#\\# 58.40% \\# 79.60%  \nD  \nED􀀘C􀀗TION􀀗􀀖 􀀗DE􀀔􀀘􀀗C􀀓  \n58%  \nNARRATIVE SUMMARY OF BUILDING AND SITE   \nLincoln Orchard Mesa Elementary School is in poor condition. The most significant physical needs are related to replacing HVAC rooftop units, replacing plumbing fixtures, site and parking lot paving and interior finish needs. This school's educational adequacy would benefit from modernized special education and small group support spaces, general classroom improvements, and better acoustical and lighting conditions in the learning environments, field space and site traffic safety. The school enrollment is within the ideal range of 75%-90% utilization.  \nSITE  \n| SCOPE DESCRIPTION: |  | TOTAL PROJECT COST: | PHASE: |\n| --- | --- | --- | --- |\n| SAFETY + SECURITY | Fencing at site perimeter (partial)\u003Cbr>Signage at main entry + no trespass\u003Cbr>Install Bollards at main entry\u003Cbr>Update security alarm system to monitor ext door positio Access control at all exterior doors\u003Cbr>Upgrade PA System | $933,000 | 1 |\n| \u003Cbr>PRIORITY MAINTENANCE + L IFE SAFETY | Drainage improvements, clear ADA access route Safety post for roof ladder\u003Cbr>Replace all exterior canopy support column s Replace casework at sinks for code / ADA compliance Add panic hardware to select interior doors\u003Cbr>Abate and replace ACM ceiling tiles Vent art kiln\u003Cbr>Exit signs at all exterior doors Replace plumbing fixtures Install Fire Sprinkler System |  | 1 |\n|  |  | $3,097,000 |  |\n| \u003Cbr>LEAN RING ENVIRONMENT | Create modernized spaces for small group, intervention, project-based learning and SPED | \u003Cbr>$580,000 | 1 |\n| \u003Cbr>FUTURE SCOPE | Replace damaged concrete and parking lot paving Reseal building perimeter at grade\u003Cbr>Reseal exterior joints and penetrations\u003Cbr>Replace roof overhang support columns\u003Cbr>Replace damaged flooring, casework, door hardware ADA toilet room upgrades\u003Cbr>HVAC: Replace rooftop units, furnaces, water heaters Replace light fixtures, fire alarm\u003Cbr>Replace room signage throughout New instructional technology and furniture Add acoustical insulation above ceiling Add operable window coverings | |  |\n\nSCHOOL  \n69","cbCaijlTALBHmmA9","https://ap.wps.com/l/cbCaijlTALBHmmA9","pdf",1581098,"English","# Narrative Summary of Building and Site\n## Safety + Security\n## Priority Maintenance + Life Safety\n## Learning Environment Enhancements\n## Future Scope","[{\"question\":\"What are the most significant physical needs identified for Lincoln Orchard Mesa Elementary School?\",\"answer\":\"The report highlights major needs including replacing HVAC rooftop units, replacing plumbing fixtures, addressing site and parking lot paving, and completing interior finish improvements.\"},{\"question\":\"How does the proposed scope aim to improve educational adequacy?\",\"answer\":\"It focuses on modernized special education and small-group support spaces, general classroom improvements, and better acoustical and lighting conditions in learning environments and field/site areas.\"},{\"question\":\"What safety and security measures are included in the proposed scope?\",\"answer\":\"Included measures cover partial perimeter fencing, signage at the main entry, bollards at the main entry, an updated security alarm system to monitor exterior door positions, access control at exterior doors, and an upgraded public address (PA) system.\"}]","Lincoln Orchard Mesa Elementary School Proposed Scope | PDF"]