[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649247-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-649247-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","lighting-fixture-schedule-general-notes","Lighting Fixture Schedule - General Notes","","Lighting fixture schedule notes specify requirements for fixture ratings, labeling, and code compliance, including UL damp/wet conditions and fire-rated enclosures where required. The document outlines coordination steps before ordering, such as confirming voltage, ceiling trim compatibility, ceiling cavity depth, and finish coordination. It defines installation details for recessed and fluorescent systems, dimming compatibility, clearances to combustibles and insulation, support-wire and screw installation, and cleaning standards. Additional sections cover emergency lighting battery pack provisions, tandem wiring rules, and substitution approval and submittal timing.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/lighting-fixture-schedule-general-notes/649247/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/lighting-fixture-schedule-general-notes/649247.png","ImageObject",300,407,{"name":42,"@type":43},"Margaret","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-01","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What coordination is required before ordering lighting fixtures?","Question",{"text":62,"@type":63},"Coordinate fixture locations with architectural reflected ceiling plans and ceiling cavity depths, and verify fixture voltage and ceiling trim compatibility prior to ordering. Coordinate finishes with the architect before ordering as well.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What are the general installation and compatibility requirements for lighting systems?",{"text":67,"@type":63},"Provide fire-rated enclosures for fixtures in fire-rated ceilings, ensure factory-certified compatibility for dimming systems across fixtures, lamps, ballasts, and controls, and mount fixtures per OSHA and electrical code requirements with required seismic provisions. Maintain specified clearances to combustibles and insulation for non-IC rated recessed lighting.",{"name":69,"@type":60,"acceptedAnswer":70},"How are emergency lighting fixtures and battery packs handled?",{"text":71,"@type":63},"Emergency fixtures must include emergency battery packs with specified models and lamp operation durations for linear T5/T8 and compact fluorescent lamps, plus test switch/charge light requirements. Night lights and exit signs must use an unswitched, undimmed “hot” conductor and comply with NEC Article 700.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},649247,1792798473,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},137451207643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| LIGHTING FIXTURE SCHEDULE |\n| --- |\n| LIGHTING FIXTURE GENERAL NOTES:\u003Cbr>1. FIXTURES SHALL HAVE APPROPRIATE UL LABEL, DAMP, OR WET AS REQUIRED BY CODES AND ORDINANCES.\u003Cbr>2. LIGHTING FIXTURE CATALOG NUMBERS ARE SERIES TYPE ONLY. PROVIDE ALL NECESSARY HARDWARE AS REQUIRED BY THE SPECIFICATIONS, DRAWINGS, AND PROJECT CONDITIONS FOR A COMPLETE AND OPERABLE INSTALLATION.\u003Cbr>3. PRIOR TO ORDERING ANY LIGHTING EQUIPMENT, THE CONTRACTOR SHALL COORDINATE ALL FIXTURE LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND CEILING CAVITY DEPTHS.\u003Cbr>4. CONTRACTOR SHALL VERIFY FIXTURE VOLTAGES AND CEILING TRIM COMPATIBILITY PRIOR TO ORDERING FIXTURE.\u003Cbr>5. PROVIDE APPROVED FIRE-RATED ENCLOSURES FOR ALL LIGHTING FIXTURES LOCATED IN FIRE-RATED CEILINGS.\u003Cbr>6. UPON INITIAL ENERGIZING OF ALL NEW FLUORESCENT LAMPS, A CONTINUOUS PERIOD OF 30 HOURS SHALL OCCUR PRIOR TO DE-ENERGIZING OF LAMPS, FOR MANUFACTURER REQUIRED LAMP BURN-IN AND MAXIMUM LAMP LIFE.\u003Cbr>7. ENSURE COMPATIBILITY OF ALL LIGHTING SYSTEM COMPONENTS SUCH AS DIMMING SYSTEMS. FIXTURES, LAMPS, BALLAST(S), AND DIMMING SYSTEMS/INDIVIDUAL CONTROLS MUST BE FACTORY CERTIFIED COMPATIBLE FOR FULL RANGE OF DIMMING COMPATIBILITY.\u003Cbr>8. PROVIDE CLEARANCES FROM COMBUSTIBLES A MINIMUM OF 1/2'' (OTHER THAN AT POINTS OF SUPPORT) AND 3'' FROM INSULATION FOR RECESSED LIGHTING FIXTURES WHICH MUST BE NON-IC RATED.\u003Cbr>9. PROVIDE A MINIMUM OF TWO (2) \\#12 SUPPORT WIRES ATTACHED TO BUILDING FRAME IN ADDITION TO T-BAR CLIPS FOR FLUORESCENT FIXTURES RECESSED IN SUSPENDED T-BAR CEILING.\u003Cbr>10. PROVIDE (4) SHEET METAL SCREWS, ONE INSTALLED IN EACH CORNER OF THE FIXTURE ATTACHING THE FIXTURE TO THE GRID. SCREWS SHALL NOT BE VISIBLE NOR IMPEDE INSTALLATION OF GRID PANELS.\u003Cbr>11. PROVIDE DOOR-TO-FRAME AND LENS-TO-DOOR GASKETING, INVERTED LENS, AND FOOD SERVICE RATING FOR ALL FIXTURES LOCATED IN FOOD SERVICE AREAS.\u003Cbr>12. LAMPS SHALL BE PROVIDED AND INSTALLED ACCORDING TO THIS FIXTURE SCHEDULE AND PROJECT SPECIFICATIONS. ENSURE COMPATIBILITY BETWEEN FIXTURE, LAMP AND BALLAST(S) .\u003Cbr>13. APPROVED LAMP MANUFACTURERS ARE OSRAM SYLVANIA, GE, VENTURE (METAL HALIDE ONLY), AND PHILLIPS-NO EXCEPTIONS.\u003Cbr>14. FIXTURES SHALL BE ORDERED WITH APPROPRIATE BALLAST(S) THAT HAVE UL AND CBM LABELS. ALL BALLASTS MUST CONFORM TO TITLE 24 REQUIREMENTS FOR PERFORMANCE AND EFFICIENCY.\u003Cbr>15. FLUORESCENT FIXTURES TO BE SUPPLIED WITH \"QUICK DISCONNECT\" SAFETY BALLAST HARDWARE WHICH ARE UL AND CSA CERTIFIED IN ACCORDANCE WITH NEC 410 .73(G) AND CEC 30-308(4) .\u003Cbr>16. FLUORESCENT AND HIGH INTENSITY DISCHARGE BALLASTS SHALL BE ELECTRONIC TYPE. PROVIDE END OF LIFE (EOL) SHUT-DOWN PROTECTION FOR COMPACT FLUORESCENT LAMPS.\u003Cbr>17. FIXTURES, TRIMS, REFLECTORS, AND LAMPS SHALL BE CLEANED FREE FROM DIRT, DUST, LABEL ADHESIVE, AND FINGER PRINTS.\u003Cbr>18. ALL LIGHT FIXTURES SHALL BE MOUNTED AND SUPPORTED IN ACCORDANCE WITH OSHA STANDARDS AND ALL LOCAL, STATE, AND NATIONAL ELECTRICAL CODES. PROVIDE ALL REQUIRED SEISMIC\u003Cbr>19. PROVIDE LIGHT FIXTURE MOUNTING KITS AS REQUIRED TO SUIT THE EXACT TYPE OF CEILING TO WHICH THEY ARE MOUNTED.\u003Cbr>20. COORDINATE FIXTURE AND TRIM FINISHES WITH ARCHITECT PRIOR TO ORDERING.\u003Cbr>21. EACH DIMMED CIRCUIT SHALL CARRY A SEPARATE NEUTRAL CONDUCTOR WITH TRACER COLOR TO MATCH PHASE CONDUCTOR.\u003Cbr>MINIMUM BALLAST AND LAMP COLOR SPECIFICATIONS(U.O. N.)\u003Cbr>LAMP COLOR TEMPERATURE LAMP LIFE CRI BALLAST TYPE BALLAST\u003Cbr>FACTOR MH OR PSMH 4000°K VARIES 65 + MAGNETIC 0.90 CMH 3000°K VARIES 85 + MAGNETIC 0.90 HPS 2000°K VARIES 20 + MAGNETIC 0.90 T5*, T5HO* 3500°K* 20,000 HRS 80 + PROGRAMMED RAPID START 1.00 T8* 3500°K* 20,000 HRS 80 + PROGRAMMED RAPID START 0.90 CFL* 3500°K* 10,000 HRS 80 + PROGRAMMED RAPID START 0.90\u003Cbr>*NOTE:COLOR TEMPERATURE IN CORRIDORS, LOBBIES, AND FRONT-OF-HOUSE AREAS TO BE 3000°K, U. O. N.\u003Cbr>EMERGENCY LIGHTING NOTES:\u003Cbr>1. ALL FIXTURES INDICATED AS EMERGENCY (EM OR SHADED) SHALL BE PROVIDED WITH EMERGENCY BATTERY PACKS. BATTERY PACKS SHALL BE AS FOLLOWS:\u003Cbr>- LINEAR T5 FLUORESCENT LAMPS-BODINE\\#LP600/1250 LU","cbCaisaM8vh4RGtT","https://ap.wps.com/l/cbCaisaM8vh4RGtT","pdf",322204,"English","# Lighting Fixture General Notes\n## Minimum Ballast and Lamp Color Specifications\n## Emergency Lighting Notes\n## Tandem Wiring Notes\n## Substitution Notes","[{\"question\":\"What coordination is required before ordering lighting fixtures?\",\"answer\":\"Coordinate fixture locations with architectural reflected ceiling plans and ceiling cavity depths, and verify fixture voltage and ceiling trim compatibility prior to ordering. Coordinate finishes with the architect before ordering as well.\"},{\"question\":\"What are the general installation and compatibility requirements for lighting systems?\",\"answer\":\"Provide fire-rated enclosures for fixtures in fire-rated ceilings, ensure factory-certified compatibility for dimming systems across fixtures, lamps, ballasts, and controls, and mount fixtures per OSHA and electrical code requirements with required seismic provisions. Maintain specified clearances to combustibles and insulation for non-IC rated recessed lighting.\"},{\"question\":\"How are emergency lighting fixtures and battery packs handled?\",\"answer\":\"Emergency fixtures must include emergency battery packs with specified models and lamp operation durations for linear T5/T8 and compact fluorescent lamps, plus test switch/charge light requirements. Night lights and exit signs must use an unswitched, undimmed “hot” conductor and comply with NEC Article 700.\"}]","Lighting Fixture Schedule - General Notes | PDF"]