[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662659-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662659-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","lift-detail-layouts-1-2-3-tender-amendment-1","LIFT DETAIL LAYOUTS 1, 2 & 3 - Tender Amendment 1","","Architectural lift detail layout drawings for a tender stage, covering lift layouts 1, 2 and 3 with typical plan references across multiple floors. Notes specify document ownership by the architect’s studio, prohibit unauthorized reproduction, require no scaling, and define measurement conventions in millimetres and metres for levels. The drawing instructs reporting discrepancies to the architect, coordinating final lift shaft sizes and slabs with the finalized vendor, and aligning the ground floor plinth level with the main contractor. Revisions are provided with tender issue dates, drawing numbers and project identifiers.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/lift-detail-layouts-1-2-3-tender-amendment-1/662659/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/lift-detail-layouts-1-2-3-tender-amendment-1/662659.png","ImageObject",300,407,{"name":42,"@type":43},"Rhys","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What are the key rules stated in the drawing notes?","Question",{"text":62,"@type":63},"The notes require that the drawing must not be scaled, all dimensions/levels follow the stated units, discrepancies must be reported to the architect, and the drawing should be read alongside related architectural, structural and services documents and specifications.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How are lift shaft sizes and slabs determined?",{"text":67,"@type":63},"Final lift shaft sizes and slabs for clear headroom are to be determined with the finalized vendor.",{"name":69,"@type":60,"acceptedAnswer":70},"How is the ground floor plinth level coordinated?",{"text":71,"@type":63},"The ground floor plinth level must be coordinated with the main contractor.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662659,1793221311,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":30,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":110},687207024643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| LIFT L1 | -LIFT L3\u003Cbr>LIFT L3 | NOTE\u003Cbr>x The drawing is the property of flying elephant studio Architects and unauthorised use or reproduction of the drawing is not permitted without the Architect's permission.\u003Cbr>x The drawing is not to be scaled\u003Cbr>x All dimensions are in millimetres and all levels are in metres unless otherwise indicated.\u003Cbr>x Any discrepancy in the drawing is to be brought to the immediate notice of the Architect.\u003Cbr>x The drawing is to be read in conjunction with all other relevant Architectural, Structural and Services drawings and specifications |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n|  |  | Key Plan / Location\u003Cbr>L2 L3\u003Cbr>L1 |  |  |  |  |\n|  |  | NOTE :\u003Cbr>1. FINAL LIFT SHAFT SIZES AND SLAB FOR CLEAR HEADROOM TOBE DETERMINED WITH FINALIZED VENDOR\u003Cbr>2. GROUND FLOOR PLINTH LEVEL TO BE CO ORDINATED WITH MAIN CONTRACTOR\u003Cbr>3. LEVELS INDICATED ARE SSL. 50 MM ADDITIONAL FOR FLOOR FINISH. |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  | P0 | FOR TENDER |  |  | 22112013 |\n|  |  | Rev No. | Details |  |  | Date |\n|  |  | Consultant 1 |  | MANJUNATH & CO. CONSULTING ENGINEERS\u003Cbr>\\#236, 5TH CROSS, K.G. NAGAR, BANGALORE-560 019\u003Cbr>PH: (080) 26616610, 26616611\u003Cbr>[EMAIL : manjaxe2010@gmail.com](EMAIL : manjaxe2010@gmail.com) |  |  |\n|  |  | Consultant 2 |  | McD BERL follow LAW of LIFE III |  |  |\n|  |  | Mc D Built Environment Research Laboratory Pvt Ltd ,\u003Cbr>Green building,Sustainability and MEP services,\u003Cbr>3rd Floor,CONCORD,\\#1354,9th Cross, 80ft Road,\u003Cbr>33rd Main ,1st Phase, JP Nagar,Bangalore-560 078. Ph:+91 80 41214020 |  |  |  |  |\n|  |  | Drawn : NABILA |  |  | Chkd : IYPE |  |\n|  |  | Scale : 1 : 50 |  |  | Date : 22 11 2013 |  |\n|  |  | Cad Ref : 09-LT-P0 .dwg |  |  | Stage : TENDER |  |\n|  |  | Drawing Title LIFT DETAIL LAYOUTS 1, 2 & 3 |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  | Project |  |  |  |  |\n|  |  | NATIONAL CENTRE FOR SUSTAINABLE |  |  |  |  |\n|  |  | COASTAL MANAGEMENT |  |  |  |  |\n|  |  | ANNA UNIVERSITY , CHENNAI |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  | Drawing No. |  |  | Project No. | Rev No. |\n|  |  | NC-405 |  |  | 13-01 |  |\n\n| \u003Cbr>TYPICAL PLAN -LIFT L4\u003Cbr>\u003Cbr>LOOR\u003Cbr>TYPICAL PLAN FROM THIRD FLOOR PLAN\u003Cbr>GROUNDTO SECOND LIFT L5\u003Cbr>-LIFT L5\u003Cbr>\u003Cbr>| \u003Cbr>\u003Cbr>TYPICAL PLAN FROM GROUNDTO SECOND\u003Cbr>OR -LIFT L6\u003Cbr>THIRD FLOOR PLAN LIFT L6\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>5\u003Cbr>\u003Cbr>7\u003Cbr>\u003Cbr>L1\u003Cbr>\u003Cbr>8\u003Cbr>\u003Cbr>J1\u003Cbr>\u003Cbr>FF\u003Cbr>\u003Cbr>FF\u003Cbr>\u003Cbr>L1\u003Cbr>\u003Cbr>J1\u003Cbr>\u003Cbr>FF\u003Cbr>\u003Cbr>FF\u003Cbr>\u003Cbr>5\u003Cbr>\u003Cbr>7\u003Cbr>\u003Cbr>8 | NOTE\u003Cbr>x The drawing is the property of flying elephant studio Architects and unauthorised use or reproduction of the drawing is not permitted without the Architect's permission.\u003Cbr>x The drawing is not to be scaled\u003Cbr>x All dimensions are in millimetres and all levels are in metres unless otherwise indicated.\u003Cbr>x Any discrepancy in the drawing is to be brought to the immediate notice of the Architect.\u003Cbr>x The drawing is to be read in conjunction with all other relevant Architectural, Structural and Services drawings and specifications |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  | Key Plan / Location |  |  |  |  |  |\n|  |  |  | |  |  |  |  |\n|  |  | NOTE :\u003Cbr>1. FINAL LIFT SHAFT SIZES AND SLAB FOR CLEAR HEADROOM TOBE DETERMINED WITH FINALIZED VENDOR\u003Cbr>2. GROUND FLOOR PLINTH LEVEL TO BE CO ORDINATED WITH MAIN CONTRACTOR\u003Cbr>3. LEVELS INDICATED ARE SSL. 50 MM ADDITIONAL FOR FLOOR FINISH. |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  ","cbCaim03YtgXTnf8","https://ap.wps.com/l/cbCaim03YtgXTnf8","pdf",2664797,"English","# Key Plan / Location\n## Drawing Notes and Requirements\n## Tender Revision Information\n## Drawing Title and Project Identifiers","[{\"question\":\"What are the key rules stated in the drawing notes?\",\"answer\":\"The notes require that the drawing must not be scaled, all dimensions/levels follow the stated units, discrepancies must be reported to the architect, and the drawing should be read alongside related architectural, structural and services documents and specifications.\"},{\"question\":\"How are lift shaft sizes and slabs determined?\",\"answer\":\"Final lift shaft sizes and slabs for clear headroom are to be determined with the finalized vendor.\"},{\"question\":\"How is the ground floor plinth level coordinated?\",\"answer\":\"The ground floor plinth level must be coordinated with the main contractor.\"}]","LIFT DETAIL LAYOUTS 1, 2 & 3 - Tender Amendment 1 | PDF"]