[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-665488-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-665488-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","level-2-design-navigation-electrical-system-requirements","Level 2 Design Navigation - Electrical System Requirements","","This document outlines the mandatory electrical design specifications and labeling requirements for solar photovoltaic projects connected to the grid. It mandates critical labeling for DC system size, nameplate ratings, export capacity, and POI coordinates, while providing clear directives for utility-accessible equipment like GOAB switches and reclosers. The guidelines emphasize strict circuit protection protocols, including the placement of line protection near the Point of Common Coupling (PCC) and specific recloser configurations based on power capacity thresholds (e.g., projects >500kW). Additionally, the document mandates that all site plans must maintain consistency in design documentation, requiring Professional Engineer (PE) stamps for projects exceeding 50kW. By ensuring adherence to these safety standards and communication equipment protocols, the document facilitates system reliability and regulatory compliance for developers, utility providers, and electrical installation teams.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/level-2-design-navigation-electrical-system-requirements/665488/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/level-2-design-navigation-electrical-system-requirements/665488.png","ImageObject",300,407,{"name":42,"@type":43},"Stanley","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What specific equipment must be placed after the GOAB switch pole?","Question",{"text":62,"@type":63},"A recloser must be placed immediately following the GOAB switch pole to ensure proper electrical protection and utility-required isolation standards.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What are the recloser requirements for projects exceeding 500kW?",{"text":67,"@type":63},"Projects larger than 500kW require two reclosers: one owned by the utility (Versant) and one owned by the customer.",{"name":69,"@type":60,"acceptedAnswer":70},"When is a professional engineer (PE) stamp required on design documents?",{"text":71,"@type":63},"A PE stamp is required for all project site plans and associated design documents for projects exceeding 50kW in capacity.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},665488,1793304488,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},2336477405376,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| LABEL THE FOLLOWING-ENSURE CONSISTENCY THROUGHOUT\u003Cbr>DC SYSTEM SIZE:\u003Cbr>NAMEPLATE RATING:\u003Cbr>EXPORT CAPACITY:\u003Cbr>POI POLE NUMBER:\u003Cbr>POI COORDINATES:\u003Cbr>CIRCUIT \\#:\u003Cbr>INSTALLER/ ELECTRICAN NOTE:\u003Cbr>ENSURE A PATTERN OF INVERTERS IS CLEARLY ESTABLISHED\u003Cbr>GOAB TO BE LABELED 24HR ACCESSIBLE AND LOCKABLE BY UTILITY AT ALL TIMES (IF APPLICABLE)\u003Cbr>SHOW A NOTE INDICATING VOLTAGE MEASURMENT ACCURACY CANNOT EXCEED +/-1%\u003Cbr>PCC (POINT OF COMMON COUPLING) TO BE CLEARLY LABELED\u003Cbr>LINE PROTECTION MUST BE PLACED AT BEGINING OF THE LINE AND CLOSE TO PCC\u003Cbr>RECLOSER MUST BE PLACED RIGHT AFTER GOAB SWITCH POLE\u003Cbr>EQUIPMENT NAME AND QTTY:\u003Cbr>RECLOSER MUST BE PLACED RIGHT AFTER GOAB SWITCH POLE\u003Cbr>-Projects >500kW require two reclosers. One Versant Owned and one Customer owned\u003Cbr>-String inverters \u003C500kW and >250kW require one customer owned recloser\u003Cbr>NOTE: Versant reserves the right to require additional protection and/or communication equipment as needed to maintain safety standards and system reliability regardless of the project's Nameplate Rating. | ALL NOTES HERE ARE APPLICABLE TO PROJECT SITE PLAN. PLEASE ENSURE CONSISTENCY ACROSS DESIGN DOCUMENTS.\u003Cbr>METER \\# | DEVELOPER REVISIONS DESCRIPTION DATE REV (PE STAMP REQUIRED FOR PROJECTS OVER 50KW) PROJECT NAME & ADDRESS DRAWN BY SHEET NAME ELECTRICAL LINE\u003Cbr>DIAGRAM SHEET SIZE SHEET NUMBER |  |\n| --- | --- | --- | --- |","cbCailBsPN3GRDLf","https://ap.wps.com/l/cbCailBsPN3GRDLf","pdf",1561370,"English","# Design Requirements\n## Labeling and Site Documentation\n## Equipment and Protection Standards","[{\"question\":\"What specific equipment must be placed after the GOAB switch pole?\",\"answer\":\"A recloser must be placed immediately following the GOAB switch pole to ensure proper electrical protection and utility-required isolation standards.\"},{\"question\":\"What are the recloser requirements for projects exceeding 500kW?\",\"answer\":\"Projects larger than 500kW require two reclosers: one owned by the utility (Versant) and one owned by the customer.\"},{\"question\":\"When is a professional engineer (PE) stamp required on design documents?\",\"answer\":\"A PE stamp is required for all project site plans and associated design documents for projects exceeding 50kW in capacity.\"}]","Level 2 Design Navigation - Electrical System Requirements | PDF"]