[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-499555-105":3,"doc-detail-499555-en":81,"detail-sidebar-cat-0-en-105":169},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","lcff-budget-overview-for-parents-bay-area-technology-school-local-control-and-accountability-plan-lcap-2019-20","LCFF Budget Overview for Parents - Bay Area Technology School - Local Control and Accountability Plan (LCAP) 2019-20","","LCFF Budget Overview for Parents explains how Bay Area Technology School plans to receive and spend funds under California’s Local Control Funding Formula for the 2019-20 LCAP year. The projected total general purpose revenue is $4,192,848, including $2,001,797 in LCFF, with allocations based on enrollment of foster youth, English learners, and low-income students. It also outlines spending priorities, what is included in the LCAP versus not included, and how increased or improved services for high needs students will be funded and demonstrated.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/lcff-budget-overview-for-parents-bay-area-technology-school-local-control-and-accountability-plan-lcap-2019-20/499555/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/lcff-budget-overview-for-parents-bay-area-technology-school-local-control-and-accountability-plan-lcap-2019-20/499555.png","ImageObject",300,407,{"name":42,"@type":43},"Margaret","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-03","2026-10-03",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",9,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the total projected revenue for Bay Area Technology School in 2019-20?","Question",{"text":63,"@type":64},"The projected total general purpose revenue is $4,192,848, comprised of $2,001,797 in LCFF, $1,640,216 in other state funds, $70,739 in local funds, and $480,096 in federal funds.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How much of the LCFF amount is generated based on high needs student enrollment?",{"text":68,"@type":64},"Of the $2,001,797 in LCFF funds, $603,281 is generated based on enrollment of foster youth, English learners, and low-income students.",{"name":70,"@type":61,"acceptedAnswer":71},"How does the plan address increased or improved services for high needs students in 2019-20?",{"text":72,"@type":64},"The school must demonstrate that planned actions and services increase or improve services for high needs students compared to all students in proportion to the increased funding. For 2019-20, it plans to spend $687,256 on actions to meet this requirement.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},499555,1791118718,{"code":4,"msg":82,"data":83},"success",{"doc_id":79,"user_id":84,"nickname":42,"user_avatar":85,"doc_module":4,"category_id":86,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":87,"file_id":88,"file_url":89,"file_type":90,"file_size":91,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":92,"language":93,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":94,"faqs":95,"seo_title":96,"seo_description":12,"update_tm":97,"read_time":98,"preview_page_count":99,"preview_urls":100},137451207643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2",8,"LCFF Budget Overview for Parents  \nLocal Educational Agency (LEA) Name: Bay Area Technology School  \nCDS Code: 01 61259 0106906  \nLocal Control and Accountability Plan (LCAP) Year: 2019-20  \nLEA contact information: Seth Feldman, Executive Director/Principal  \nSchool districts receive funding from different sources: state funds under the Local Control Funding Formula (LCFF), other state funds, local funds, and federal funds. LCFF funds include a base level of funding for all LEAs and extra funding-called \"supplemental and concentration\" grants-to LEAs based on the enrollment of high needs students (foster youth, English learners, and low-income students) .  \nBudget Overview for the 2019-20 LCAP Year  \nThis chart shows the total general purpose revenue Bay Area Technology School expects to receive in  \nthe coming year from all sources.  \nThe total revenue projected for Bay Area Technology School is $4,192,848, of which $2,001,797 is Local Control Funding Formula (LCFF), $1,640,216 is other state funds, $70,739 is local funds, and $480,096 is federal funds. Of the $2,001,797 in LCFF Funds, $603,281 is generated based on the enrollment of high needs students (foster youth, English learner, and low-income students) .  \nLCFF Budget Overview for Parents  \nThe LCFF gives school districts more flexibility in deciding how to use state funds. In exchange, school districts must work with parents, educators, students, and the community to develop a Local Control and Accountability Plan (LCAP) that shows how they will use these funds to serve students.  \nThis chart provides a quick summary of how much Bay Area Technology School plans to spend for 2019- 20. It shows how much of the total is tied to planned actions and services in the LCAP.  \nBay Area Technology School plans to spend $$4,076,953 for the 2019-20 school year. Of that amount,$2,440,036 is tied to actions/services in the LCAP and $1,636,917 is not included in the LCAP. The budgeted expenditures that are not included in the LCAP will be used for the following:  \nSpecial Education, utilities, educational supplies paid by restricted funds such as lottery, CSI, middle grades electives paid by Measure g, and Title I. In addition, this LCAP does not include copier and all other leases, some management and classified salaries, personnel benefits, back office contracts, building repairs and facilities leases, legal fees, audit and other general services, and technology infrastructure along with communication/internet services. Also not included are components of the NSLP and the after school program.  \nIncreased or Improved Services for High Needs Students in 2019-20  \nIn 2019-20, Bay Area Technology School is projecting it will receive $603,281 based on the enrollment of foster youth, English learner, and low-income students. Bay Area Technology School must demonstrate the planned actions and services will increase or improve services for high needs students compared to the services all students receive in proportion to the increased funding it receives for high needs students. In the LCAP, Bay Area Technology School plans to spend $687,256 on actions to meet this requirement.  \nLCFF Budget Overview for Parents  \nUpdate on Increased or Improved Services for High Needs Students in 2018-19  \nThis chart compares what Bay Area Technology School budgeted last year in the LCAP for actions and services that contribute to increasing or improving services for high needs students with what Bay Area Technology School estimates it has spent on actions and services that contribute to increasing or improving services for high needs students in the current year.  \nIn 2018-19, Bay Area Technology School's LCAP budgeted $247,114 for planned actions to increase or improve services for high needs students. Bay Area Technology School estimates that it will actually spend $247,114 for actions to increase or improve services for high needs students in 2018-19.  \nLCAP Year (select from 2017-18, 2018-19, 2019","cbCaimeIYZeIq8Ml","https://ap.wps.com/l/cbCaimeIYZeIq8Ml","pdf",7211771,148,"English","# LCFF Budget Overview for Parents\n## Bay Area Technology School: projected 2019-20 revenue\n## LCFF funds and flexibility for districts\n## Planned 2019-20 expenditures included in the LCAP\n## Expenditures not included in the LCAP\n## Increased or Improved Services for High Needs Students in 2019-20\n## Update on services for high needs students in 2018-19\n## LCAP year selection (2017-18, 2018-19, 2019-20)","[{\"question\":\"What is the total projected revenue for Bay Area Technology School in 2019-20?\",\"answer\":\"The projected total general purpose revenue is $4,192,848, comprised of $2,001,797 in LCFF, $1,640,216 in other state funds, $70,739 in local funds, and $480,096 in federal funds.\"},{\"question\":\"How much of the LCFF amount is generated based on high needs student enrollment?\",\"answer\":\"Of the $2,001,797 in LCFF funds, $603,281 is generated based on enrollment of foster youth, English learners, and low-income students.\"},{\"question\":\"How does the plan address increased or improved services for high needs students in 2019-20?\",\"answer\":\"The school must demonstrate that planned actions and services increase or improve services for high needs students compared to all students in proportion to the increased funding. For 2019-20, it plans to spend $687,256 on actions to meet this requirement.\"}]","LCFF Budget Overview for Parents - Bay Area Technology School - Local Control and Accountability Plan (LCAP) 2019-20 | PDF",1790999561,373,15,[101,105,109,113,117,122,127,132,136,140,145,150,155,160,165],{"page_no":22,"url":102,"width":103,"height":104},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/f0fc0da059b95348a38b0624c761ae43.webp",983,1272,{"page_no":26,"url":106,"width":107,"height":108},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/7ebc720c9a735518e916a91cdb6441a7.webp",982,1270,{"page_no":30,"url":110,"width":111,"height":112},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/363c279d4e6d7ad2376de27a73d0f01b.webp",981,1269,{"page_no":33,"url":114,"width":115,"height":116},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/e84c5a41cd5e4ff30905f0c06c60a178.webp",980,1268,{"page_no":118,"url":119,"width":120,"height":121},5,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a07560e8bc6a258f38b8944196f3209e.webp",979,1267,{"page_no":123,"url":124,"width":125,"height":126},6,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/503445051e23101b68923dfd72904d32.webp",978,1265,{"page_no":128,"url":129,"width":130,"height":131},7,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/dbcda697f41b1d0ac49719dd0b84fa5a.webp",977,1264,{"page_no":86,"url":133,"width":134,"height":135},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1cc1539932b2d740a8a452f77cf8c9d3.webp",976,1263,{"page_no":55,"url":137,"width":138,"height":139},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/6f65773893cce7b353b16c26c2098c6e.webp",975,1261,{"page_no":141,"url":142,"width":143,"height":144},10,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/165fd22e4c80e711e8e96c678caaa0e2.webp",974,1260,{"page_no":146,"url":147,"width":148,"height":149},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/28057094356f29a0e23040bb6912e10d.webp",973,1259,{"page_no":151,"url":152,"width":153,"height":154},12,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/43341111f30d8dde9df84cee95762bae.webp",972,1257,{"page_no":156,"url":157,"width":158,"height":159},13,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/5186ae91b42561493d3f916a577e9613.webp",971,1256,{"page_no":161,"url":162,"width":163,"height":164},14,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c249ce08a2e629cd7925f4b85df8cb19.webp",970,749,{"page_no":99,"url":166,"width":167,"height":168},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/fa3708d3cf4d0c9436034da3b6392bd7.webp",969,748,{"code":4,"msg":82,"data":170},[171,175,179,183,187,191,195,198,202,205,208],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":172,"show_sort_weight":173,"slug":174},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":176,"show_sort_weight":177,"slug":178},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":180,"show_sort_weight":181,"slug":182},"Exam",70,"exam",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":184,"show_sort_weight":185,"slug":186},"Comic",60,"comic",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":188,"show_sort_weight":189,"slug":190},"Technology",50,"technology",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":192,"show_sort_weight":193,"slug":194},"Healthcare",40,"healthcare",{"id":86,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":196,"slug":197},30,"research-report",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":199,"show_sort_weight":200,"slug":201},"Religion & Spirituality",20,"religion-spirituality",{"id":200,"doc_module":4,"doc_module_name":25,"category_name":203,"show_sort_weight":200,"slug":204},"World Cup","world-cup",{"id":141,"doc_module":4,"doc_module_name":25,"category_name":206,"show_sort_weight":141,"slug":207},"Lifestyle","lifestyle",{"id":209,"doc_module":4,"doc_module_name":25,"category_name":210,"show_sort_weight":118,"slug":211},19,"General","general"]