[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664198-105":59,"doc-detail-664198-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","keyo-building-electrical-service-upgrade-construction-documents-january-5-2026","KEYO Building Electrical Service Upgrade - Construction Documents - January 5, 2026","","Construction documents for the University of Maine KEYO Building Electrical Service Upgrade in Orono, Maine, dated January 5, 2026. The package provides a list of drawings spanning general, civil, mechanical, and electrical disciplines, including site plans, utility and erosion control notes, ductwork and power/system floor plans, symbols and abbreviations, demolition plan items, and diagram and detail sheets. Drawing sheets include contractor coordination, verification, utility handling, sediment removal, and grading/drainage requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/keyo-building-electrical-service-upgrade-construction-documents-january-5-2026/664198/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/keyo-building-electrical-service-upgrade-construction-documents-january-5-2026/664198.png","ImageObject",300,407,{"name":92,"@type":93},"Hazel","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project and location do these construction documents cover?","Question",{"text":112,"@type":113},"They cover the KEYO Building electrical service upgrade for the University of Maine in Orono, Maine, dated January 5, 2026.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What types of drawings are included in the document set?",{"text":117,"@type":113},"The set includes general drawings, civil drawings (site notes, erosion control, site layout, utilities, details), mechanical drawings (legend, general notes, ductwork), and electrical drawings (symbols/abbreviations, plans, demolition, diagrams, and details).",{"name":119,"@type":110,"acceptedAnswer":120},"What contractor verification and coordination requirements are stated?",{"text":121,"@type":113},"The documents require verifying site conditions (including test pits) and utility function/material/current activity, coordinating utility work with utility companies and local/state departments, and reporting discrepancies to the architect before proceeding.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664198,1793243923,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":36},137441390410,"https://ap-avatar.wpscdn.com/avatar/2000252f4ab5702993?_k=1776741390130283984","| KEYO BUILDINGELECTRICAL SERVICEUPGRADE  \u003Cbr>CONSTRUCTION DOCUMENTS  \u003Cbr>JANUARY 5, 2026   | LIST OF DRAWINGS  \u003Cbr>GENERAL DRAWINGS  \u003Cbr>G00-1 COVER SHEET  \u003Cbr>CIVIL DRAWINGS  \u003Cbr>C00-1 SITE NOTES  \u003Cbr>C00-2 SITE EROSION CONTROL NOTES  \u003Cbr>C10-1 EXISTING SITE CONDITIONS AND DEMOLITION PLANC20-1 SITE LAYOUT PLAN  \u003Cbr>C40-1 SITE UTILITY PLAN  \u003Cbr>C50-1 SITE DETAILS  \u003Cbr>MECHANICAL DRAWINGS  \u003Cbr>M00-1 LEGEND & GENERAL NOTESM10-1 FIRST FLOOR DUCTWORK  \u003Cbr>ELECTRICAL DRAWINGS  \u003Cbr>E00-1 SYMBOLS AND ABBREVIATIONSE05-0 BASEMENT FLOOR PLAN DEMOLITION  \u003Cbr>E20-0 BASEMENT FLOOR PLAN POWER AND SYSTEMS  \u003Cbr>E50-1 DIAGRAMS  \u003Cbr>E50-2 DIAGRAMS  \u003Cbr>E70-1 DETAILS  \u003Cbr>E80-1 SITE PLAN   |\n| --- | --- |\n\nUNIVERSITY OF MAINEKEYO BUILDINGELECTRICAL SERVICEUPGRADE  \nORONO, MAINE  \n\n| Harriman Project No.   | 24265   |\n| --- | --- |\n\n\n| Graphic Scale  \u003Cbr>0\" 1\"  \u003Cbr>\u003Cbr>(scale measures 1\" when plotted at full size)   |\n| --- |\n\n# CONSTRUCTION DOCUMENTS\n\nJANUARY 5, 2026  \nRevision Date Revision Description  \nDrawn by: PRA  \nCOVER SHEET  \nG00-1  \n\n|  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| 1. THE ACCURACY AND COMPLETENESS OF SUBSURFACE INFORMATION IS NOT GUARANTEED. VERIFY SITE CONDITIONS INCLUDING TEST PITS FOR LOCATIONS ANDINVERTS OF UTILITIES AND REPORT ANY DISCREPANCIES TO ARCHITECT PRIOR TO PROCEEDING WITH THAT PORTION OF THE WORK.  \u003Cbr>2. SEDIMENT SHALL BE REMOVED FROM NEW STORM DRAINS AND CATCH BASINS, AND ALSO FROM EXISTING STORM DRAINS AND CATCH BASINS THAT DIRECTLYRECEIVE RUNOFF FROM THE WORK AREA.  \u003Cbr>3. COORDINATE WORK ON UTILITY LINES OR WITHIN ROAD RIGHT-OF-WAY WITH THE UTILITY COMPANIES, LOCAL ROAD DEPARTMENT, AND STATE DOT.  \u003Cbr>4. SLOPE CONDUITS AWAY FROM BUILDING TO HANDHOLE OR UTILITY POLE TO AVOID GROUND WATER SEEPAGE INTO BUILDING.  \u003Cbr>5. PRIOR TO REMOVAL OF UTILITIES, VERIFY UTILITY FUNCTION, MATERIAL, USE, AND CURRENT ACTIVITY. REPORT DISCREPANCIES TO THE ARCHITECT FORDIRECTION PRIOR TO COMMENCING THE WORK ON THAT UTILITY.  \u003Cbr> C1    |  |  |  |  | 1. THE LANDSCAPE CONTRACTOR SHALL SUPPLY AND INSTALL ALL PLANTS IN SUFFICIENT QUANTITIES TO COMPLETE WORK AS SHOWN ON THE DRAWINGS.DISCREPANCIES BETWEEN QUANTITIES SHOWN ON THE DRAWING AND THE PLANT LIST SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT AND SHALL NOTENTITLE THE CONTRACTOR TO ADDITIONAL COMPENSATION.  \u003Cbr>2. THE LANDSCAPE CONTRACTOR IS ADVISED THAT BOTH ABOVE AND BELOW GROUND UTILITIES MAY EXIST ON THE SITE, THE LOCATIONS OF WHICH SHALL BEVERIFIED BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF HIS OPERATIONS. SHOULD THE LOCATION OF ANY PROPOSED PLANTING CONFLICT WITH ANYUTILITY, THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY.  \u003Cbr>3. PAVING, CURBING, UTILITIES, GRASS, ETC. , DAMAGED AS A RESULT OF THE LANDSCAPE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED AT NOADDITIONAL COST TO THE OWNER.  \u003Cbr> C3    |  |  |  |\n| EXISTING  \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>BIT. PVMT  \u003Cbr>CONC.  \u003Cbr>  X   X    \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>     98       \u003Cbr>x 99.8  \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>SD  \u003Cbr>UD  \u003Cbr>S  \u003Cbr>S  \u003Cbr>FM  \u003Cbr>W  \u003Cbr>W  \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>UGSTGT  \u003Cbr>UC  \u003Cbr>UE  \u003Cbr>\u003Cbr>  AE    \u003Cbr>| BUILDINGDOORBIT. PAVEMENTCONCRETECURBCHAIN-LINK FENCEHAND RAIL / OTHER FENCEGUIDE RAIL / STOCKADEFENCESTEEL GUARDRAILSIGNPIPE BOLLARDWETLAND LIMITSTREAM CENTERLINETREESTREE LINECONTOURSPOT ELEVATIONGRADE TO DRAINSOIL BORING, TEST PITSILT FENCE  \u003Cbr>BARK / STONE CHECK DAMRIP-RAPCATCH BASIN / DRAININLETSTEAM MANHOLESTORM DRAIN MANHOLESEWER MANHOLETELEPHONE MANHOLEELECTRIC MANHOLE /PULLBOXWATER VALVECURB STOP VALVEHYDRANTUTILITY POLEGUY WIRELIGHT POLE BASELIGHT BOLLARDFLAG POLETRANSFORMER PADGEOTHERMAL WELLSTORM DRAIN LINEUNDER DRAIN LINESANITARY SEWER LINEFORCE MAIN LINEWATER LINEGAS / PROPANE LINESTEAM LINE  \u003Cbr>GEOTHERMAL WATER LINEUNDERGROUNDCOMMUNICATION LINE  \u003Cbr>UNDERGROUND  \u003Cbr>UNDERGROUND LIGHTINGLINE  \u003Cbr>AERIAL ELECTRICAL,TELEPHONE, AND CABLE  \u003Cbr>LINEPROPERTY LINESETBACK LINEEASEMENT LINENOT IN CONTRACT   | NEW  \u003Cbr>\u003Cbr>\u003Cbr>\u003C","cbCaiuUjKHyK3xpb","https://ap.wps.com/l/cbCaiuUjKHyK3xpb","pdf",6518010,16,"English","# Construction Documents\n## List of Drawings\n## General and Civil Drawing Notes\n## Electrical Drawing Index\n## Symbols and Abbreviations","[{\"question\":\"What project and location do these construction documents cover?\",\"answer\":\"They cover the KEYO Building electrical service upgrade for the University of Maine in Orono, Maine, dated January 5, 2026.\"},{\"question\":\"What types of drawings are included in the document set?\",\"answer\":\"The set includes general drawings, civil drawings (site notes, erosion control, site layout, utilities, details), mechanical drawings (legend, general notes, ductwork), and electrical drawings (symbols/abbreviations, plans, demolition, diagrams, and details).\"},{\"question\":\"What contractor verification and coordination requirements are stated?\",\"answer\":\"The documents require verifying site conditions (including test pits) and utility function/material/current activity, coordinating utility work with utility companies and local/state departments, and reporting discrepancies to the architect before proceeding.\"}]","KEYO Building Electrical Service Upgrade - Construction Documents - January 5, 2026 | PDF"]