[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662673-105":59,"doc-detail-662673-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","key-terms-and-acronyms-6","Key Terms and Acronyms - 6","","Glossary-style reference defining key construction, design, and facilities management terms and acronyms. Entries explain regulatory and governance concepts like ADA and AHJ, professional roles such as AIA, and operational systems including AiM and BAS. It also covers budgeting and contracting mechanics—allowances, alternates, base scope, bid alternates, bidding, ASR, and assumptions—describing how scope, cost, and approvals are handled across charter, design, and construction phases.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/key-terms-and-acronyms-6/662673/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/key-terms-and-acronyms-6/662673.png","ImageObject",300,407,{"name":92,"@type":93},"Melati","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does ADA mean in this document?","Question",{"text":112,"@type":113},"ADA refers to civil rights laws related to accessibility. It also notes how these laws influence other federal and local requirements affecting universal access and design decisions.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is an AHJ and how is it described?",{"text":117,"@type":113},"AHJ stands for Authority Having Jurisdiction, the entity with final building and life/safety code enforcement authority. The document states the local AHJ is typically the City of Eugene.",{"name":119,"@type":110,"acceptedAnswer":120},"How do alternates and bid alternates relate to the base scope?",{"text":121,"@type":113},"Alternates are items outside the authorized budget but prioritized from the charter and identified outside the base scope. Bid alternates are additive or deductive packages used to provide pricing flexibility and achieve budget alignment depending on whether bids come in above or below expectations.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662673,1793221525,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":52,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},962085570644,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","| Term or Acronym | Definition |\n| --- | --- |\n| ADA | Americans with Disabilities Act refers to civil rights laws surrounding accessibility issues, which governs and/or influences the federal Rehabilitation Act, Oregon building code, and Campus Plan policies (see Universal Access/Universal Design) . Many design elements are developed within these sets of laws. |\n| AHJ | Authority Having Jurisdiction. This is a term used to describe the entity having final building (and life/safety) code enforcement authority such as the state, federal, or local authority. Typically our AHJ is the City of Eugene. |\n| AIA | American Institute of Architects. A professional organization for architects in the design industry. This organization also supplies many types of contract related documents and guidelines used in the industry. |\n| AiM | AiM is a asset (equipment) and work management system developed by Asset Works that manages property, space, and asset (equipment) management information into a real‐time database. Both Facilities Management and Design and Construction utilize this system to track new and existing assets and manage asset maintenance cycles. AiM is also used as a capital project management tool to generate and manage project budgets, reports and a host of similar activities. |\n| Allowances | Allowances are used within a estimate or budget to allocate funding to an element that has yet tobe fully defined or developed. Allowances are used to be a safeguard so these elements are not overlooked or forgotten within a estimate or budget review.\u003Cbr>In a CMGC contact, allowance amounts can be show within the GMP to address uncertain work asthe project progresses. Allowances are developed between contractor, designer, and Owner. |\n| Alternates | Elements taken into the Design Process from the Charter that were defined as Wants but are outside the Authorized Budget. These items will be prioritized and identified outside of the Base Scope. Alternates should be limited to a reasonable number, as excessive numbers of Alternatescan adversely impact the bidding results due to added complexity. It would be suggested that the total value of the Alternates do not exceed 10% of the value of the Base Scope. |\n| ASR | Additional Service Request. This is a contractual change process within the design team contract resulting from added design scope within the project process. An ASR can be issued during the design and/or construction phases resulting from true scope changes or/and unforeseen field issue during construction that require additional design. |\n| Assumptions | Budget Authorized by the Leadership Unit’s Budget Authority in response to Budget Range provided in the Charter. This will establish the budget for the remainder of the development of the project. Any change to this budget will require the execution of a Scope Change Authorization Form. |\n| BAS | Building Automation System. The electronic controls which run the HVAC and possibly other systems. DDC, which is part of the BAS. |\n| Base Scope | As the Charter is completed, the project Needs will define the Base Scope for the Design Team to address during the Design Process. Additionally, Risk Items that are identified during the Charter development will be assessed and determined whether they are required to become part of the Base Scope in order to support a successful outcome for the project. Highly prioritized project Wants defined during Charter development that fit within the Authorized Project Budget may also be included as Base Scope with the remaining Wants being defined as Alternates. |\n| Bid Alternate | Bid alternates are additive or deductive scope packages that supplement the base scope being bid for contractor pricing. This is an approach to provide bidding flexibility and options to the client atthe time of receiving bids. If the base bid comes in lower than anticipated, often additive bid alternates are added to the base bid to enrich the project. In the event the base ","cbCaiutDELSZGQ4d","https://ap.wps.com/l/cbCaiutDELSZGQ4d","pdf",222494,"English","# Term Definitions\n## Design, Compliance, and Governance\n## Project Delivery, Budgeting, and Contracting","[{\"question\":\"What does ADA mean in this document?\",\"answer\":\"ADA refers to civil rights laws related to accessibility. It also notes how these laws influence other federal and local requirements affecting universal access and design decisions.\"},{\"question\":\"What is an AHJ and how is it described?\",\"answer\":\"AHJ stands for Authority Having Jurisdiction, the entity with final building and life/safety code enforcement authority. The document states the local AHJ is typically the City of Eugene.\"},{\"question\":\"How do alternates and bid alternates relate to the base scope?\",\"answer\":\"Alternates are items outside the authorized budget but prioritized from the charter and identified outside the base scope. Bid alternates are additive or deductive packages used to provide pricing flexibility and achieve budget alignment depending on whether bids come in above or below expectations.\"}]","Key Terms and Acronyms - 6 | PDF",25]