[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-489123-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-489123-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","key-decision-point-kdp-meeting-and-decision-memorandum-dm-guidance","Key Decision Point(KDP)Meeting and Decision Memorandum(DM)Guidance","","Agency Program Management Council(APMC)guidance defines how Key Decision Point(KDP)meetings and subsequent Decision Memorandum(DM)materials should be prepared and reviewed. Established in March 2015, the Program Performance Integration Meeting(PPIM)improves integrated performance assessment and streamlined Baseline Performance Review(BPR)reporting. The guidance instructs Mission Directorates to submit a succinct, consistent KDP presentation package covering program scope, partner contributions, integrated schedule, life-cycle cost logic paths, assumptions, deltas from prior DMs, closure of action items, and validation of readiness for subsequent mission phases.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/key-decision-point-kdp-meeting-and-decision-memorandum-dm-guidance/489123/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/key-decision-point-kdp-meeting-and-decision-memorandum-dm-guidance/489123.png","ImageObject",300,407,{"name":42,"@type":43},"Mary Man","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-26","2026-10-01",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of the KDP DM guidance for the APMC?","Question",{"text":62,"@type":63},"It provides policy guidance for Mission Directorates to prepare succinct, decision-ready materials in advance of APMC deliberation and signing of the KDP DM.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What key information should be included in the KDP presentation package?",{"text":67,"@type":63},"The package should cover program/project content and scope, partner contributions, mission schedule with margin, the logic path between life-cycle cost and DM commitments, key assumptions, deltas from prior DMs, closure validation of prior action items, and readiness evidence for the next mission phase.",{"name":69,"@type":60,"acceptedAnswer":70},"What change is recommended to the KDP DM template?",{"text":71,"@type":63},"Require inclusion of the Project Manager's signature, currently treated as optional, because the DM includes the Management Agreement that defines the Project Manager's control, authority, and accountability.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},489123,1790820731,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":123,"preview_page_count":33,"preview_urls":143},7421720224475,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Agency Program Management Council(APMC)Membership  \nTO:  \nFROM:  \nAssociate Administrator  \n# SUBJECT:Key Decision Point(KDP)Meeting and Decision Memorandum(DM)Guidance\n\nBackground  \nIn March 2015,a monthly Program Performance Integration Meeting (PPIM)was establishedas a forum for key players to discuss integrated improvements in program/projectperformance assessment.Chaired by Deputy Associate Administrator Lesa Roe,the PPIMincludes representation from all Mission Directorates,OCE,OSMA,OCFO/SID,Office ofEvaluation,and Council staff.Most recently,the efforts of this group resulted in improvedand streamlined Baseline Performance Review(BPR)reporting,initiated at the August 2015BPR.The PPIM working group continues to address topics related to better stewardship ofour programs and projects.To that end,their work on the Key Decision Point(KDP)meetingand associated Decision Memorandum(DM)warrants establishment of policy guidance forthe Agency as follows:  \n## 1.KDP Presentation and Supporting Materials\n\nCurrently,KDP meetings governed by the Agency Program Management Council(APMC)includes presentations and discussion from the program/project under review and theassociated independent assessment.Following this interchange,a KDP DM is displayed,withlimited insight into the commitments under recommendation.To better inform the APMCmembership,this guidance instructs Mission Directorates to prepare a succinct set ofmaterials to present to the APMC in advance of deliberating and signing the KDP DM.Thiscore set of information is intended to provide a basis for the mission commitments.TheMission Directorates should provide this information as part of the KDP presentationpackage:  \na.Description of Program/Project content and scope aligned to DM.Descriptionshould reflect the mission content(functional capability)at that point in the lifecycle for which the commitment in the DM is being made.Such contentdescription should be consistent with other official documents,such as theProgram Commitment Agreement (PCA),Congressional Justification(CJ),etc.  \nb.Starting at KDP-B,contributions from other partnering organizations,such asMission Directorates,international partners,other government agencies,andcommercial or academic partners.  \nc.Mission schedule providing reference for schedule commitment in DM,including the schedule margin at the time of the commitment.Missionschedule information should refer to the Integrated Master Schedule.  \nd.Logic path between the project's Life-Cycle Cost (LCC)and the cost andschedule commitment in the DM,including:  \ni.A logic path for the Mission Directorate's recommended costcommitment included in the DM.The presentation should discuss whythe Mission Directorate is recommending their cost and schedulevalue(s),including basis of estimate and analysis performed at KDP;consideration of project's reported cost and schedule(and explanationof differences);and consideration of the independent assessment ofcost and schedule.In simple terms:Explain what's in DM versus whatproject is showing versus what the independent assessor said about costand schedule.  \nii.Discuss the Management Agreement(MA)as based on the most recentPresident's Budget Request (PBR).  \ne.A list of the key assumptions that appear in the DM.  \nf.Explanation of deltas from previous KDP DMs,for example change in missionscope/content or cost and schedule or any assumptions documented in DMs.  \ng.Validation that prior action items from earlier APMC meetings or KDPs areaddressed for closure.  \nThis additional information in support of the KDP DM augments the current KDP briefingcontent which contains appropriate information to demonstrate the program/project has metrequirements and/or achieved a necessary level of maturity (as specified in 7120.5,7123,etc.)and is ready to proceed to the next phase of the mission life cycle.Supporting materials forthe KDP decision process are documented in the NASA Space Flight Program and ProjectManagement Handbook,NASA/","cbCaifW6iIPN7R2x","https://ap.wps.com/l/cbCaifW6iIPN7R2x","pdf",147099,"English","# Key Decision Point(KDP)Meeting and Decision Memorandum(DM)Guidance\n## 1. KDP Presentation and Supporting Materials\n## 2. KDP Decision Memorandum\n## 3. KDP Roles and Responsibilities","[{\"question\":\"What is the purpose of the KDP DM guidance for the APMC?\",\"answer\":\"It provides policy guidance for Mission Directorates to prepare succinct, decision-ready materials in advance of APMC deliberation and signing of the KDP DM.\"},{\"question\":\"What key information should be included in the KDP presentation package?\",\"answer\":\"The package should cover program/project content and scope, partner contributions, mission schedule with margin, the logic path between life-cycle cost and DM commitments, key assumptions, deltas from prior DMs, closure validation of prior action items, and readiness evidence for the next mission phase.\"},{\"question\":\"What change is recommended to the KDP DM template?\",\"answer\":\"Require inclusion of the Project Manager's signature, currently treated as optional, because the DM includes the Management Agreement that defines the Project Manager's control, authority, and accountability.\"}]","Key Decision Point(KDP)Meeting and Decision Memorandum(DM)Guidance | PDF",[144,148,152,156],{"page_no":22,"url":145,"width":146,"height":147},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/31a012530a95d0b6afcbab16cc7846a3.webp",983,1272,{"page_no":26,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/bb78d136fddcda0b07c08d7ec2233d33.webp",982,1270,{"page_no":30,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/dfe443ff636e9ac7ab112f7feca2fd69.webp",981,1269,{"page_no":33,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/4c1d2071bde2a5a9a66e4838b1b5d89f.webp",980,1268]