[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-512250-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-512250-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","kalindi-bypass-proposal-metro-station-entry-exit-proposed-underpass-approval-notes","KALINDI BYPASS PROPOSAL - Metro Station Entry Exit - Proposed Underpass Approval Notes","","Engineering drawing and approval notes for the Kalindi bypass proposal, covering extension of the existing Ashram flyover up to DND/Ring Road and integration points near metro station entry/exit. The content lists ROW widths, cycle track, pathway and green separator elements, and describes two option proposals (including right-turn provision and U-turn at DND intersection). It records meeting references, approvals by the governing body dated 22.06.2017 and conditions for evaluating conceptual drawings, following IRC/BIS and UTTIPEC guidelines, and obtaining statutory clearances and permissions for tree cutting.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/kalindi-bypass-proposal-metro-station-entry-exit-proposed-underpass-approval-notes/512250/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/kalindi-bypass-proposal-metro-station-entry-exit-proposed-underpass-approval-notes/512250.png","ImageObject",300,407,{"name":42,"@type":43},"นรินทร์","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-19","2026-10-06",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the Kalindi bypass proposal primarily addressing?","Question",{"text":62,"@type":63},"It addresses the extension of the existing Ashram flyover up to DND/Ring Road and how it should be integrated with metro station entry/exit and bypass elements.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What are the two main option approaches mentioned?",{"text":67,"@type":63},"Option-1 extends Ashram flyover over the Maharani Bagh intersection to enable right turn for Kilokari residents, while Option-2 proposes a U-turn at the DND intersection for traffic coming from Kilokari side.",{"name":69,"@type":60,"acceptedAnswer":70},"Which requirements are listed for executing the project?",{"text":71,"@type":63},"The notes require following IRC/BIS codes and UTTIPEC street design guidelines, preparing construction signages/markings and safety audits per standards, and obtaining statutory clearances and permissions for tree cutting.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},512250,1792173287,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":30,"preview_page_count":22,"preview_urls":144},2336475104957,"https://ap-avatar.wpscdn.com/avatar/22000c4c6bd8a5076e1?x-image-process=image/resize,m_fixed,w_180,h_180&k=1787554080175789136","45M ROW  \nLAJPAT NAGAR  \nKEY PLAN-auvara RdCycle Track(3.0m)一DND FLYWAY1+469Pathway (2.9n  \n64M RO  \nMathura Rd  \ne  \nNIZAMUDDIN  \nPROPOSED  \nPROPOSED METRO ALIGNMENT  \nFLYOVER  \n45MRoW  \nSUN LIGHT COLONY1  \n7.5M  \nDND FLYWAY  \nLAJPAT NAGAR  \nrOISBT  \n64M ROW  \nyranrauna uanan Miarg  \n7.5MルB  \n64M ROW  \nNIZAMUDDIN  \nEastern Ave  \nSchool Ln  \nBADARPUR BORDER  \n255M  \n64M Row  \nEscalatt  \n64M ROW  \nProposed Underpass Approvedin 52nd Governing BodyDated 13/01/2016METRO STATIONENTRY EXIT  \nGreen Separator(2.0m)  \nCyle Track(3.0m)  \nPathway (2.0m)  \nKALINDI BYPASS PROPOSAL64M ROWTO BE INTEGRATEDAPPROVAL OF UTTIPEC MINUTES  \nB  \n2.1MMETRO STATIONENTRY EXIT176.6MROW 64M(Zonal DevDTL COLONYROW 64M (Zonal Dev.Approaches of ProposedPlan -Zone FMPD 2021)This drawing was presented by PWD,GNCTD in Working Group-1-B meeting dated08.03.2017 under Pr.Secretary,PWD and in Governing Body meeting under Hon'bleGreen SeparatorPROPOSED DEVELOPMENTPROPOSED DEVELOPMENTLG Delhi on 22.06.2017.The recommendations and decision of these meetings are asCycle RikshawPlanting Zone.JUNCTION(SIGNALISED)ROW 64M(Zonal Dev.64Mfollows:ParkingPedestrian &PROPOSED BUSBAYPlan -Zone FMPD 2021)64M ROW64M BowGuoCycle Mix Path64M ROW15.0MElevated portionPROPOSED DEVELOPMENTTO NOIDA64M ROW64M ROW64M Row64M ROWPedestrian &Cycle Mix Pathn64M ROW64M ROW64M ROW二a)Following two proposed options submitted &presented by PWD,GNCTD inCEXISTING FLYOVEREXISTING FLYOVERWorking Group meeting,they recommended providing right turn for vehicle onring road for the residents of Kilokarivilage towards Lajapat Nagar side.二EXISTING FLYOVEREXISTING FLYOVEROption-1 Extension of Ashram flyover over Maharani Bagh intersection&itslanding in front of Kilokari vilage for providing right turn for the people ofKilokari towards Lajapat Nagar side.  \n45MROw  \nKilokari Flyover  \n64M ROW  \nPlan -Zone F MPD 2021  \nPathway (2.5m)  \nMAHARANI BAGH  \n7.5M  \nPedestrian &  \nCycle Track(2.0m)  \nWorking Group-1I-B dated 08.03.2017:  \n64M ROW  \n姐  \n1+400  \n9.9M  \nOption-2Provision of U turn at DND intersection for traffic coming from Kilokari64MROW64M ROW64M ROW3village towards Lajapatnagar.64M ROWoption two is approve by working group meeting.4M ROWCycle Track -Bus Stop64MRow64yele Tre64M ROWROW 64M (Zonal Dev.Pathway -Pathway8b64MRo64M ROWb)Subsequently PWD resubmitted the proposal of extension of Ashram Flyover upto DND Flyover (earlier submitted option-1)and the same was presented bychief manager F-283,GNCTD in this WG-II-B meeting.PROPOSED DEVELOPMENTPlan-Zone F MPD 2021)-PROPOSED DEVELOPMENTObservationPedestrian &METRO STATIONROW 64M (Zonal Dev.ENTRY EXIT              295.8M   Cycle Mix PathPlan-Zone FMPD 2021)208.5MPWD to integrate Kalindi bypass interchange in the proposal.RecommendationPROPOSED UNDERPASS140.1MWorking group recommended the proposal for uploading on UTTIPEC websiteor community feedback and accordingly for consideration of the Governing Body  \n10.5M  \n+300  \n1+200  \n0+700  \n64M ROw64M ROW  \n1+100  \n0+800  \n+000  \nRamp connecting Existing Ashram Flyoverand Proposed Kilokari Flyover  \nApproach of Proposed Kilokari Flyover  \nMETRO STATIONENTRY EXIT  \nGAs  \nPILLAR 10  \nPathway  \n7.5M  \nSTRUCTURE TYPE  \nMPROVEM3NTTYPE  \nCHAINAG3  \n5TRUCTURE NO  \nNVERTLEVE  \nSPAN×ARRANGEMENT  \nREF DRG  \n曼7Decision of the Governing Body dated 22.06.2017  \nDESCRIPTION  \nKALINDI COLONY  \nFoot Over Bridge  \nThe Governing Body approved the proposal of extension of existing Ashram flyoverupto DND/Ring Road.MAHARANI BAGH  \n45M ROW  \n■EASTERN AVE  \nMPROVEMENT TYPESTROCTURE.TYPE  \nSTRUCTUREN0  \nCHAINAGE  \nSPAN×ARRANGEMEN  \nINVERT LEVEL  \nB0×cULVERT  \nREF DRG  \nDESCRIPTION  \nEXISTING  \n1035  \n1×2.15m  \n204.681  \nNOTE:上册赛淋日睾。1.Approval of Govening Body is for Transportation and Circulation Plan onlyKALINDI BYPASS PROPOSAL2.This is the conceptual drawing and detailed engineering design is to be evaluatedby Road Owning Agency.GEXISTNGASHRAMFLYOVERLAJPAT NAGARFLYOVERTO BE INTEGRATED3.Structural engineering safety/road geometric ","cbCais4pnCNUHR8d","https://ap.wps.com/l/cbCais4pnCNUHR8d","pdf",7152152,"English","# Proposed Development Overview\n## Options and Recommendations\n## Approval and Notes","[{\"question\":\"What is the Kalindi bypass proposal primarily addressing?\",\"answer\":\"It addresses the extension of the existing Ashram flyover up to DND/Ring Road and how it should be integrated with metro station entry/exit and bypass elements.\"},{\"question\":\"What are the two main option approaches mentioned?\",\"answer\":\"Option-1 extends Ashram flyover over the Maharani Bagh intersection to enable right turn for Kilokari residents, while Option-2 proposes a U-turn at the DND intersection for traffic coming from Kilokari side.\"},{\"question\":\"Which requirements are listed for executing the project?\",\"answer\":\"The notes require following IRC/BIS codes and UTTIPEC street design guidelines, preparing construction signages/markings and safety audits per standards, and obtaining statutory clearances and permissions for tree cutting.\"}]","KALINDI BYPASS PROPOSAL - Metro Station Entry Exit - Proposed Underpass Approval Notes | PDF",1791267477,[145],{"page_no":22,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/3a0ec70807f7b58312964e837187f612.webp",983,460]