[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650386-105":59,"doc-detail-650386-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","jitume-digital-lab-basic-lab-option-ground-floor-plan-elevation-sections-structural-general-notes","JITUME DIGITAL LAB-BASIC LAB OPTION - Ground Floor Plan - Elevation Sections - Structural General Notes","","Architectural and structural drawing set for the JITUME Digital Lab (basic lab option), including labeled elevation views and a ground floor plan. The notes specify walling and finish build-ups, window and door dimensions, roofing pitch and sheet gauge, foundation and slab layers, and drainage/vent detailing. General requirements include copyright and no-scaling rules, site verification of levels and dimensions, reporting discrepancies, and compliance with relevant specifications and engineer drawings.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/jitume-digital-lab-basic-lab-option-ground-floor-plan-elevation-sections-structural-general-notes/650386/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/jitume-digital-lab-basic-lab-option-ground-floor-plan-elevation-sections-structural-general-notes/650386.png","ImageObject",300,407,{"name":92,"@type":93},"Blue Pony","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-31","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the key instructions in the drawing’s general notes?","Question",{"text":112,"@type":113},"The drawing must be read with relevant architectural drawings, dimensions are in millimetres, and the drawing should not be scaled; indicated dimensions must be used.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should levels and dimensions be handled before building work starts?",{"text":117,"@type":113},"All levels and dimensions must be checked on site before any building work commences.",{"name":119,"@type":110,"acceptedAnswer":120},"Which concrete mix classes and reinforcement standards are specified?",{"text":121,"@type":113},"Concrete mixes are given by class (e.g., blinding class 15; slab/beams/columns class 20; beams/slab class 25) and reinforcement bars must follow B.S. 4449 with mesh fabric from cold worked steel bars per B.S. 4483.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650386,1792825261,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},962090760266,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","| |  | 700 mm high R.C gutter\u003Cbr>beam plaster and paint~~ ~~\u003Cbr>to finish\u003Cbr>|  | \u003Cbr>200 mm thick yellow ~~ ~~stone machine cut walling key to finish |  | 700 mm high R.C\u003Cbr>gutter beam  plaster and paint\u003Cbr>to finish\u003Cbr>\u003Cbr>\u003Cbr>200 mm thick yellow ~~ ~~ stone machine cut walling key to finish\u003Cbr>\u003Cbr>700 mm high R.C   gutter beam\u003Cbr>plaster and paint\u003Cbr>to finish |  |  |  | Notes:\u003Cbr>1. This drawing is copyright\u003Cbr>2. Do not scale off this drawing\u003Cbr>3. All levels and dimensions to be checked on site before any building work commences\u003Cbr>4. Any discrepancies to be reported to the office of the consultant\u003Cbr>5. All work to be strictly in accordance to with the standard specifications and notes\u003Cbr>6. This drawing is to be read in conjunction with specifications and all other relevant drawings\u003Cbr>7. Walls below 200 mm thick to be reinforced with hoop iron at every alternate course\u003Cbr>8. Depth of foundations to be decided on site\u003Cbr>9. pv denotes permanent air vents over doors and windows as shown on drawings\u003Cbr>10. A single layer of 3-ply bituminous felt to be provided between masonry and [r.c. work](r.c. work)\u003Cbr>11. Drain pipes passing under tarmac, driveways, and buildings to be encased in 150 mm thick concrete sorround\u003Cbr>12. All reinforced concrete work to Structural Engineer 's drawings\u003Cbr>13. All sanitary works to the entire satisfaction of MoH\u003Cbr>14. All internal doors to be semi solid core doors with mahogany veneer facing\u003Cbr>Client:\u003Cbr>MINISTRY OF INFORMATION COMMUNICATION AND TECHNOLOGY |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | \u003Cbr>|  |  |  |  |  |  |  |  |  |  |\n|  |  | 200 mm thick blue masonry walling\u003Cbr>key to finish | | | 200 mm thick blue masonry walling\u003Cbr>key to finish | 200 mm thick blue masonry walling\u003Cbr>key to finish\u003Cbr>900 mm x\u003Cbr>2,400 mm steel casement doors\u003Cbr>ELEVATION L [--]04 SCALE-1:75 | | \u003Cbr>\u003Cbr>200 mm thick blue masonry walling\u003Cbr>key to finish\u003Cbr>Approved ~~ ~~signage sections\u003Cbr>for the building |  |  |  |\n|  |  |  |  | 1,800 mm X\u003Cbr>2,400 mm steel\u003Cbr>casement door |  |  |  |  |  |  |  |\n|  | | ELEVATION L [--]02 SCALE-1:75 |  |  |  |  |  |  |  |  |  |\n|  | L [ --]05\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  |  |  |\n|  |  | 700 mm high R.C\u003Cbr>gutter beam  plaster and paint\u003Cbr>to finish\u003Cbr>\u003Cbr>\u003Cbr>200 mm thick yellow stone ~~ ~~ machine cut walling key to\u003Cbr>finish\u003Cbr>\u003Cbr>700 mm high R.C\u003Cbr>  gutter beam\u003Cbr>plaster and paint to finish |  |  |  |  |  |  |  |  |  |\n|  |  | 1,500 mm x\u003Cbr>2, 100 mm\u003Cbr>Mildsteel window with 6 mm thick\u003Cbr>sheet glass to\u003Cbr>schedule. 200 mm thick blue\u003Cbr>masonry walling key to finish |  |  |  | 1,500 mm x 2, 100 mm\u003Cbr>Mildsteel window with 6 mm thick sheet glass to schedule. 200 mm thick blue\u003Cbr>masonry walling key to finish |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  | Project Title:\u003Cbr>\u003Cbr>PROPOSED JITUME\u003Cbr>DIGITAL HUB PROJECT.\u003Cbr>\u003Cbr>Architect:\u003Cbr> ARCH. MORIS MUCHERU  Registration No   Signature:  KENYA SCHOOL OFTVETS. NAIROBI |  |\n|  |  | ELEVATION L [--]03 SCALE-1:75 |  |  |  |  |  |  |  |  |  |\n| L [--]01 GROUND FLOOR PLAN |  |  |  |  |  |  |  |  |  |  |  |\n| \u003Cbr>\u003Cbr>|  | 200 mm thick blue\u003Cbr>masonry walling key to finish\u003Cbr>\u003Cbr>1,500 mm x 2, 100 mm Mildsteel\u003Cbr>~~ ~~window with 6 mm thick sheet\u003Cbr>to schedule.\u003Cbr>glass\u003Cbr>\u003Cbr>ELEVATION L [--]05 SCALE-1:75\u003Cbr>\u003Cbr>200 mm thick yellow\u003Cbr>~~ ~~ stone machine cut walling key to finish\u003Cbr>Approved ~~ ~~ signage sections\u003Cbr>for the building\u003Cbr>\u003Cbr>700 mm high R.C   gutter beam\u003Cbr>plaster and paint to finish\u003Cbr>200 mm thick blue\u003Cbr>masonry walling\u003Cbr>key to finish\u003Cbr>1,500 mm x 2, 100 mm   Mildsteel window with\u003Cbr>6 mm thick sheet glass to schedule. |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  | Drawn:\u003Cbr>M. M. M | Checked: |\n|  |  |  |  |  |  |  |  |  |  | Date:\u003Cbr>03 November 2023 | Scale: |\n|  |  | 5 degree roof pitch with IT5\u003Cbr>\u003Cbr>700 mm high R.C gutter beam plaster and paint to finish\u003Cbr>200 mm thick plaster and paint to finish internally.\u003Cbr>1,500 mm x 2, 100 mm","cbCaiujTuGDPlmf8","https://ap.wps.com/l/cbCaiujTuGDPlmf8","pdf",1424387,"English","# Project and drawing identification\n## Client and architect information\n## Job and drawing numbers\n# General notes and compliance requirements\n## Reading with related drawings and specifications\n## Dimensions, concrete mixes, and reinforcement standards\n# Architectural elevations\n## Elevation L [--]01\n## Elevation L [--]02\n## Elevation L [--]03\n## Elevation L [--]04\n## Elevation L [--]05\n## Elevation L [--]06\n# Plans and sections\n## Ground floor plan\n## Section L [--]06","[{\"question\":\"What are the key instructions in the drawing’s general notes?\",\"answer\":\"The drawing must be read with relevant architectural drawings, dimensions are in millimetres, and the drawing should not be scaled; indicated dimensions must be used.\"},{\"question\":\"How should levels and dimensions be handled before building work starts?\",\"answer\":\"All levels and dimensions must be checked on site before any building work commences.\"},{\"question\":\"Which concrete mix classes and reinforcement standards are specified?\",\"answer\":\"Concrete mixes are given by class (e.g., blinding class 15; slab/beams/columns class 20; beams/slab class 25) and reinforcement bars must follow B.S. 4449 with mesh fabric from cold worked steel bars per B.S. 4483.\"}]","JITUME DIGITAL LAB-BASIC LAB OPTION - Ground Floor Plan - Elevation Sections - Structural General Notes | PDF"]