[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-676042-105":59,"doc-detail-676042-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","jcb-power-pack-125qe-150qe-quick-start-guide","JCB POWER PACK 1.25QE - 1.50QE - Quick Start Guide","","Quick Start Guide for JCB POWER PACK single-phase models 1.25QE and 1.50QE, covering operational basics and key technical reference data. Provides model dimensions and volumes, storage capacity, discharge limits, and continuous output specifications, plus identification of lifting points, tie-down points, ventilation, control screen, MCB, and emergency stop. Includes general pre-use checks, installation cautions, generator sizing guidance, start-up instructions with control-panel initialization behavior, and notes on generator autostart terminal triggering thresholds.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/jcb-power-pack-125qe-150qe-quick-start-guide/676042/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/jcb-power-pack-125qe-150qe-quick-start-guide/676042.png","ImageObject",300,407,{"name":92,"@type":93},"OKfine","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-04",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"Does the Quick Start Guide replace the Operators Manual?","Question",{"text":111,"@type":112},"No. It does not replace the Operators Manual, and all disclaimers, safety, and other instructions must be read before initial operation.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What should be checked before first starting the power pack?",{"text":116,"@type":112},"After correct installation, perform a full check including visual inspection for damage, ensure ventilation grilles are unobstructed, verify load cable connections and wire condition, confirm placement on flat level ground, avoid standing water, and prevent impact damage.",{"name":118,"@type":109,"acceptedAnswer":119},"How does generator autostart work with the power pack?",{"text":120,"@type":112},"Generator autostart terminals energise when site load exceeds 8kW and de-energise once load drops below 6kW. They also de-energise when battery level drops below 5% and re-energise above 95%.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},676042,1793774706,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},962093957596,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Quick Start Guide  \nJCB POWER PACK 1.25QE – 1.50QE  \nDISCLAIMER  \n> This Quick Reference Guide is to provide quick and simple information to the Operator and does not include any health and safety aspects. In addition, because of our continual development of machines, features described in this Quick Reference Guide may differ from those on your machine. No errors and emissions be entirely ruled out.  \n> This Quick Reference Guide DOES NOT replace the Operators Manual. You MUST read ALL the disclaimers and safety and other instructions in the Operators Manual before initially operating this product. Accordingly, no legal claims can be entertained on the basis of the data, illustrations or descriptions in this Quick Reference Guide.  \nThis machine should not be operated by any person who isn’t appropriately qualified or had the appropriate training.  \nOperation of this machine without periodic maintenance could cause it to malfunction. For more information please contact your JCB Dealer.  \nINDEX  \nDisclaimer 2  \nDimensions & Volumes 4  \nKey Components 5  \nGeneral Checks 8  \nStart Up Instructions 9  \nControl Panel Overview 10  \nLifting 11  \nPositioning 12  \nStacking 13  \nEmergency Stops 14  \nFAQ 15  \nDIMENSIONS & VOLUMES  \n\n| MODEL | 1.25QE | 1.50QE |\n| --- | --- | --- |\n| Single Phase Output – V | 230 | 230 |\n| Total Storage Capacity-kWhr | 23 | 46 |\n| Maximum Recommended Depth Of Discharge- % | 90 | 90 |\n| Capacity To 90% Depth Of Discharge-kWhr | 20 | 41 |\n| Continuous Output At 25˚C-kW | 8 | 8 |\n| Length | 1000 | 1000 |\n| Width | 1000 | 1000 |\n| Height | 1000 | 1000 |\n| Weight | 530 | 665 |\n\nKEY COMPONENTS  \nSide View  \n\n| A | Lifting Points (x4) |\n| --- | --- |\n| B | Tie down points (x4) |\n| C | Fork pockets |\n| D | Ventilation grilles |\n| E | Control |\n| F | Connections |\n\nIsometric view for clarity  \nKEY COMPONENTS - CONTROLS  \n| A | Control Screen |\n| --- | --- |\n| B | MCB |\n| C | ON / OFF Buttons |\n| D | Emergency Stop |\n| E | Generator Autostart Terminals |\n\nKEY COMPONENTS - CONNECTIONS  \n| F | 16A Maintenance Charge Connection |\n| --- | --- |\n| G | 32A Power Out |\n| H | 63A Charge Connection |\n| J | 63A Power Out |\n\nGENERAL CHECKS  \nBefore Use  \nAfter correct installation of the unit, the power pack must be fully checked over before first starting can be attempted. Points to check include:  \n• A visual inspection for signs of damage.  \n• Ensure all ventilation grilles are unobstructed (300mm free air recommendation) .  \n• Check the load cables to ensure all connections are firmly installed in the correct position, and that wires are in good condition.  \n• Ensure the power pack is located on flat level ground.  \n• Ensure the power pack is located to prevent sitting in standing water.  \n• Ensure that the power pack is located so as to avoid impact damage  \nIMPORTANT  \nIf you are using a generator to recharge your JCB Power Pack then it is essential that the generator is correctly sized. This should be either a dedicated single phase generator, or a 3 phase generator that is suitably sized to prevent an excessive phase imbalance.  \nSTART UP INSTRUCTIONS  \nIMPORTANT  \nPressing the red OFF button (F) will isolate the batteries but will still allow passthru from the AC input to the load.  \nThe Emergency stop (D) will isolate the output connections from all sources  \n\n| 1. Ensure MCB (B) are in the ON position. |\n| --- |\n| 2. Press and hold the Green START button (C) for 10-20 seconds until the start relay engages. |\n| 3. Control panel (A) will start its initialisation (c20 seconds) . |\n| 4. Once active the control panel display will indicate current status. |\n| 5. Unit is now connected to load. |\n|  |\n| NOTE: Generator autostart terminals (E) will energise if site load exceeds 8kW (de-energise once it drops back below 6kW) or if the battery level drops below 5%(de-energise above 95%) |\n\nCONTROL OVERVIEW  \n| A | Input Supply |\n| --- | --- |\n| B | Inverter Status (detail below) |\n\n\n| \u003Cbr>Inverting | No AC input, batteries onl","cbCaioAWgHZOhey8","https://ap.wps.com/l/cbCaioAWgHZOhey8","pdf",1038928,17,"English","# Disclaimer\n# Dimensions & Volumes\n# Key Components\n## Key Components - Controls\n## Key Components - Connections\n# General Checks\n# Start Up Instructions\n# Control Panel Overview\n# Lifting\n# Positioning\n# Stacking\n# Emergency Stops\n# FAQ","[{\"question\":\"Does the Quick Start Guide replace the Operators Manual?\",\"answer\":\"No. It does not replace the Operators Manual, and all disclaimers, safety, and other instructions must be read before initial operation.\"},{\"question\":\"What should be checked before first starting the power pack?\",\"answer\":\"After correct installation, perform a full check including visual inspection for damage, ensure ventilation grilles are unobstructed, verify load cable connections and wire condition, confirm placement on flat level ground, avoid standing water, and prevent impact damage.\"},{\"question\":\"How does generator autostart work with the power pack?\",\"answer\":\"Generator autostart terminals energise when site load exceeds 8kW and de-energise once load drops below 6kW. They also de-energise when battery level drops below 5% and re-energise above 95%.\"}]","JCB POWER PACK 1.25QE - 1.50QE - Quick Start Guide | PDF",43]