[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663183-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663183-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","january-2026-ncdot-project-delivery-network-stage-0-project-initiation","January 2026 NCDOT Project Delivery Network - Stage 0 - Project Initiation","","January 2026 NCDOT Project Delivery Network lays out a structured set of delivery activities across multiple stages, centered on project initiation and progressing toward final plans. It specifies tasks such as traffic volume and analysis completion, structures screening, railroad impact identification, roadway coordination, safety planning, geospatial data provision, complete streets review, and utility and environmental needs initiation. Later stages include geotechnical verification, utility coordination and design, pavement and permitting finalization, ROW acquisition surveys, NEPA/SEPA coordination, and preparation for PS&E package delivery and advertisement.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/january-2026-ncdot-project-delivery-network-stage-0-project-initiation/663183/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/january-2026-ncdot-project-delivery-network-stage-0-project-initiation/663183.png","ImageObject",300,407,{"name":42,"@type":43},"Connor ","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What activities are included in Stage 0 of the NCDOT Project Delivery Network?","Question",{"text":62,"@type":63},"Stage 0 covers completion of CTP/MTP, development of utility relocation and cost estimates, STIP and project prioritization, early express design work, ITS investigations, corridor coordination, survey and mapping setup, complete street and geotechnical planning, utility and environmental scoping, public engagement, value management, aerial mapping compilation, and NEPA/SEPA coordination through traffic forecast and initiation handoff.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How does the document handle NEPA/SEPA work across stages?",{"text":67,"@type":63},"It initiates NEPA/SEPA coordination during Stage 0, revisits NEPA/SEPA documentation in later phases, and continues into final plan activities, including completing NEPA/SEPA documentation prior to advertisement and letting.",{"name":69,"@type":60,"acceptedAnswer":70},"What are the key deliverables that lead toward PS&E in later stages?",{"text":71,"@type":63},"The document includes verification and finalization tasks such as geotechnical deliverables, utility coordination and/or design, pavement design updates, erosion and sediment control plans, hydraulic permitting activities, final mapping updates, railroad coordination and agreements, ROW acquisition surveys, transportation management and operations planning, and preparation of the PS&E package before project advertisement.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663183,1793225661,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},687207022233,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","January 2026 NCDOT Project Delivery Network  \nSTAGE 1  \nPROJECT INITIATION  \nComplete Express Design Traffic Volume (1TP1)  \nStructures Screening  \n(1ST1)  \nIdentify Railroad Impacts (1RR1)  \nInitiate Roadway Coordination (1RD1)  \nAssess Safety Planning (1TS1)  \nComplete Express Design Traffic Analysis (1TM1)  \nProvide Best Available Geospatial Data (1PH1)  \nInitiate Complete Streets Review (1IM1)  \nSTAGE 0  \nComplete CTP/MTP  \n(including Project Sheets)  \n(0TP1)  \nDevelop Initial Utility Relocation & Construction Estimates (1UT1)  \nPrepare Conceptual ROW Cost Estimate (1RW1)  \nPrepare Conceptual Construction Cost Estimate (1CS1)  \nDevelop STIP  \n(1SI1)  \nComplete Project Prioritization (1SP1)  \n  Complete Express  Design (1FS1)  \nInvestigate Existing ITS & Signal Communications (1SG1)  \nDetermine Affected  \nCoordinated Corridors (if not a Sig. Project) (1SS1)  \nProvide Photogrammetric Control & Initiate Surveys (1LS1)  \nReview Complete Street Elements (1IM2)  \nGeotechnical, Geopavement & GeoEnvironmental Planning (1GT1)  \nScope Traffic System Operations (1TO1)  \nInvestigate Existing Utilities (1UT2)  \nEstablish Environmental Needs  \n(1EN1)  \nReview Project Scoping (1CG1)  \nInitiate Public Engagement Tasks (1PI1)  \nInitiate Value Management Activities (1VM1)  \nCompile Aerial Photography & Mapping (1PH2)  \nInitiate NEPA/SEPA Coordination (1EP1)  \nComplete Traffic Forecast (1TP2)  \nLead Team Through Project Initiation Handoff (1PM1)  \nSTAGE 3 STAGE 4  \nFINAL PLANS PLANS, SPECS, & ESTIMATES (PS&E)  \nVerify Geotechnical Deliverables (3GT2)  \nComplete Utility Coordination and/or Design (3UT1)  \nVerify and Revise Pavement Design (3PD1)  \nComplete Erosion & Sediment Control Plans (3RE1)  \nComplete Hydraulic Permitting Tasks and Finalize Plans (3HY1)  \nUpdate Existing Mapping or Extend Mapping (3PH1)  \nComplete Railroad Coordination (3RR2)  \nInitiate Utility Relocations by Others (3UT2)  \nRevisit NEPA/SEPA Documentation (3EP1)  \nGeoEnvironmental Phase II (3GT1)  \nFinalize Railroad Design & Agreements (3RR1)  \nComplete ROW Acquisition Surveys (4LS1)  \nHydraulic Let Preparation (4HY1)  \nComplete Transportation Management Plan (3TM1)  \nComplete Additional Surveys & Initiate ROW Acquisition Surveys (3LS1)  \nInitiate Signal System Timing (if not a Sig.Project)  \n(3SS1)  \nAdvance Transportation Operations Plan (if Sig.Project)  \n(3TO1)  \nIncorporate Value Management Activities (3VM1)  \nManage  \nGeoEnvironmental Impacts (4GT1)  \nFinalize Utility Coordination and/or Utility Design PS&E (4UT1)  \nComplete Roadway Design (3RD1)  \nApply for Permits  \n(3EN1)  \nComplete Structures Design (3ST1)  \nComplete ROW Acquisitions & Relocations (3RW2)  \nComplete Value Management Activities (4VM1)  \nComplete Signing & Delineation Design (3SD1)  \nComplete Signal & ITS Design (3SG1)  \nSecure Permits  \n(4EN1)  \nPrepare Construction Communications Activities (4CG1)  \nFinalize Structures Design PS&E (4ST1)  \nFinalize ROW Authorization Package (3RW1)  \nSignal Timing  \nImplementation (if not a Sig.Project) (4SS1)  \nComplete Street Review Update(4IM1)  \nFinalize Erosion & Sediment Control Contract Package (4RE1)  \nComplete PS&E Package and Advertise the Project (4CS1)  \nComplete NEPA/SEPA Documentation (4EP1)  \nComplete Transportation Operations Plan-Related Tasks (4TO1)  \nComplete Streets Project Design Review (3IM1)  \nComplete Safety Analysis & Operational Review (3TS1)  \nFinalize the PS&E Package (4RD1)  \nLet, Award, and Execute (4CS2)  \nComplete Utility Relocations by Others (4UT2)  \nLead Team Through Final Plans (3PM1)  \n15 Month Let Review  \n(3PM2)  \nDesign Complete Review (3PM3)  \nLead Team Through  \nPS&E  \n(4PM1)  \nPS&E Review  \n(4PM2)  \nStage 5*  \n*See respective Stage 5 activities throughout the PDN.","cbCaiqQG6pqUxab1","https://ap.wps.com/l/cbCaiqQG6pqUxab1","pdf",1836300,"English","# STAGE 0\n## Complete CTP/MTP (including Project Sheets)\n## Develop Initial Utility Relocation & Construction Estimates\n## Prepare Conceptual ROW Cost Estimate\n## Prepare Conceptual Construction Cost Estimate\n## Develop STIP\n## Complete Project Prioritization\n## Complete Express Design\n## Investigate Existing ITS & Signal Communications\n## Determine Affected Coordinated Corridors\n## Provide Photogrammetric Control & Initiate Surveys\n## Review Complete Street Elements\n## Geotechnical, Geopavement & GeoEnvironmental Planning\n## Scope Traffic System Operations\n## Investigate Existing Utilities\n## Establish Environmental Needs\n## Review Project Scoping\n## Initiate Public Engagement Tasks\n## Initiate Value Management Activities\n## Compile Aerial Photography & Mapping\n## Initiate NEPA/SEPA Coordination\n## Complete Traffic Forecast\n## Lead Team Through Project Initiation Handoff","[{\"question\":\"What activities are included in Stage 0 of the NCDOT Project Delivery Network?\",\"answer\":\"Stage 0 covers completion of CTP/MTP, development of utility relocation and cost estimates, STIP and project prioritization, early express design work, ITS investigations, corridor coordination, survey and mapping setup, complete street and geotechnical planning, utility and environmental scoping, public engagement, value management, aerial mapping compilation, and NEPA/SEPA coordination through traffic forecast and initiation handoff.\"},{\"question\":\"How does the document handle NEPA/SEPA work across stages?\",\"answer\":\"It initiates NEPA/SEPA coordination during Stage 0, revisits NEPA/SEPA documentation in later phases, and continues into final plan activities, including completing NEPA/SEPA documentation prior to advertisement and letting.\"},{\"question\":\"What are the key deliverables that lead toward PS\\u0026E in later stages?\",\"answer\":\"The document includes verification and finalization tasks such as geotechnical deliverables, utility coordination and/or design, pavement design updates, erosion and sediment control plans, hydraulic permitting activities, final mapping updates, railroad coordination and agreements, ROW acquisition surveys, transportation management and operations planning, and preparation of the PS\\u0026E package before project advertisement.\"}]","January 2026 NCDOT Project Delivery Network - Stage 0 - Project Initiation | PDF"]