[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649601-105":3,"doc-detail-649601-en":80,"detail-sidebar-cat-0-en-105":98},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","item-110s-street-excavation-specification","Item 110S - Street Excavation - Specification","","Street Excavation Item 110S sets requirements for excavating, handling, and disposing of excavated materials within the project right-of-way limits, and for constructing and finishing earthwork across the entire project. It specifies work governed by typical lines, grades, and cross sections, and links related tasks to other item specifications. The document defines applicable unit systems, submittals including permits and blasting permits, classification as unclassified excavation, required erosion and tree protection measures, utility protection procedures, tree-drip-line placement restrictions, construction methods for alignment, compaction, and embankment conformity, waste handling and replacement, blasting safety obligations, and measurement and payment methods.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/item-110s-street-excavation-specification/649601/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/item-110s-street-excavation-specification/649601.png","ImageObject",300,407,{"name":42,"@type":43},"วิน","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-25","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What work is governed by Item 110S Street Excavation?","Question",{"text":62,"@type":63},"Item 110S governs excavation and the satisfactory utilization or disposal of excavated material, and the construction, compaction, shaping, and finishing of earthwork in accordance with specified requirements, lines, grades, and typical cross sections.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What permits or submittals are required under 110S.2?",{"text":67,"@type":63},"Submittals may include a permit for utility adjustments in the right-of-way, a plan for removal and deposition of all Waste materials, and a Blasting Permit if blasting is required and allowed.",{"name":69,"@type":60,"acceptedAnswer":70},"How is street excavation measured and paid for under 110S.5 and 110S.6?",{"text":71,"@type":63},"Accepted street excavation is measured by Method A or B using cubic yard volumes based on average end areas, and planned quantities for Method B. Payment is made at the contract unit bid price for Street Excavation, with the bid price covering specified related work and necessary materials, equipment, tools, labor, and incidentals.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},649601,1792919825,{"code":4,"msg":81,"data":82},"success",{"doc_id":78,"user_id":83,"nickname":42,"user_avatar":84,"doc_module":4,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":86,"file_id":87,"file_url":88,"file_type":89,"file_size":90,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":91,"language":92,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":93,"faqs":94,"seo_title":95,"seo_description":12,"update_tm":96,"read_time":97},2336475104736,"https://ap-avatar.wpscdn.com/avatar/22000c4c5e0e5b17e70?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786591360781797222",8,"Current Version 11/18/04 Previous Versions 5/21/01, 8/18/00, 4/05/99, and 8/17/94  \nItem No. 110S Street Excavation  \n110S.1 Description  \nThis item shall govern: (1) the excavation and proper utilization or otherwise satisfactory disposal of all excavated material, of whatever character, within the right of way or other limits of the work indicated and (2) the construction, compaction, shaping and finishing of all earthwork on the entire project in accordance with the specification requirements herein outlined, in conformity with the required lines, grades and typical cross sections indicated on the Drawings or as directed by the Engineer or designated representative. When not otherwise included in the Contract Documents, this item shall include the Work described in specification Item Nos. 101S, \"Preparing Right of Way\", 102S,\"Clearing and Grubbing\", 104S, \"Removing Portland Cement Concrete\", 132S,\"Embankment\", 201S, \"Subgrade Preparation\" and 236S, “Proof Rolling”.  \nThis specification is applicable for projects or work involving either inch-pound or SI units. Within the text inch-pound units are given preference followed by SI units shown within parentheses.  \n110S.2 Submittals  \nThe submittal requirements of this specification item may include:  \nA. A permit when utility adjustments are made in the right-of-way,  \nB. A plan for removal and deposition of all 'Waste' materials, and  \nC. A Blasting Permit if blasting is required and allowed on the project.  \n110S.3 Classification  \nAll excavation shall be unclassified and shall include all materials encountered regardless of their nature or the manner in which they are removed.  \n110S.4 Construction Methods  \nPrior to commencement of this work, all required erosion control and tree protection measures shall be in place. The existing utilities shall be located and protected as specified in the Standard Contract Documents, Section 00700, \"General Conditions\"and/or indicated on the Drawings. A permit shall be required when utility adjustments are to be made in preparation for construction in the right-of-way, as specified in Section  \n5.2.0 of the City of Austin Utilities Criteria Manual.  \nConstruction equipment shall not be operated nor construction materials stockpiled under the canopies of trees, unless otherwise indicated on the Drawings. Excavation or embankment materials shall not be placed within the drip line of trees until tree wells are constructed, that conform to Item No. 610S, \" Preservation of Trees and Other Vegetation \" .  \nAll street excavation shall be performed as specified herein and shall conform to the established alignment, grades and cross sections. The Contractor will be required to set blue-tops for the subgrade along centerlines, at quarter points and curb lines or edge of  \nCurrent Version 11/18/04 Previous Versions 5/21/01, 8/18/00, 4/05/99, and 8/17/94  \npavement at intervals not exceeding 50 feet (15 meters) . Suitable excavated materials shall be utilized, insofar as practicable, in constructing any required embankments. The construction of all embankments shall conform to Item No. 132S, \"Embankment\" .  \nAll earth cuts for base and/or pavement structure construction shall be scarified to a uniform depth of at least 6 inches (150 millimeters) below the required finished subgrade elevation for the entire roadbed width. The material shall be mixed, reshaped by blading, sprinkled and then rolled in accordance with Section 2 of the City of Austin Specification Item 132S, \"Embankment”.  \nHigh PI materials (i.e. PI  20 %) which exhibit a Plasticity Index (PI) greater by 5 % than the surrounding materials or any materials with a moisture content greater than 2 percent (%) in excess of optimum moisture shall be classified as unsuitable and must be removed or manipulated to meet the above criteria before use.  \nUnsuitable excavated materials or excavation in excess of that needed for construction shall be known as \"Waste\" and shall become the property of ","cbCait9vlf9kn2AQ","https://ap.wps.com/l/cbCait9vlf9kn2AQ","pdf",3399471,165,"English","# 110S.1 Description\n## 110S.2 Submittals\n## 110S.3 Classification\n## 110S.4 Construction Methods\n## 110S.5 Measurement\n## 110S.6 Payment","[{\"question\":\"What work is governed by Item 110S Street Excavation?\",\"answer\":\"Item 110S governs excavation and the satisfactory utilization or disposal of excavated material, and the construction, compaction, shaping, and finishing of earthwork in accordance with specified requirements, lines, grades, and typical cross sections.\"},{\"question\":\"What permits or submittals are required under 110S.2?\",\"answer\":\"Submittals may include a permit for utility adjustments in the right-of-way, a plan for removal and deposition of all Waste materials, and a Blasting Permit if blasting is required and allowed.\"},{\"question\":\"How is street excavation measured and paid for under 110S.5 and 110S.6?\",\"answer\":\"Accepted street excavation is measured by Method A or B using cubic yard volumes based on average end areas, and planned quantities for Method B. Payment is made at the contract unit bid price for Street Excavation, with the bid price covering specified related work and necessary materials, equipment, tools, labor, and incidentals.\"}]","Item 110S - Street Excavation - Specification | PDF",1792802704,416,{"code":4,"msg":81,"data":99},[100,104,108,112,117,122,127,130,135,138,142],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},"Exam",70,"exam",{"id":113,"doc_module":4,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},5,"Comic",60,"comic",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},6,"Technology",50,"technology",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":125,"slug":126},7,"Healthcare",40,"healthcare",{"id":85,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":128,"slug":129},30,"research-report",{"id":131,"doc_module":4,"doc_module_name":25,"category_name":132,"show_sort_weight":133,"slug":134},9,"Religion & Spirituality",20,"religion-spirituality",{"id":133,"doc_module":4,"doc_module_name":25,"category_name":136,"show_sort_weight":133,"slug":137},"World Cup","world-cup",{"id":139,"doc_module":4,"doc_module_name":25,"category_name":140,"show_sort_weight":139,"slug":141},10,"Lifestyle","lifestyle",{"id":143,"doc_module":4,"doc_module_name":25,"category_name":144,"show_sort_weight":113,"slug":145},19,"General","general"]