[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662564-105":59,"doc-detail-662564-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","itb-rh-13-004-plans-submittal-process-detail-title","ITB-RH-13-004-Plans - submittal process - Detail Title","","Architect/engineering project cover sheet and drawing index for a city-owned development, listing multiple drawing sets across civil/site, topographic survey/removal, grading and utility, construction plan details, architectural floor plans/elevations/sections, cold storage building modifications, and mechanical/electrical information, power and lighting plans, and details and schedules. General notes specify drawing scale rules, contractors’ responsibility for verifying dimensions and existing conditions, permit and site safety obligations, public protection during construction, and returning affected existing work to original condition.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/itb-rh-13-004-plans-submittal-process-detail-title/662564/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/itb-rh-13-004-plans-submittal-process-detail-title/662564.png","ImageObject",300,407,{"name":92,"@type":93},"Muffet","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What do the general notes require regarding drawing scale and dimensions?","Question",{"text":112,"@type":113},"The notes require that drawings not be scaled, and that any dimensional information not shown on dimension strings be obtained from the architect. Dimensions are finish surface of existing construction unless noted otherwise.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What are the contractor’s responsibilities before proceeding with work?",{"text":117,"@type":113},"The contractor must verify all existing dimensions and conditions, including materials and framing locations/sizes and construction methods. If discrepancies are found, the architect must be notified before work continues.",{"name":119,"@type":110,"acceptedAnswer":120},"Which drawing sets are included in the drawing index?",{"text":121,"@type":113},"The index includes civil/site and legend items, topo survey/removal plan, site plan, grading and utility plan, construction plan details, architectural abbreviations and floor plans/elevations/sections, cold storage modifications, and mechanical/electrical general information, power and lighting plans, and details/schedules.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662564,1793220208,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962090768927,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","| \u003Cbr>\u003Cbr>| \u003Cbr>ARCHITECT/ENGINEER:\u003Cbr>Orchard, Hiltz & McCliment 34000 Plymouth Rd. Livonia, MI 48150 734.522.6711 CONTACT-Wayde Hoppe\u003Cbr>Project Architect\u003Cbr>OWNER:\u003Cbr>City of Rochester Hills\u003Cbr>1000 Rochester Hills Drive Rochester Hills, Michigan 48309 248.841.2504\u003Cbr>CONTACT-Tracey Balint, P.E.\u003Cbr>Project Manager\u003Cbr>GENERAL NOTES: DRAWING INDEX:\u003Cbr>1. GENERAL NOTES APPLY TO ALL DRAWINGS\u003Cbr>2. DO NOT SCALE DRAWINGS. ANY DIMENSIONAL INFORMATION REQUIRED WHICH IS\u003Cbr>NOT INDICATED ON DRAWING DIMENSION STRINGS SHALL BE OBTAINED FROM THE ARCHITECT.\u003Cbr>3. DIMENSIONS SHOWN ARE FINISH SURFACE OF EXISTING CONSTRUCTION, UNLESS NOTED OTHERWISE.\u003Cbr>4. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS (I. E.\u003Cbr>EXISTING MATERIALS, FRAMING MEMBER SIZES AND LOCATIONS, METHODS OF CONSTRUCTION) . IF DISCREPANCIES ARE FOUND, NOTIFY ARCHITECT BEFORE PROCEEDING WITH WORK.\u003Cbr>5. CONTRACTOR SHALL PAY ALL PERMIT FEES.\u003Cbr>6. CONTRACTOR SHALL MAINTAIN THE IMMEDIATE CONSTRUCTION SITE IN A SECURE, CLEAN AND SAFE MANNER.\u003Cbr>7. PROTECTION: CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR TAKING ALL STEPS NECESSARY TO PROTECT THE PUBLIC FROM INJURY AND ADJACENT PROPERTY DAMAGES DURING CONSTRUCTION AS REQUIRED BY LOCAL CODES.\u003Cbr>8. REPAIR ALL EXISTING CONSTRUCTION AFFECTED BY NEW WORK TO ITS ORIGINAL CONDITION.\u003Cbr>COVER SHEET\u003Cbr>CIVIL\u003Cbr>C101 SITE / CIVIL LEGEND C201 TOPOGRAPHIC SURVEY / REMOVAL PLAN C301 SITE PLAN\u003Cbr>C401 GRADING AND UTILITY PLAN\u003Cbr>C501 CONSTRUCTION PLANS DETAILS\u003Cbr>ARCHITECTURAL\u003Cbr>A001 ABBREVIATIONS, SYMBOLS, CODE REVIEW A101 FLOOR PLAN\u003Cbr>A201 BUILDING ELEVATIONS\u003Cbr>A301 SECTIONS AND DETAILS\u003Cbr>A401 COLD STORAGE BUILDING MODIFICATIONS\u003Cbr>MECHANICAL/ELECTRICAL\u003Cbr>ME001 GENERAL MECH & ELECT INFORMATION ME101 POWER AND LIGHTING PLAN\u003Cbr>ME102 COLD STORAGE POWER PLAN\u003Cbr>ME401 DETAILS & SCHEDULES\u003Cbr>I Certify That The Architectural Plans Were Prepared Under My Direct Supervision\u003Cbr>I Certify That The Engineering Plans Were Prepared Under My Direct Supervision\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|\n| --- | --- |\n| \u003Cbr>\u003Cbr>|  |\n\n| |  |  | \u003Cbr>| |  | \u003Cbr>\u003Cbr>| | |  | \u003Cbr>\u003Cbr>\u003Cbr>WWW .OHM-ADV ISORS .COM\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| |  | |  | | |  |  | | |  |\n|  |  |  |  |  |  | \u003Cbr>| |  |  |  |\n|  |  |  |  |  |  | | |  |  |  |\n| | |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  | | | |  |  |\n|  |  |  |  |  |  |  |  | | |  |\n|  |  |  |  |  |  | | |  |  |  |\n| | |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  | |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n\n| \u003Cbr>DRAW ING PATH:  \u003Cbr>\u003Cbr>| \u003Cbr>\u003Cbr>WWW .OHM-ADV ISORS .COM\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|\n| --- | --- |\n\n| \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>| \u003Cbr>\u003Cbr>\u003Cbr>WWW .OHM-ADV ISORS .COM\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|\n| --- | --- |\n\nsubmittal process  \n1  DETAIL TITLE","cbCais1fkp481mzg","https://ap.wps.com/l/cbCais1fkp481mzg","pdf",8752010,15,"English","# General Notes\n## Drawing Index\n## Submittal Process\n## Detail Title","[{\"question\":\"What do the general notes require regarding drawing scale and dimensions?\",\"answer\":\"The notes require that drawings not be scaled, and that any dimensional information not shown on dimension strings be obtained from the architect. Dimensions are finish surface of existing construction unless noted otherwise.\"},{\"question\":\"What are the contractor’s responsibilities before proceeding with work?\",\"answer\":\"The contractor must verify all existing dimensions and conditions, including materials and framing locations/sizes and construction methods. If discrepancies are found, the architect must be notified before work continues.\"},{\"question\":\"Which drawing sets are included in the drawing index?\",\"answer\":\"The index includes civil/site and legend items, topo survey/removal plan, site plan, grading and utility plan, construction plan details, architectural abbreviations and floor plans/elevations/sections, cold storage modifications, and mechanical/electrical general information, power and lighting plans, and details/schedules.\"}]","ITB-RH-13-004-Plans - submittal process - Detail Title | PDF",38]