[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662676-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662676-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","issued-for-construction-project-drawing-notes","Issued for Construction - Project Drawing Notes","","Architecture Unfolded project contract drawing notes covering ownership and permitted use of drawings, service instrument status by the designer, and restrictions on reproduction without written permission. Responsibilities and limits are defined, including architect review of shop drawings for design conformance and no responsibility for contractor interpretation. The notes require no scaling, contractor verification of field conditions and reporting discrepancies, and governing location rules for mechanical/electrical items. They also specify code compliance requirements and disclaim warranties regarding constructability, plus project identification data such as drawing numbers and plan references.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/issued-for-construction-project-drawing-notes/662676/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/issued-for-construction-project-drawing-notes/662676.png","ImageObject",300,407,{"name":42,"@type":43},"Putri","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"Who owns the drawings and associated documents?","Question",{"text":62,"@type":63},"The drawings and all associated documents are the property of Architecture Unfolded and the contract documents are the property of the architect.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Can contractors reproduce or scale the drawings for construction?",{"text":67,"@type":63},"The drawings may not be reproduced in whole or in part without prior written permission. Drawings are not to be scaled for construction; the contractor must verify existing conditions and dimensions.",{"name":69,"@type":60,"acceptedAnswer":70},"What happens if there are discrepancies between existing conditions and the contract documents?",{"text":71,"@type":63},"The contractor must report any discrepancies with the contract documents to the architect before commencing work.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662676,1793221587,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},962085571259,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","The drawings are the property of Architecture Unfolded. The drawing and all associated documents are an instrument of service by the Designer. The drawing and the information contained therein may not be reproduced in whole or in part without prior written permission of the designer.  \nThese Contract Documents are the property of the architect. The architect bears no responsibility for the interpretation of these documents by the Contractor. Upon written application the architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The architect will review Shop Drawings submitted by the Contractor for design conformance only.  \nDrawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the work and report any discrepancies with the Contract Documents to the architect before commencing work.  \nPositions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on architectural drawings. The locations shown on the architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the architect.  \nThese drawings are not to be used for construction unless noted below as\"Issued for Construction\"  \nAll work to be carried out in conformance with the Code and bylaws of the authorities having jurisdiction.  \nThe Designer of these plans and specifications gives no warranty or representation to any party about the constructability of the represented by them. all contractors or subcontractors must satisfy themselves when bidding and at all times that they can properly construct the work represented by these plans.  \nnotes:  \narchitecture unfolded  \n3 issued for OLT 2 issued for ZBA 1 issued revisions:  \n12-03-25 02-10-24 14-02-24 dd-mm-yy  \narchitectural team :  \nmark zwicker rushad dastoornour abboud  \ninterior design:  \nplanning:  \nsajecki planning structural:  \nelectrical:  \nmechanical:  \nlandscape:  \nsite services:  \nowner:  \nproject:  \n3019 Dufferin St.  \ntoronto, ontario  \nP2 parking plan  \nfeb. 14,2025  \n1:50  \n13-12 na  \ndate: scale: project: drawn by:  \ntrue north  \nproject north  \ndrawing number:  \nA201  \nThe drawings are the property of Architecture Unfolded. The drawing and all associated documents are an instrument of service by the Designer. The drawing and the information contained therein may not be reproduced in whole or in part without prior written permission of the designer.  \nThese Contract Documents are the property of the architect. The architect bears no responsibility for the interpretation of these documents by the Contractor. Upon written application the architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The architect will review Shop Drawings submitted by the Contractor for design conformance only.  \nDrawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the work and report any discrepancies with the Contract Documents to the architect before commencing work.  \nPositions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on architectural drawings. The locations shown on the architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the architect.  \nThese drawings are not to be used for construction unless noted below as\"Issued for Construction\"  \nAll work to be carried out in conformance with the Code and bylaws of the authorities having jurisdiction.  \nThe Designer of these plans and specifications gives no warranty or representation to any party about the constructability of the represented by them. all contractors or subcontractors must satisfy themselves when bidding and at all times that they can p","cbCaiaWXTHeHw8TN","https://ap.wps.com/l/cbCaiaWXTHeHw8TN","pdf",7908797,11,"English","# General Contract Drawing Rules\n## Ownership, Permissions, and Liability\n## Scaling, Field Verification, and Discrepancies\n## Mechanical/Electrical Location Governing Rules\n## Code Compliance and Constructability Disclaimer","[{\"question\":\"Who owns the drawings and associated documents?\",\"answer\":\"The drawings and all associated documents are the property of Architecture Unfolded and the contract documents are the property of the architect.\"},{\"question\":\"Can contractors reproduce or scale the drawings for construction?\",\"answer\":\"The drawings may not be reproduced in whole or in part without prior written permission. Drawings are not to be scaled for construction; the contractor must verify existing conditions and dimensions.\"},{\"question\":\"What happens if there are discrepancies between existing conditions and the contract documents?\",\"answer\":\"The contractor must report any discrepancies with the contract documents to the architect before commencing work.\"}]","Issued for Construction - Project Drawing Notes | PDF",28]